SUBJECT: GOES WEEKLY OPERATIONS PLAN: 16-22 JAN 2017 1. EAST SPACECRAFT (GOES-13) A. CONTINUOUS IMAGE OPERATIONS AT 15 & 45 MINS PAST EACH HOUR AND CONTINUOUS SOUNDER OPERATIONS AT 20 & 46 MINS PAST EACH HOUR WITH THE FOLLOWING EXCEPTION: 1) HOUSEKEEPING PERIODS AT 0034Z & 1534Z. B. SEM: ON; CALIBRATION EACH WEDNESDAY AT 1704Z. C. EAST WEFAX/LRIT AND EMWIN BROADCASTS: CONTINUOUS. D. EAST DCS: DCPR & DCPI. E. MANEUVER: NONE. F. OTHER: NONE. 2. WEST SPACECRAFT (GOES-15) A. CONTINUOUS IMAGE OPERATIONS AT 00 & 30 MINS PAST EACH HOUR AND CONTINUOUS SOUNDER OPERATIONS AT 01 & 24 MINS PAST EACH HOUR WITH THE FOLLOWING EXCEPTIONS: 1) HOUSEKEEPING PERIODS AT 0045Z & 2045Z. B. SEM: ON; CALIBRATION EACH THURSDAY AT 2000Z. C. WEST WEFAX/LRIT AND EMWIN BROADCASTS: CONTINUOUS. D. WEST DCS: DCPR & DCPI. E. MANEUVER: NONE. F. OTHER: NONE. 3. STANDBY SPACECRAFT STATIONED AT 105 (GOES-14) A. HOUSEKEEPING SCHEDULE: 1) HOUSEKEEPING PERIODS AT 0134Z & 2015Z. B. SEM: ON; CALIBRATION EACH TUESDAY AT 1800Z. C. MANEUVER: NONE. D. OTHER: NONE. 4. DECOMMISSIONED SPACECRAFT (GOES-11) 5. DECOMMISSIONED SPACECRAFT (GOES-12)