County/ Project
|
Activity
|
Permit
|
Plate
|
Matrix
|
Other Locations
|
Kings Bay, Camden County, GA
|
1-year extension, maintenance dredging to 31 Aug 13
|
3 July 2012
|
|
|
|
Time Extension, Inner Channel to 31 Aug 2014 |
31 Jan 2013 |
|
|
|
Department of the Army Permit, Maintenance Dredging |
9 Jul 2014 |
|
|
|
Department of the Army Permit, Maintenance Dredging |
10 Nov 2016 |
|
|
District Wide
|
Interagency Coordination Agreement
|
Florida DEP and Corps (Jacksonville and Mobile Districts)
|
28 Feb 2006
|
|
|
All Dredging Projects |
Vessel General Permit for Discharges Incidental to the Normal Operation of Vessels (VGP) |
19 Dec 2013 |
|
|
Multiple Counties
|
Kissimmee River Restoration
|
Contract 12
|
7 Nov 2011
8 Apr 2015
|
|
1 Oct 2012
|
|
Reach 2 Backfill, Contract 10 |
8 Dec 2015 |
|
|
|
C-37 Embankment Armoring, Contract 2B2 |
15 July 2016 |
|
|
|
Contract 10B, Backfill MacArthur Ditch
|
6 Jun 2013
|
|
|
|
S-69 U-Shaped Weir, Contract 12A |
8 Mar 2011 |
|
|
Herbert Hoover Dike
|
Replace Culverts 1, 1A, and 3
|
19 July, 2011
23 May 2013
|
|
4 Oct 2011
|
|
Replace Culverts 4a, 11, 16
|
27 Jun 2011
23 May 2016
|
|
11 Oct 2011
|
|
Replace Culverts 8 and 13
|
26 Jul 2013
|
|
31 May 2013
|
|
Replace Culverts 2, 12A, and HP-2 |
2 May 2014 |
|
21 Apr 2014 |
|
Replace Culvert 10A with water control struct S-271 |
29 Apr 2015 |
|
1 May 2015 |
Gulf Intracoastal Waterway
|
Longboat Pass to Sunshine Skyway
|
14 Nov 2011
|
|
Jan 2013
|
Upper St. Johns (Noticed General Permit, Brevard and Indian River Counties)
St. John’s Marsh Conservation Area, St. John’s Water Management Area, Three Forks Marsh Conservation Area, C-1 canal and retention areas, Fellsmere Water Management Area, and Blue Cypress marsh Conservation Area
|
Three Forks, 3 Cultural Resource Protection Features, Ring Levees, Brevard County, Florida
|
11 Dec 2012
|
|
not applicable
|
Stormwater Treatement Areas (STAs) 1 through 6 |
Everglades Forever Act Permit |
10 Sep 2012 |
|
|
Puerto Rico
|
San Juan Harbor Navigaton Project |
Mitigation, WQC |
14 Jan 2015 |
|
|
Rio Puerto Nuevo Flood Risk Management Project |
Water Quality Certification
English Translation |
11 Jun 1993
11 Jun 1993 |
|
|
US Virgin Islands
|
|
|
|
|
|
Brevard
|
|
Permit
|
Plate
|
EC matrix
|
US Navy, Canaveral Harbor Dredging
|
Dept of Army Permit Mod, Disposal in ODMDS
|
19 April 2012
|
|
30 Jan 2013
|
|
Dept of Army Permit
|
14 Oct 2011
|
|
|
Canaveral Harbor O&M |
Joint Coastal Permit |
15 Jan 2010 |
|
|
|
Variance, Turbidity and Mixing Zone |
15 Jan 2010 |
|
|
|
Modification 005, Add Barge Canal, Zones 4, 13, 14 |
17 Jun 2010 |
11 Feb 2009 |
|
Canaveral Harbor Sand Bypass |
Joint Coastal Permit
Physical Monitoring Plan
Sediment QAQC Plan |
12 Jun 2015
07 Nov 2014
