Protecting Public Health and the Environment.

Pend Oreille River and Tributaries Watershed Advisory Group (WAG)

Watershed advisory groups (WAGs) are groups of interested citizens that provide local public input and guidance to DEQ during the development of water quality improvement plans or "Total Maximum Daily Loads" (TMDLs) for water bodies that fail to meet water quality standards. TMDLs are designed to reduce the levels of pollutants, such as bacteria and sediment, in impaired water bodies.

Content on this page is provided for informational purposes while the Pend Oreille River and Tributaries Watershed Advisory Group (WAG) and DEQ work to develop a water quality improvement plan or "Total Maximum Daily Loads" (TMDLs) for water bodies in the watershed found to be not fully supporting beneficial uses.

Note:All of these documents are considered draft and are subject to change. The goal of providing these documents at WAG meetings and on this web page is to ensure citizens have the opportunity to provide input as the documents are developed.

April 2011 Update: DEQ's technical analysis and regulatory review of the Idaho portion of Pend Oreille Temperature TMDL has been on hold since February 2008. Since then, the U.S. Army Corps of Engineers has modified its modeling process and provided DEQ a U.S. Geological Survey peer-reviewed report of its findings. Although the Corps' modeling outputs are not directly comparable to those selected by DEQ, they seem similar. Rather than continuing debate over modeling processes, DEQ will perform load duration analyses on both data sets as resources become available. DEQ intends to reconvene the WAG to review preliminary load duration analysis findings and obtain comment and will provide the findings to EPA for TMDL development.

Next Scheduled Meeting Date

To Be Determined

Background

Pend Oreille Tributaries

Pend Oreille River Temperature Model

Note: The following animations were created using Tecplot software. To view them:

  1. Download the zip file and install the utility "Framer" (Framer.exe)
  2. Open the animation file and choose Framer as the program to open it with.

Visit Tecplot for more information.

Pend Oreille River Total Dissolved Gas

Pend Oreille River Phosphorus

April 2011 Update: The pollutant total phosphorus was proposed to be added to the Pend Oreille River assessment units as a cause of impairment in the 2008 Integrated Report (IR). However, monitoring conducted in 2009 did not support the addition of total phosphorus as a cause of impairment in these assessment units. Therefore, the draft 2010 Integrated Report (IR) proposes to remove total phosphorus as a cause of impairment in the Pend Oreille River assessment units. DEQ is currently evaluating comments received on the draft 2010 IR and expects to submit the document to EPA for approval later this year.

Tri-State Water Quality Council Resources

Clark Fork-Pend Oreille Basin

Clark Fork River Watershed

Lake Pend Oreille Watershed

Pend Oreille River Watershed

Water Quality Monitoring

WAG Documents

Pend Oreille Tributary Working Group

Pend Oreille River Watershed Advisory Group

Responses to Comments to the Working Draft:

3/27/08
Army Corps of Engineers Response to WDOE Comments
3/27/08
Army Corps of Engineers Response to DEQ Comments
2/25/08
Washington Responses to Stakeholder Draft TMDL Comments
2/25/08
Idaho Responses to Stakeholder Draft TMDL Comments

Comments on the Working Draft:

2/6/09
Kalispel Tribe of Indians
4/15/08
Seattle City Comments
4/15/08
Seattle City Comments (Matrix)
3/28/08
Army Corps of Engineers Comments
12/13/07
Washington Department of Ecology Comments
12/13/07
Heller Ehrman Comments
11/21/07
Army Corps of Engineers Comments
10/19/07
Pend Oreille County Public Utility District Comments
10/17/07
Ponderay Newsprint Comments
9/13/07
City of Sandpoint Comments
9/12/07
Southside Water and Sewer Comments
6/20/07
Army Corps of Engineers Modeling Interpretation Comments
6/01/07
Army Corps of Engineers Modeling Results Comments

Other Documents:

2/25/08
An Approach to Using Load Duration Curves in the Development of TMDLs (EPA Website)

Previous Meeting Information

Pend Oreille River Phosphorus Working Group Meetings

Agendas
Meeting Information
December 10, 2008
Agenda
Sign-in Sheet
Pend Oreille River Phosphorus PowerPoint Presentation
Pend Oreille River Preliminary Nutrient Load Analysis PowerPoint Presentation

