Protecting Public Health and the Environment.

Boise-Mores Creek (Mores and Grimes Creek and Tributaries) Watershed Advisory Group (WAG)

Watershed advisory groups (WAGs) provide local public input and guidance to DEQ during the development of water quality improvement plans or "Total Maximum Daily Loads" (TMDLs) for water bodies that fail to meet water quality standards. TMDLs are designed to reduce the levels of pollutants, such as bacteria and sediment, in impaired water bodies.

The Boise-Mores Creek WAG was formed in 2006 and met through October 2007. The Boise-Mores Creek Watershed Subbasin Assessment and Total Maximum Daily Loads document was developed and initially submitted to EPA for review in June 2009. The document was revised in December 2009, resubmitted to EPA, and subsequently approved by EPA in February 2010.

Review Documents

Previous Meetings

Date
Materials
November 2, 2006
Agenda | Minutes | Presentation: Data Summary
December 14, 2006
Agenda | Minutes
January 18, 2007
Agenda | Minutes
February 15, 2007
Agenda | Minutes
March 15, 2007
Agenda | Minutes
May 17, 2007
Agenda
October 18, 2007
Agenda

Page Subscription

Staff Contacts

Watershed Coordinator
Kati Carberry
DEQ Boise Regional Office
1445 N. Orchard St.
Boise, ID 83706
(208) 373-0550
kati.carberry@deq.idaho.gov

Related Pages

Watershed Advisory Groups

Total Maximum Daily Loads (TMDLs): Water Quality Improvement Plans

Boise - Mores Creek Subbasin