Nov 2014 |
01 Jun 2104 |
|
Upper St. Johns (Noticed General Permit, Brevard and Indian River Counties)
St. John’s Marsh Conservation Area, St. John’s Water Management Area, Three Forks Marsh Conservation Area, C-1 canal and retention areas, Fellsmere Water Management Area, and Blue Cypress marsh Conservation Area
|
Three Forks, 3 Cultural Resource Protection Features, Ring Levees, Brevard County, Florida
|
11 Dec 2012
|
|
not applicable
|
Brevard County Shore Protection Project
|
North Reach Permits and Mods
|
22 Nov 1999
1 Dec 2000
20 Dec 2004
14 Apr 2005
10 May 2005
17 Jul 2013
|
|
24 Jun 2013 |
|
North Reach Sediment QA QC Plan
|
18 Apr 2013
|
|
|
|
South Reach Permits and Mods
|
8 Oct 2001
11 Apr 2002
23 Apr 2002
25 Oct 2002
20 Dec 2004
5 Feb 2010
13 Dec 2010
|
|
24 Jun 2013 |
|
South Reach Sediment QA QC Plan
|
22 Apr 2013
|
|
|
|
BOEM Negotiated Agreement (MOA) 0CS-A0493 |
12 Jul 2013 |
|
|
Broward
|
|
Permit
|
Plate
|
EC matrix
|
Port Everglades Maintenance Dredging
|
Southport Access Channel Permit Mod
|
10 Feb 2012
|
|
|
|
Minor Permit Mod, Pipeline, staging area, extend beach placement
|
27 June 2012
|
15 June 2012
|
|
|
Port Maintenance Dredging Exemption
|
26 July 2012
|
|
|
|
Joint Coastal Permit
|
22 April 2005
|
|
|
|
Permit mod, allow dredging in Important Manatee Area (IMA)
|
29 Oct 2012
|
|
|
|
Statutory Time Extension, JCP |
11 Jul 2014 |
|
|
Broward County Shore Protection |
Segment 2, truck haul |
|
|
15 Aug 2013 |
Charlotte
|
|
Permit
|
Plate
|
EC matrix
|
|
|
|
|
|
Collier
|
|
Permit
|
Plate
|
EC matrix
|
Picayune Strand Restoration Project
|
Miller Canal Pump Station and Road Removal, Draft CERPRA Permit
|
2 May 2013
|
|
5 Apr 2013
|
Gulf Intracoastal Waterway, Naples to Gordon Pass |
Maintenance Dredging, Joint Coastal Permit |
17 Oct 2013 |
May 2012 |
May 2016 |
Dade
|
|
Permit
|
Plate
|
EC matrix
|
CERP, Decomp, Water Conservation Area 3
|
Decompartmentalzation and Sheetflow Enhancement Physical Model field test, Permit Minor Mod
|
23 May 2012
|
|
26 Sep 2012
|
Modified Water Deliveries to Everglades National Park |
8.5 Square Mile Area, CERPRA Permit Modification |
15 Jul 2013 |
|
|
Miami Harbor Construction and Maintenance Dredging
|
Phase 3, Environmental Resource Permit
|
22 May 2012
|
July 2011
|
7 Feb 2014 |
|
Permit Modification, extension of time and revise seagrass sedimentation monitoring |
2 Jun 2014 |
|
|
Miami Harbor Deepening
|
Department of the Army Permit, Section 10
|
25 Jul 2012
|
|
|
S-332B, S-332C, S-332D
|
Ninth Amended Emergency Final Order, Request to Terminate Groundwater Monitoring
|
2 Oct 2012
|
|
|
Intracoastal Waterway (IWW), Bakers Haulover Inlet, Maintenance Dredging |
Joint Coastal Permit, Mod 003, Remove "once only"
Sediment QA/QC Plan
|