Pend Oreille Tributary Working Group Meetings

Date
Materials
October 16, 2007
Public comments received on the nutrient, temperature, and sediment TDMLs were shared and there was a request for a consensus to proceed with submission of the final TMDL for EPA approval.
September 18, 2007
Topics covered were the release of the draft nutrient, temperature, and sediment TMDLs released to the public and the meeting was opened up to answer questions by the public.
July 19, 2007
Agenda
Pack River Nutrient TMDL
Tributary Work Group Comments on Draft Sediment TMDL Allocations
June 14, 2007
Agenda
Sediment TMDL Allocations
May 23, 2007
Agenda
Idaho Temperature Water Quality Standards
Regional Shade Curve Development (Peter Leinenbach, EPA)
Draft Temperature TMDL Model Results
March 20, 2007
Agenda
Pack River Nutrient TMDL Target Selection
Sediment Model Revisions
February 13, 2007
Agenda
Draft Sediment Model Results
Draft Pend Oreille Tributary TMDL Development Schedule
October 26, 2006
Agenda
Pack River Stressor Identification Process
Sediment Model Overview
Tributary Overview and Beneficial Uses

Pend Oreille River TMDL WAG Meetings

Date
Materials
June 17, 2008
Minutes
May 12, 2008
Minutes
April 28, 2008
Agenda | Minutes
February 25, 2008
Agenda | Minutes
Washington Presentation Outline | Washington Response to Stakeholder Comments Presentation
Idaho Compliance Areas Presentation
Load Duration Curves Presentation
Idaho Total Dissolved Gas TMDL Presentation
October 25, 2007
Agenda | Minutes
Pend Oreille River Temperature TMDL Allocation
Seattle District Army Corps of Engineers Comments
Ponderay Newsprint Co. Comments
Washington's TMDL Process, Where do we go from here?
Washington's Development of Tributary, Mainstem, and NPDES Allocations
September 28, 2007
Agenda | Minutes
August 16, 2007
Agenda | Minutes
June 25, 2007
Agenda | Minutes
Pend Oreille River Compliance with Idaho Standards - Lake Pend Oreille to WA/ID Border
Overview of Washington and Kalispel Tribe Temperature Standards
May 10, 2007
Agenda | Minutes
Pend Oreille River Compliance with Washington and Kalispel Tribe Standards - Box Canyon Reach
Pend Oreille River TMDL Schedule
Summary of Idaho Modeling Results
Preliminary Box Canyon Segment Modeling Results
Preliminary Boundary Segment Modeling Results
March 20, 2007
Agenda| Minutes
Overview of Temperature and TDG
Draft Pend Oreille River Temperature Model Results (Lake Pend Oreille to Albeni Falls Dam
Discussion of Model Error
Pend Oreille River Temperature TMDL Strategy and Call for Data
January 25, 2007
Agenda | Minutes
Corps of Engineers Pend Oreille Research Summary
Pend Oreille River - Idaho and Box Canyon Reaches Hydrodynamic Model
Temperature Modeling of the Pend Oreille River, Model Calibration, Boundary Dam Reach
Overview of Next Steps
Boundary Reservoir, Surface Layer Longitudinal Temperature Variation
October 26, 2006
Agenda | Minutes
Idaho Beneficial Uses
Operating Procedures Overview
Temperature Modeling 101
May 25, 2006
Agenda | Minutes
October 20, 2005
Agenda | Minutes

Page Subscription

Staff Contacts

TMDL Technical Lead
Robert Steed
DEQ Coeur d'Alene Regional Office
2110 Ironwood Parkway
Coeur d'Alene, ID 83814
(208) 769-1422
robert.steed@deq.idaho.gov

Watershed Coordinator
Kristin Larson
DEQ Coeur d'Alene Regional Office
2110 Ironwood Parkway
Coeur d'Alene, ID 83614
(208) 666-4606
kristin.larson@deq.idaho.gov

Related Pages

Total Maximum Daily Loads (TMDLs): Water Quality Improvement Plans

Watershed Advisory Groups

Pend Oreille Lake Subbasin