Legal Resources New Petitions
Many Commission decisions are challenged or enforced in the Federal courts. The Office of the Solicitor, OGC, has independent authority to defend the Commission in court, typically the U.S. Courts of Appeals, unless the matter goes to the U.S. Supreme Court.
The defense normally entails preparing motions and briefs and presenting oral arguments before three-judge panels. It may also involve responding to petitions for writ of mandamus and requests to stay the underlying Commission action. At times, the Office files briefs as a "friend of the court," and in certain limited circumstances also defends the Commission or enforces its initiatives in the U.S. district courts.
-
Utility Workers Union of America Local 464 and Robert Clark v. FERC
No. 16-1408 (D.C. Cir. filed 11/23/2016)-
Results of 10th ISO-NE Forward Capacity Auction; bidding behavior and retirement of Brayton Point facility. ISO New England, Inc., 155 FERC
¶ 61,273
(2016), reh’g denied, 157 FERC ¶ 61,060
(2016).
FERC Docket No. ER16-1041 -
City of Osceola, Ark. v. FERC
No. 16-1401 (D.C. Cir. filed 11/17/2016)-
Denial of complaint seeking refund of rough production cost equalization bandwidth payments. City of Osceola, Arkansas v. Entergy Arkansas and Entergy Services, Inc., 154 FERC ¶ 61,099
(2016), reh’g denied, 156 FERC ¶ 61,184
(2016).
FERC Docket No. EL16-7 -
Louisiana Pub. Serv. Comm’n v. FERC
No. 16-1382 (D.C. Cir. filed 11/4/2016)-
Order on remand from LPSC v. FERC, 772 F.3d 1297 (D.C. Cir. 2014), concerning denial of refunds. Louisiana Pub. Serv. Comm’n, et al. v. Entergy Corp. and Entergy Services, Inc., 155 FERC ¶ 61,120
(2016), reh’g denied, 156 FERC ¶ 61,221
(2016).
FERC Docket No. EL00-66, et al. -
Michigan Public Service Commission and Verso Corp., et al. v. FERC
Nos. 15-1049, et al. and 16-1385, et al. (D.C. Cir. filed 11/4/2016 and later)-
Refund of previously-allocated costs associated with the operation of System Support Resource generating units, located in the American Transmission Co. service territory, under the MISO tariff. Pub. Serv. Comm’n of Wisconsin v. Midcontinent Indep. System Operator, Inc., et al., order on reh’g & compl., 150 FERC ¶ 61,104
(2015), and earlier orders; order on reh’g & clar., 156 FERC
¶ 61,205
(2016).
FERC Docket No. EL14-34 -
Alliance Pipeline L.P. v. FERC
Nos. 16-1017, et al. (D.C. Cir. filed 10/21/2016)-
Rates for natural gas transportation service; various rate issues, some summarily resolved and some set for hearing; acceptance, rejection, and suspension of, and hearing on, certain tariff records. Alliance Pipeline L.P.,
151 FERC ¶ 61,271
(2015), order on reh’g,
153 FERC ¶ 61,195
(2015), reh’g denied,
154 FERC ¶ 61,112
(2016);
153 FERC ¶ 61,362
(2015), reh’g denied,
155 FERC ¶ 61,119
(2016);
154 FERC ¶ 61,160
(2016), reh’g denied,
156 FERC ¶ 61,123
(2016).
FERC Docket No. RP15-1022, et al. -
ESI Energy, LLC v. FERC
No. 16-1342 (D.C. Cir. filed 9/30/2016)-
Assignment of costs of constructing network upgrade to interconnecting generator, based on tariff language and cost allocation policy; which version of PJM tariff to use. PJM Interconn., L.L.C.,
153 FERC ¶ 61,327
(2015), order on reh’g, compl. & clar.,
156 FERC ¶ 61,090
(2016) (on remand from West Deptford Energy v. FERC, D.C. Cir. 2014).
FERC Docket No. ER11-4073 -
Sierra Club, et al. v. FERC
Nos. 16-1329 and 16-1387 (D.C. Cir. filed 9/21/2016 and later)-
Order authorizing, subject to conditions, Florida Southeast, Transco, and Sabal Trail to construct and operate natural gas pipeline projects to serve Florida and southeast markets. Florida Southeast Connection, LLC, et al.,
154 FERC ¶ 61,080
(2016), order on reh’g,
156 FERC ¶ 61,160
(2016).
FERC Docket No. CP14-554, et al. -
MISO Transmission Owners v. FERC
Nos. 16-1325 and 16-1326 (D.C. Cir. filed 9/19/2016)-
Orders on 2013 and 2015 complaints challenging the MISO transmission owners’ return on equity, reflected in MISO’s tariff. Ass’n of Businesses Advocating Tariff Equity, et al. v. Midcontinent Indep. Sys. Operator, Inc., et al.,
149 FERC ¶ 61,049
(2014), order on reh’g,
156 FERC ¶ 61,060
(2016); and Arkansas Elec. Coop. Corp., et al. v. ALLETE, Inc., et al.,
151 FERC ¶ 61,219
(2015), order on reh’g,
156 FERC ¶ 61,061
(2016).