29 Mar 2010
29 Mar 2010
|
Dec 2004 |
15 Aug 2013 |
|
Joint Coastal Permit, Mod, Remove "new" geotechnical data requirement
|
27 Jun 2013
|
|
|
|
Statutory Time Extension to 21 Oct 2014 |
1 Aug 2014 |
|
|
Dade County Beach Erosion Control and Hurricane Protection |
Contract G, Bal Harbour Segment, Permit 002
- Sediment QCQA
- Biological Monitoring Plan
- Dade County and DEP Agreement |
11 Jul 2013
May 2012
July 2013
10 Jul 2013 |
Jul 2012 |
29 Jul 2013 |
|
Dade County Truck Haul |
Jan 6 2011
Nov 4 2014
Mar 25 2015
Apr 5 2016
Physical Mon
QAQC
|
Jan 6 2011
Feb 9 2015
Apr 5 2016
|
Jul 6 2016 |
Dixie
|
|
Permit
|
Plate
|
EC matrix
|
Suwanee River O&M, Maintenance Dredging |
Environmental Resource Permit |
30 Aug 2007 |
|
|
|
Time Extension to 30 Aug 2016 |
29 Jul 2014 |
|
|
Duval
|
|
Permit
|
Plate
|
EC matrix
|
Jacksonville Harbor O&M, Navy Fuel Pier
|
Navy Fuel Pier Maintenance Dredging
|
|
|
27 July 2012
|
Jacksonville Harbor O&M
|
Maintenance dredging and berth deepening, permit minor mod, Navy Fuel Pier Cell F
|
22 June 2012
|
|
|
|
Maintenance dredging and berth deepening, Minor Mod
|
3 July 2012
|
|
|
|
Time Extension |
14 May 2014 |
|
|
|
Jacksonville Harbor Maintenance Dredging, Joint Coastal Permit
|
23 May 2012
|
|
9 May 2013 |
|
Modification No 0303186-004-JN |
Apr 15 2016 |
|
|
Jacksonville Harbor, Bartram Island Dredged Material Management Area |
Cell A Dike Raising |
13 Jan 2012 |
|
|
|
Wave Attenuation Structure and Mitigation, Permit Mod |
13 Feb 2014 |
|
|
US Marine Corps, Blount Island
|
Exemption Verification
Exemption Notice to DEP
Exemption Verification
|
14 Jun 2010
17 Apr 2014
18 Apr 2014
|
|
20 Feb 2013 |
|
DA Permit to USMC |
14 May 2014 |
|
|
|
Gate Maritime Properties, DA Permit
|
8 Jan 2004
|
|
|
Mile Point
|
Dredging and Training Wall Reconfiguration Environmental Resources Permit
|
4 Feb 2013
|
|
26 Feb 2015 (phase I)
26 Feb 2015 (phase II) |
Mayport Naval Station
|
Maintenance Dredging, Exemption, DEP
|
6 May 2013
29 Apr 2014
27 Dec 2016
|
|
|
|
Dept Army Permit Maintenance Dredging turning basin, basin, destroyer slip, Entrance Channel, Bar Cut-3 and boat basin using ODMDS |
17 Jul 2014
01 Sep 2016 |
|
|
Duval County Shore Protection Project |
Joint Coastal Permit |
18 Sep 2015 |
May 2015 |
|
|
Sediment QA/QC Plan |
20 Jul 2015 |
|
|
|
Physical Monitoring Plan |
Mar 2015 |
|
|
|
Environmental Compliance Matrix |
|
|
Apr 28 2016 |
Flagler
|
|
Permit
|
Plate
|
EC matrix
|
|
|
|
|
|
Glades
|
|
Permit
|
Plate
|
EC matrix
|
Herbert Hoover Dike Rehabilitation and Repair
|
Culverts 5A and 5 Replacement, ERP
|
14 Jun 2013
|
|
7 May 2013
|
|
Replace Culverts, ERP |
2 May 2014 |
|
21 Apr 2014 |
|
Replace Culverts HP2 and HP3, Seminole Tribe Permit |
12 Feb 2015 |
|
|
Hendry
|
|
Permit
