7.1 Objective
7.2 Background
7.3 Introduction 7.3.1 Defining Producibility 7.3.2 Causes of Poor Producibility
7.4 Integration of Design Considerations 7.4.1 Producibility in Conceptual Design 7.4.2 Producibility in Detailed Design 7.4.3 Application to the Design Function 7.4.4 Producibility Impact 7.4.5 Producibility Tools
7.5 Producibility Goals and Objectives 7.5.1 Design Maturity Considerations 7.5.2 Things to Maximize/Things to Minimize
7.6 Producibility Engineering and Planning 7.6.1 Establish a Producibility Infrastructure 7.6.2 Determine Process Capability 7.6.3 Address Producibility During Conceptual Design 7.6.4 Address Producibility During Detailed Design 7.6.5 Measure Producibility
7.7 Contractor Producibility Efforts 7.7.1 Organizing for Producibility 7.7.2 Contracting for Producibility
7.8 Value Engineering (VE) 7.8.1 DOD Policy 7.8.2 Types of Value Engineering 7.8.3 Contracting for Value Engineering 7.8.4 Value Engineering Savings
7.9 Summary
7.10 Related Links and Resources
Top of page