Home
DAG Tutorial
Search
Available Downloads
Feedback
The DAG does not reflect the changes in the DoDI5000.02. Work is in progress to update the content and will be completed as soon as possible.
Help
Search for:
.
ACC Practice Center
>
AT&L Knowledge Management...
>
Welcome to the Defense...
>
DoD Instruction 5000.02
>
Enclosure 2 -- Procedures
>
Enclosure 2 -- 6. ...
Enclosure 2 -- 6. Engineering and Manufacturing Development (EMD) Phase
Topic
Version History
Version
Created By
Creation Date
Change reasons
Current
Private
Aug 1, 2011
2
Private
Aug 1, 2011
1
Private
Dec 15, 2009
Are you sure you want to delete this version?
Warning: This will cause the previous verison to become the current version
Yes
No
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
1.0. Overview
1.1. Integration of the DoD Decision...
1.2. Planning Programming Budgeting and...
1.3. Joint Capabilities Integration and...
1.4. Defense Acquisition System
Chapter 2 -- Program Strategies
Chapter 3 -- Affordability and...
Chapter 4 -- Systems Engineering
4.0. Overview
4.1. Introduction
4.2. Systems Engineering Activities in...
4.3. Systems Engineering Processes
Chapter 5 -- Life-Cycle Logistics
5.0. Overview
5.1. Life-Cycle Sustainment in the...
5.2. Applying Systems Engineering to...
5.3. Supportability Design...
5.4. Sustainment in the Life-Cycle...
5.5. References
Chapter 6 -- Human Systems Integration...
Chapter 7 -- Acquiring Information...
7.0. Overview
7.1. Introduction
7.2. DoD Information Enterprise
7.3. Interoperability and Supportability...
7.4. Sharing Data, Information, and...
7.5. Information Assurance (IA)
7.6. Electromagnetic Spectrum
7.7. Accessibility of Electronic and...
7.8. The Clinger-Cohen Act (CCA) --...
7.9. Post-Implementation Review (PIR)
7.10. Commercial Off-the-Shelf (COTS)...
7.11. Space Mission Architectures
Chapter 8 -- Intelligence Analysis...
Chapter 9 -- Test and Evaluation (T&E)
9.0 Overview
9.1 OSD T&E Organization
9.2 Service-Level T&E Management
9.3 Test and Evaluation
9.4 Integrated Test and Evaluation
9.5 Test and Evaluation Planning
9.6 T&E Reporting
9.7 Special Topics
9.8. Best Practices
9.9. Prioritizing Use of Government Test...
Chapter 10 -- Decisions Assessments and...
Chapter 11 -- Program Management...
11.0. Overview
11.1. Joint Programs
11.2. International Programs
11.3. Integrated Program Management
11.4. Knowledge-Based Acquisition
11.5. Technical Representatives at...
11.6. Contractor Councils
11.7 Property
11.8. Modeling and Simulation (M&S)...
Chapter 12 - Defense Business System...
Chapter 13 -- Program Protection
Chapter 14 -- Acquisition of Services
DoD Directive 5000.01
DoD Instruction 5000.02
TABLE OF CONTENTS
Enclosure 1 -- References
Enclosure 2 -- Procedures
Enclosure 2 -- 1. Defense Acquisition...
Enclosure 2 -- 2. Evolutionary...
Enclosure 2 -- 3. User Needs and...
Enclosure 2 -- 4. Materiel Solution...
Enclosure 2 -- 5. Technology...
Enclosure 2 -- 6. Engineering and...
Enclosure 2 -- 7. Production and...
Enclosure 2 -- 8. Operations and...
Enclosure 2 -- 9. Review Procedures
Enclosure 3 -- Acquisition Category...
Enclosure 4 -- Statutory and Regulatory...
Enclosure 5 -- IT Considerations
Enclosure 6 -- Integrated T&E
Enclosure 7 -- Resource Estimation
Enclosure 8 -- Human Systems Integration...
Enclosure 9 -- Acquisition of Services
Enclosure 10 -- Program Management
Enclosure 11 -- Management of Defense...
Enclosure 12 -- Systems Engineering
Recent Policy and Guidance
Download the Defense Acquisition...
Weapon Systems Acquisition Reform Act of...
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All