|
Plate
|
EC matrix
|
Herbert Hoover Dike Rehabilitation and Repair |
Replace Culverts, ERP |
2 May 2014 |
|
21 Apr 2014 |
Hernando
|
|
Permit
|
Plate
|
EC matrix
|
|
|
|
|
|
Highlands
|
|
Permit
|
Plate
|
EC matrix
|
Kissimmee River Restoration
|
Contract 12
|
7 Nov 2011
|
|
1 Oct 2012
|
|
Contract 10B, Backfill MacArthur Ditch
|
6 Jun 2013
|
|
|
Hillsborough
|
|
Permit
|
Plate
|
EC matrix
|
Tampa Harbor
|
Comprehensive Maintenance Dredging
|
7 April 2006
|
March 2006
|
|
|
QA/QC Plan |
Dec 2004 |
|
|
|
Major Permit Modification 011 |
12 Sep 2006 |
|
|
|
Maintenance Dredging, Upper Channel
|
|
|
Sep 2012
|
|
Permit Mod 016, greater than 10% fines on Egmont |
15 May 2014 |
|
Jun 2014 |
|
Permit Mod 019, Extension of Time |
1 Sep 2015 |
|
Aug 2015 |
|
Dike Raising and 3D |
exempt |
|
Jun 2013 |
|
Cut-A, Cut-C, & Cut-D O&M |
|
|
Jun 2016 |
Gulf Intracoastal Waterway
|
Longboat Pass to Sunshine Skyway
|
14 Nov 2011
|
|
not applicable
|
Tampa Harbor GRR
|
Widen Cuts A and B, Environmental Resource Permit
|
12 Mar 2013
|
|
|
Tarpon Springs, CAP 103 Shore Protection |
|
|
|
14 Sep 2012 |
Indian River
|
|
Permit
|
Plate
|
EC matrix
|
IWW |
Indian River Reach 1 Exemption |
23 Jan 2014 |
|
Sep 2014 |
|
IR-2 Dredged Material Management Area, Environmental Resource Permit |
21 Jul 2010 |
|
|
Lee
|
|
Permit
|
Plate
|
EC matrix
|
Matanzas Pass, Maintenance Dredging
|
Maintenance Dredging
|
9 March 2009
|
|
|
|
Joint Coastal Permit Mod, add cuts 2A and 3
|
17 Dec 2012
|
|
|
Lee County Shore Protection, Captiva and Sanibel Islands
|
Joint Coastal Permit
|
9 Nov 2004
|
|
26 Sep 2007
|
|
Permit Mod, Expand Borrow Site, Eliminate Pipeline Corridors, Year Round Dredging
|
18 May 2012
|
17 Feb 2012
|
|
|
Permit Mod, Corrected Permit Drawing
|
1 Jul 2005
|
8 Jun 2005
|
|
|
Permit Mod, Remove Sea Turtle Window
|
24 Mar 2005
|
|
|
Lee County Shore Protection, Gasparilla
|
Joint Coastal Permit
|
15 Mar 2002
|
|
|
|
Permit Mod002, Increase Borrow Depth and Volume |
19 Jun 2003 |
|
|
|
Permit Mod003, Correct Project Description |
11 Aug 2003 |
|
|
|
Permit Modification, Dune Feature, Derelict Structures, reef mitigation site, contengency plan
|
6 Jun 2006
|
|
|
|
Permit Modification, Time extension to 15 Mar 2014
|
19 Dec 2012
|
|
|
|
Permit Minor Mod, add single nourishment event
|
12 Jul 2013
|
|
|
|
Permit Modification, Legislative Time Extension |
16 Aug 2013 |
|
Sep 2013 |
Manatee
|
|
Permit
|
Plate
|
EC matrix
|
Cedar Hammock, Wares Creek, Flood Control
|
Permit
Time Extension
|
14 May 2009
10 Sep 2013
|
|
Jul 2012
|
Gulf Intracoastal Waterway
|
Longboat Pass to Sunshine Skyway
|
14 Nov 2011
|
|
not applicable
|
Manatee County Shore Protection Project |
Joint Coastal Permit, Anna Maria, R12-R36 |
28 Aug 2013 |
|
Sep 2013 |
