Jacksonville District Header Image

JACKSONVILLE DISTRICT

Home
Home > Missions > Environmental > Ecosystem Restoration  > Integrated Delivery Schedule

Integrated Delivery Schedule

everglades photosThe updated Integrated Delivery Schedule provides the sequencing of federally cost-shared Everglades restoration projects.  It will provide the sequencing strategy for planning, designing, and constructing federal projects cost-shared with local sponsors as part of the Central and Southern Florida Projects (C&SF), based on ecosystem needs, benefits, costs and available funding.

A series of public workshops were sponsored by the South Florida Ecosystem Restoration Task Force Working Group to facilitate public participation in the IDS update. The Task Force provided feedback from these workshops to the U.S. Army Corps of Engineers and the South Florida Water Management District during the IDS update.

Additional information on the Task Force’s Working Group-sponsored public workshop is available at: http://www.evergladesrestoration.gov/content/ids.html

 

 

Status

A formal re-evaluation of the Integrated Delivery Schedule (IDS) was completed in 2015.

2016 Integrated Delivery Schedule

Previous Meetings

Project Documents