FERC Docket No. EL14-12, et al. -
BP America, et al. v. FERC
No. 16-60604 (5th Cir. filed 9/7/2016)-
Investigation into whether BP profited from market conditions in the aftermath of Hurricane Ike by manipulating the price of natural gas in the Houston region, in violation of FERC anti-manipulation regulations. BP America Inc., et al.,
147 FERC ¶ 61,130
(2014), order on initial decision & reh’g, Opinion No. 549,
156 FERC ¶ 61,031
(2016).
FERC Docket No. IN13-15 -
Arkansas Pub. Serv. Comm’n v. FERC
No. 16-1305 (D.C. Cir. filed 8/30/2016)-
Allocation of proceeds from a settlement agreement between Union Pacific and Entergy Arkansas, following withdrawal of Entergy Arkansas from Entergy System Agreement. Entergy Services, Inc., Opinion No. 547,
154 FERC ¶ 61,173
(2016), order on reh’g and compl.,
156 FERC ¶ 61,112
(2016).
FERC Docket No. ER13-432 -
Ameren Services Co., et al. v. FERC
No. 16-1304 (D.C. Cir. filed 8/29/2016)-
MISO tariff provisions for funding of network upgrades by interconnecting generators. Otter Tail Power Co. v. Midcontinent Indep. Sys. Op., Inc.,
151 FERC ¶ 61,220
(2015), order on reh’g & clar.,
153 FERC ¶ 61,352
(2015), reh’g denied,
156 FERC ¶ 61,099
(2016).
FERC Docket No. EL15-36, et al. -
Duke Energy Carolinas, LLC v. FERC
No. 16-1296 (D.C. Cir. filed 8/22/2016)-
Issuance of new license to continue operation and maintenance of 819 MW Catawba-Wateree Hydroelectric Project, located on the Catawba and Wateree Rivers in North Carolina and South Carolina. Duke Energy Carolinas, LLC,
153 FERC ¶ 62,134
(2015), order on reh’g & clar.,
156 FERC ¶ 61,010
(2016).
FERC Docket No. P-2232 -
ANR Storage Co. v. FERC
No. 16-1285 (D.C. Cir. filed 8/11/2016)-
Denial of market-based rate authority for natural gas storage service. ANR Storage Co., Opinion No. 538,
153 FERC ¶ 61,052
(2015), order on reh’g,
155 FERC ¶ 61,279
(2016).
FERC Docket No. RP12-479 -
ITC Midwest LLC v. FERC
Nos. 16-1272 and 16-1273 (D.C. Cir. filed 8/3/2016)-
Orders requiring ITC to recalculate and reduce its rates to simulate the taking of bonus depreciation for eligible facilities in its federal income taxes. Midcontinent Indep. System Operator, Inc. and ITC Midwest LLC, 154 FERC ¶ 61,187 (2016), order on reh’g & compl., 155 FERC ¶ 61,248 (2016); ITC Midwest LLC, 154 FERC ¶ 61,188 (2016), reh’g & reconsid. denied,
155 FERC ¶ 61,247 (2016).
FERC Docket No. ER15-1250, et al. -
City of Clarksville, Tennessee v. FERC
No. 16-1244 (D.C. Cir. filed 7/18/2016)-
Service area determinations for natural gas distribution facilities that extend across the Tennessee/ Kentucky border into Kentucky. City of Clarksville, Tenn.,
146 FERC ¶ 61,074
(2014), reh’g denied,
155 FERC ¶ 61,184
(2016).
FERC Docket No. CP13-508 -
United Airlines, Inc. and UPS Fuel Services, Inc. v. FERC and United States of America
No. 16-1245 (D.C. Cir. filed 7/16/2016)-
Order granting in part complaints, alleging that Enterprise has violated a settlement by no longer accepting nominations for the transportation of jet fuel or distillates, and establishing limited hearing on the issue of damages. CHS Inc., et al. v. Enterprise TE Products Pipeline Co., LLC; Chevron Products Co. v. Enterprise TE Products Pipeline Co., LLC,
145 FERC ¶ 61,056
(2013), order on reh’g,
155 FERC ¶ 61,178
(2016).
FERC Docket No. OR3-25, et al. -
MISO Transmission Owners v. FERC
No. 16-3791 (6th Cir. filed 7/15/2016)-
Financial obligations of a transmission owner withdrawing from MISO, for costs of regionally planned transmission projects. Midwest Indep. Transm. System Operator, et al., Op. No. 539,
153 FERC ¶ 61,101
(2015), reh'g denied,
155 FERC ¶ 61,174
(2016).
FERC Docket No. ER12-715, et al. -
Advanced Energy Management Alliance, et al. v. FERC
Nos. 16-1234, et al. (D.C. Cir. filed 7/8/2016 and later)-
Conditional acceptance of PJM’s proposal to establish a Capacity Performance Resource, on a phased-in basis, to provide greater assurance of delivery of energy and reserves during emergency conditions. PJM Interconnection, L.L.C., et al., 151 FERC ¶ 61,208 (2015), order on reh’g and compl., 155 FERC ¶ 61,157 (2016).