Manatee Harbor Maintenance Dredging |
Exemption |
12 Aug 2013 |
|
Apr 2014 |
Martin
|
|
Permit
|
Plate
|
EC matrix
|
Martin County Shore Protection Project
|
Joint Coastal Permit
|
11 Aug 2011
|
|
8 Feb 2013
|
|
Permit Minor Modification, Extend Construction Window for 2013
|
30 Apr 2013
|
|
|
St. Lucie Inlet
|
Dredging and Sand Bypassing, Permit Modification, Turbidity Monitoring and Mixing Zone
|
18 Nov 2011
|
|
12 Jun 2013
|
|
Five Year Extension, Sand Bypassing
|
3 Nov 2006
|
|
|
|
Sand Bypassing
|
20 Feb 1997
|
|
|
Herbert Hoover Dike
|
Replace Culverts 4a, 11, 16
|
27 Jun 2011
|
|
11 Oct 2011
|
Indian River Lagoon South, C-44, Reservoir and Stormwater Treatment Area
|
CERPRA Permit, Mod 003, Contract 2
|
9 Aug 2014
|
|
21 Oct 2014
|
FIND O-7 Dredged Material Management Area |
FIND O-7 Dredged Material Management Area |
Jun 16 2010
Apr 6 2016 |
|
May 2016 |
Monroe
|
|
Permit
|
Plate
|
EC matrix
|
|
|
|
|
|
Nassau
|
|
Permit
|
Plate
|
EC matrix
|
AIWW, Vicinity of Sawpit Creek
|
Maintenance Dredging
|
3 July 2012
|
28 Oct 2012
|
11 Sep 2013
|
|
Sediment QA/QC Plan
|
Nov 2010
|
|
|
|
Maintenence Dredging Exemption, Cut 27, DU-2
|
4 Dec 2012
|
|
|
|
Permit Mod, Not Require Sub-Contractor for Turbidity Monitoring
|
12 Dec 2012
|
|
|
Kings Bay Entrance Channel, Maintenance Dredging
|
Permit Modification, Extension of Time (superseded)
|
14 Feb 2013
|
|
06 Jan 2017 |
|
Extension of Time, Mixing Zone Variance (superseded)
|
8 Apr 2013
|
|
|
|
Joint Coastal Permit Modification 016 |
11 Sep 2014 |
|
|
|
Sediment QA/QC Plan |
Jan 2013 |
|
|
|
Department of Army Permit Extension to 30 Apr 2014 |
12 Jun 2013 |
|
|
|
Department of the Army Permit, Maintenance Dredging |
18 Jun 2014 |
|
|
Nassau County, FL Shore Protection Project |
Joint Coastal Permit
Variance
Sediment QA/QC Plan
|
28 May 2015
29 May 2015
May 2015 |
2 Oct 2014 |
|
Okeechobee
|
|
Permit
|
Plate
|
EC matrix
|
Herbert Hoover Dike
|
Culverts 7 and 9 and Taylor Creek Culvert Abandonment
|
27 July 2012
|
|
21 May 2012
|
|
Replace Culverts |
2 May 2014 |
|
21 Apr 2014 |
Kissimmee River Restoration
|
Contract 18A, Construct Spillway Structure S-65EX1
|
24 May 2012
|
|
Jan 2013
|
|
Contract 10B, Backfill MacArthur Ditch
|
6 Jun 2013
|
|
|
Nubbin Slough, Stormwater Treatment Area Phosphorous Removal Critical Project |
Permit Renewal, Modification 015 |
18 Jul 2014 |
|
|
Osceola
|
|
Permit
|
Plate
|
ECM
|
|
|
|
|
|
Palm Beach
|
|
Permit
|
Plate
|
EC matrix
|
Palm Beach Harbor Maintenance Dredging
|
Permit Modification for additional 2 feet, entrance channel
|
31 Jan 2012
|
|
09 Feb 2016
|
|
Statutory Time Extension, JCP |
3 Jul 2014 |
|
|
|
JCP Mod, reduce number of rock removal inspections and authorize remediation |
14 Aug 2014 |
|
|
