South Fork Boise River Watershed Advisory Group (WAG)
Watershed advisory groups (WAGs) provide local public input and guidance to DEQ during the development of water quality improvement plans or "Total Maximum Daily Loads" (TMDLs) for water bodies that fail to meet water quality standards. TMDLs are designed to reduce the levels of pollutants, such as bacteria and sediment, in impaired water bodies.
The South Fork Boise River WAG was formed in 2007 and met through October 2009. The South Fork Boise River Subbasin Assessment, Total Maximum Daily Load, and Five-Year Review document was developed, submitted to EPA for review in January 2009, and subsequently approved by EPA in March 2009.
Next Scheduled Meeting Date
To Be Determined
Review Documents
- Smith Creek Assessment and Total Maximum Daily Loads Conceptual Approach Report
- 2010 Integrated Report: South Fork Boise River Subbasin Category 5 303(d) List
- Draft South Fork Boise River Subbasin Assessment, Total Maximum Daily Load, and Five-Year Review
- Summary of Assessment Outcomes
- Draft Section 5 TMDLs
- List of Pending TMDLs
- Map of the South Fork Boise River Subbasin
- Map of 303(d) Listed Assessment Units
Previous Meetings
- Date
- Materials
- November 19, 2007
- Agenda | Meeting Notes
- January 24, 2008
- Agenda | Meeting Notes
- March 25, 2008
- Agenda | Meeting Notes
- October 2, 2008
- Agenda | Meeting Notes
- May 7, 2009
- Agenda | Meeting Notes
- October 13, 2009
- Agenda | Meeting Notes
- October 25, 2011
- Agenda | Meeting Notes