Godawari Solar Project
This page provides information on Godawari Solar Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Status Date: |
February 13, 2014
|
Project Overview |
Project Name: |
Godawari Solar Project |
Country: |
India |
Location: |
Nokh (Rajhastan) |
Owner(s): |
Godawari Green Energy Limited
(100%)
|
Technology: |
Parabolic trough |
Turbine Capacity: |
Net: 50.0 MW
Gross: 50.0 MW
|
Status: |
Operational |
Start Year: |
2013
|
Do you have more information, corrections, or comments?
Background
Technology: |
Parabolic trough |
Status: |
Operational |
Country: |
India |
City: |
Nokh |
Region: |
Rajhastan |
Lat/Long Location: |
27°36′
5.0″
North,
72°13′
26.0″
East |
Land Area: |
150 hectares |
Electricity Generation: |
118,000 MWh/yr
(Estimated)
|
Contact(s): |
Webmaster Solar |
Break Ground: |
June 26,
2011 |
Start Production: |
June 5,
2013 |
PPA/Tariff Rate: |
12.2 Rs per kWh |
PPA/Tariff Period: |
25 years
|
Project Type: |
Commercial |
Participants
Developer(s): |
Godawari Green Energy Limited |
Owner(s) (%): |
Godawari Green Energy Limited
(100%)
|
EPC Contractor: |
Lauren-Jyoti |
Generation Offtaker(s): |
NTPC Vidyut Vyapar Nigam Limited |
Plant Configuration
Solar Field
Solar-Field Aperture Area: |
392,400 m² |
# of Solar Collector Assemblies (SCAs): |
480 |
# of Loops: |
120 |
# of SCAs per Loop: |
4 |
SCA Aperture Area: |
817 m² |
SCA Length: |
144 m |
# of Modules per SCA: |
12 |
SCA Manufacturer (Model): |
EuroTrough
(ET 150)
|
Mirror Manufacturer (Model): |
Flabeg (RP3)
|
HCE Manufacturer (Model): |
Schott (PTR-70) |
HCE Type (Length): |
Evacuated (4 m)
|
Heat-Transfer Fluid Type: |
Dowtherm A |
HTF Company: |
Dow Chemical |
Solar-Field Inlet Temp: |
293°C |
Solar-Field Outlet Temp: |
390°C |
Power Block
Turbine Capacity (Gross): |
50.0 MW
|
Turbine Capacity (Net): |
50.0 MW |
Turbine Manufacturer: |
Siemens |
Turbine Description: |
SST-700 |
Cooling Method: |
Wet cooling |
Thermal Storage