Herbert Hoover Dike
|
Replace Culverts 4a, 11, 16
|
27 Jun 2011
|
|
11 Oct 2011
|
|
Replace Culverts 10 and 12
|
16 May 2013
|
|
11 Apr 2013
|
|
Seepage Management Test Facility, Exemption |
18 Apr 2013
|
|
22 Mar 2013
|
|
Replace Culverts 12A |
2 May 2014 |
|
21 Apr 2014 |
STAs 1E, 1W, 2, 3/4, 5/6 Everglades Forever Act Permit
|
STA 1E culvert repairs
|
10 Sep 2012
|
|
4 Sep 2012
|
|
Trash Rake and Rack Replacement at S-362
|
10 Sep 2012
|
|
22 June 2010
|
|
Trash Rake and Rack Replacement at S-319 |
10 Sep 2012 |
|
3 Oct 2013 |
Site 1 Impoundment
|
CERPRA Permit
|
25 Mar 2010
|
|
|
|
Permit, Minor Mod
|
19 Oct 2011
|
|
|
|
Permit, Time Extension, Mixing Zone
|
22 Mar 2012
|
|
16 Nov 2012
|
Palm Beach County Shore Protection Project |
Delray Beach Segment, Joint Coastal Permit |
27 Jan 2012 |
|
|
|
Delray Beach Segment, Permit Mod 003, Corrects turtle monitoring requirements |
11 Jun 2012 |
|
|
|
Delray Beach Segment, Permit Mod 005, Stockpile sand, truck to R176-R177 |
4 Mar 2013 |
|
|
|
Delray Beach Segment, Permit Mod 007, extend placement to R175-R179 |
2 Aug 2013 |
|
|
|
Delray Beach Segment, Permit Mods 008/009, turbidity monitoring and mixing zone |
22 Aug 2013 |
|
Sep 2013 |
Palm Beach County Shore Protection Project
|
Ocean Ridge Segment, Joint Coastal Permit
|
24 Jun 2013
|
|
Sep 2013 |
Palm Beach County Shore Protection Project |
Jupiter Carlin Segment
-Joint Coastal Permit
-Physical Monitoring Plan
-Sediment QA/QC Plan
-Sea Turtle and Sawfish Conditions
|
10 Sep 2013
20 Feb 2013
Jun 2013
23 Mar 2006 |
Jun 2013 |
Sep 2013 |
Palm Beach County Shore Protection Project |
North Boca Raton Segment
-Joint Coastal Permit
-Sediment QAQC Plan
-Physical Monitoring Plan
-Hardbottom Monitoring Plan |
12 Sep 2013
5 Apr 2013
Jun 2013
6 Sep 2013
|
17 Jul 2013 |
Sep 2013 |
Intracoastal Waterway (IWW), Jupiter Inlet, Maintenance Dredging |
Joint Coastal Permit, Mod003, Transfer to Florida Inland Navigation District
Sediment QA/QC Plan
Mod005, Revise Notice to Proceed Requirements
|
27 Mar 2008
7 Sep 2007
26 Jul 2013
|
Apr 2007 |
30 Aug 2013 |
Pinellas
|
|
Permit
|
Plate
|
EC matrix
|
Tampa Harbor (see also Hillsborough County)
|
Comprehensive Maintenance Dredging
|
7 April 2006
|
March 2006
|
|
Tarpon Springs, CAP 103
|
Whitcomb and Kreamer Bayous, Exemption
|
7 June 2012
|
|
|
Pinellas County Shore Protection
|
Sand Key, Joint Coastal Permit
|
6 July 2011
|
18 Feb 2011
|
|
|
Sand Key, Joint Coastal Permit Mod
|
26 Oct 2012
|
3 Oct 2012
|
|
Pinellas County Shore Protection |
Treasure Island and Long Key, Major Mod 008 |
29 Mar 2010 |
|
|
|
Treasure Island and Long Key, Mod 010, Egmont Shoal Borrow Area Mod |
20 Dec 2013 |
|
|
|
Treasure Island and Long Key, Mod 011, Pass-a-Grille Extension |
16 Aug 2013 |
|