FERC Docket No. ER15-623, et al.
-
Comite Dialogo Ambiental, Inc. v. FERC and United States of America
No. 16-1229 (D.C. Cir. filed 7/5/2016)-
Order authorizing construction and operation of liquefied natural gas terminal on southern shore of Puerto Rico; various issues, including consultation process under the Endangered Species Act. Aguire Offshore GasPort, LLC, 152 FERC ¶ 61,071 (2015), reh’g denied, 155 FERC ¶ 61,139 (2016).
FERC Docket No. CP13-193
-
Ameren Services Co., et al. v. FERC
Nos. 16-1223, et al. (D.C. Cir. filed 7/1/2016 and later)-
Billings and allocations of costs associated with MISO’s real-time Revenue Sufficiency Guarantee program. Midwest Indep. Transm. System Operator, Inc., 127 FERC ¶ 61,241 (2009) and 132 FERC ¶ 61,185 (2010), reh’g denied, 155 FERC ¶ 61,126 and 61,127 (2016).
FERC Docket No. ER04-691, et al.
-
Alliance Pipeline L.P. v. FERC
No. 16-1207 (D.C. Cir. filed 6/24/2016)-
Rates for natural gas transportation service; various rate issues, some summarily resolved and some set for hearing; acceptance and rejection of certain tariff records. Alliance Pipeline L.P., 151 FERC ¶ 61,271 (2015), order on reh’g, 153 FERC ¶ 61,195 (2015), reh’g denied, 154 FERC ¶ 61,112 (2016); 153 FERC ¶ 61,362 (2015), reh’g denied, 155 FERC ¶ 61,119 (2016).
FERC Docket No. RP15-1022, et al.
-
Michigan Pub. Serv. Comm’n, et al. v. FERC
Nos. 16-1205, et al. (D.C. Cir. filed 6/24/2016 and later)-
Order on MISO’s proposed System Support Resource cost allocation methodology, assigning SSR costs directly to load-serving entities serving loads requiring the operation of various SSR units for reliability purposes. Midcontinent Indep. Sys. Operator, Inc., 152 FERC ¶ 61,216 (2015), order on reh’g and compl., 155 FERC ¶ 61,134 (2016).
FERC Docket No. ER14-2952, et al.
-
Occidental Chemical Corp. v. FERC
No. 16-1199 (D.C. Cir. filed 6/19/2016)-
Whether Entergy has an obligation under PURPA, on a service territory-wide basis, to purchase electric energy capacity from Qualifying Facilities larger than 20MW; whether Occidental rebutted presumption that MISO offers non-discriminatory access to wholesale markets. Entergy Services, Inc., et al., 154 FERC ¶ 61,035 (2016), reh’g denied, 155 FERC ¶ 61,069 (2016).
FERC Docket No. QM14-3
-
ExxonMobil Pipeline Co., ConocoPhillips Transp. Alaska, and BP Pipelines (Alaska) Inc. v. FERC and United States of America
Nos. 16-1196, et al. (D.C. Cir. filed 6/17/2016 and later)-
Filing of revised rates and preliminary refunds in compliance with Opinion No. 544; initiation of hearing procedures and direction to make preliminary refunds. BP Pipelines (Alaska) Inc., et al., 155 FERC ¶ 61,054 (2016).
FERC Docket No. IS11-335, et al.
-
Tucson Electric Power Co. v. FERC
No. 16-1194 (D.C. Cir. filed 6/17/2016)-
Refunds for late filing of, and unauthorized service under, FERC-jurisdictional agreements. Tucson Electric Power Co., 155 FERC ¶ 61,070 (2016), on rehearing of earlier delegated letter orders.
FERC Docket No. ER15-1861, et al.
-
Arkansas Pub. Serv. Comm’n v. FERC
No. 16-1193 (D.C. Cir. filed 6/16/2016)-
Entergy Arkansas’ responsibility for making bandwidth payments, despite withdrawal from Entergy System Agreement. Louisiana Pub. Serv. Comm’n v. Entergy Services, Inc., 153 FERC ¶ 61,032 (2015), order on reh’g & clar., 155 FERC ¶ 61,118 (2016).
FERC Docket No. EL01-88
-
American Rivers and Alabama Rivers Alliance v. FERC and U.S. Sec. of Interior
Nos. 16-1195, et al. (D.C. Cir. filed 6/15/2016 and later)-
Relicensing for the continued operation and maintenance of the Coosa River hydroelectric project; consideration of dissolved oxygen levels for the protection of aquatic species, and other issues. Alabama Power Co., 143 FERC ¶ 61,249 (2013), order on reh’g & clar., 155 FERC ¶ 61,080 (2016), reh’g denied, 156 FERC ¶ 61,171 (2016).
FERC Docket No. P-2146