Sep 2013 |
|
Treasure Island and Long Key, Mod 013, time extension |
25 Sep 2013 |
|
|
|
Treasure Island and Long Key, Mod 015, allow 2.50 NTU above background and no night sampling |
21 Aug 2014 |
|
|
Gulf Intracoastal Waterway
|
Longboat Pass to Sunshine Skyway
|
14 Nov 2011
|
|
not applicable
|
Stevenson Creek Restoration
|
Environmental Resource Permit Extension
|
27 Sep 2012
|
|
|
Sarasota
|
|
Permit
|
Plate
|
EC matrix
|
Sarasota County Beach Erosion Control |
Venice Beach, Joint Coastal Permit |
13 Jun 2014 |
|
Aug 2014 |
St. Johns
|
|
Permit
|
Plate
|
EC matrix
|
St. Augustine Inlet Maintenance Dredging |
Joint Coastal Permit |
8 Dec 2010 |
24 May 2010 |
19 Nov 2012 |
|
Permit Modification, Extend Beach Placement |
3 July 2013 |
May 2013 |
|
|
Sediment Quality Control/Quality Assurance Plan |
20 Oct 2010 |
|
|
|
Permit Modification 004, Corrects numbering and updates wildlife protection conditions |
24 Jan 2014 |
|
|
|
Permit Modification 005, Dredging of the shoals St. Augustine Inlet Entrance Channel |
19 Jun 2014 |
Jun 2014 |
|
|
Permit Modification 006, Vilano Beach Nearshore Placement Area |
21 Apr 2015 |
Feb 2015 |
|
|
|
Apr 28 2016 |
Apr 28 2016 |
Jun 2016 |
Matanzas Inlet O&M |
|
Oct 20 2010 |
Oct 20 2010 |
Jun 2016 |
St. Lucie
|
|
Permit
|
Plate
|
EC matrix
|
Ft. Pierce Beach
|
Joint Coastal Permit
|
23 Feb 2007
|
Nov 2006
|
|
|
Sand QC QA Plan
|
29 Dec 2006
|
|
|
|
Joint Coastal Permit Modification 004, Mixing Zone Turbidity Monitoring 150 meters down current
|
19 Nov 2008
|
|
|
|
Joint Coastal Permit Modification 005, No Night Turbidity Monitoring
|
4 Feb 2009
|
|
|
|
Joint Coastal Permit Modification 008, Turtle and Shore Bird Monitoring, extend construction window
|
1 Mar 2012
|
|
|
|
Joint Coastal Permit Modification 009, Extend Borrow Area for FCCE/CG
|
2 Apr 2013
|
2 Apr 2013
|
|
|
Joint Coastal Permit Modification 011, Make Corps Co-Permittee |
9 Sep 2013 |
|
23 Sep 2013 |
Fort Pierce Harbor Navigation Project |
Permit Exemption |
10 Apr 2014 |
|
22 Apr 2014 |
|
Suitability for Ocean Disposal from EPA |
24 Mar 2014 |
|
|
|
Sea Grass Map |
|
2011 |
|
Ten Mile Creek Water Preserve Area Critical Habitat |
Minor Modification, Permit Renewal |
10 Jul 2013 |
|
|
Volusia
|
|
Permit
|
Plate
|
EC matrix
|
Ponce de Leon Inlet Maintenance Dredging
|
Joint Coastal Permit
|
3 Aug 2012
|
|
|
|
Permit Minor Mod, Move Nearshore Disposal Site, Remove one-time-only
|
23 Jan 2013
|
|
23 Sep 2013 (Corps Dredge) |
IWW Volusia County Maintenance Dredging |
Joint Coastal Permit V22 to V40 |
18 Jan 2005 |
|
Mar 2001 |
|
Statutory Time Extension to 18 Jan 2017 |
29 Jul 2014 |
|
|
Kissimmee River Restoration
|
Contract 12
|
7 Nov 2011
|
|
1 Oct 2012
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|