Notice No.
|
Date Issued
|
Description
|
14-59 (Rev 1) |
January 8, 2015 |
Two-day Allegheny River closure, RM 12.8 in Oakmont, Pa. |
14-59 |
December 19, 2014 |
Two-day Allegheny River closure, RM 12.8 in Oakmont, Pa. |
14-49 (Rev 3) |
November 12, 2014 |
Morgantown Lock and Dam, Monongahela River, Mile 102.0 Closure of the Single 84-ft x 600-ft Lock Chamber |
14-58 |
December 12, 2014 |
Exploratory Drilling Ohio River, Near the Left Descending Bank, Mile 115.9 |
14-57 |
November 6, 2014 |
Annual Dredging Operation Monongahela River |
14-56 |
October 27, 2014 |
Birmingham Highway Bridge Rehabilitation over the Monongahela River, RM 2.3 |
14-55 |
October 22, 2014 |
Hannibal Locks and Dams, Ohio River, Mile 126.4, Closure of the 100-ft x 1,200-ft Primary Lock Chamber |
14-54 |
October 20, 2014 |
Removal of Small Boat Warning Signs and Buoys, Allegheny, Monongahela, and Ohio Rivers |
14-53 |
September 30, 2014 |
Removal of Flashboards, Lock and Dam 9, Allegheny River, Mile 62.2 |
14-52 (Rev 1) |
October 3, 2014 |
Allegheny L/D 7, Mile Marker 45.7, Allegheny River, Unavailable for Service Due to Hydraulic Line Failure |
14-52 |
September 30, 2014 |
Allegheny L/D 7, Mile Marker 45.7, Allegheny River, Unavailable for Service Due to Hydraulic Line Failure |
14-51 |
September 18, 2014 |
Temporary Buoys, Monongahela River Mile 2.6-2.75 |
14-50 |
September 17, 2014 |
Montgomery L/D, Ohio River, Mile 31.7, Closure of the 56-ft x 360-ft River Lock Chamber |
14-49 (Rev 2) |
October 29, 2014 |
UPDATE: Morgantown Lock and Dam, Monongahela River, Mile 102.0, Closure of the Single 84-ft x 600-ft Lock Chamber |
14-49 (Rev 1) |
September 24, 2014 |
Morgantown Lock and Dam, Monongahela River, Mile 102.0, Closure of the Single 84-ft x 600-ft Lock Chamber |
14-49 |
September 17, 2014 |
Morgantown Lock and Dam, Monongahela River, Mile 102.0, Closure of the Single 84-ft x 600-ft Lock Chamber |
14-48 |
September 3, 2014 |
Intake Inspection and Repairs, Monongahela River, Right Bank , Mile 77.6
|
14-47 |
August 28, 2014 |
Pike Island L/D, Ohio River, Mile 84.2 Closure of the 110-ft x 600-ft Auxiliary Lock Chamber |
14-46 |
August 28, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3 Closure of the 110-ft x 1,200-ft Primary Lock Chamber for Hydraulic System Repairs |
14-45 |
August 27, 2014 |
Hannibal L/D Pool, Ohio River, Mile 111.1 Overhead Electric Wire Conductor Work |
14-44 (Rev 1) |
September 4, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3, Closure of the 110-ft x 600-ft Auxiliary Lock Chamber |
14-44 |
August 21, 2014 |
Inspection of bulkhead system at New Cumberland Lock and Dam |
14-43 |
August 14, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3, Floating Mooring Bitts
|
14-42 |
August 8, 2014 |
Intake Inspection and Repairs, Monongahela River, Right Bank, Mile 77.6 |
14-41 |
August 5, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3, Closure of Both Lock Chambers |
14-31 (Rev 1) |
August 1, 2014 |
Allegheny L&D 5 Revised Operating Schedule
|
14-40 |
August 1, 2014 |
Shield Wire and Marker Ball Replacement, Ohio River, Mile 86.69 |
14-39 (Rev 1) |
July 31, 2014 |
Allegheny L/D's 6, 7, 8, & 9, Miles 36.3, 45.7, 52.6, 62.2, Revised Operating Schedule |
14-39 |
July 30, 2014 |
Allegheny L/D's 6, 7, 8, & 9, Miles 36.3, 45.7, 52.6, 62.2, Revised Operating Schedule |
14-38 |
July 24, 2014 |
Georgetown Sand and Gravel, Waterfront Construction Ohio River, Left Bank, Mile 38.0 |
14-37 (Rev 1) |
July 24, 2014 |
Revised Operating Schedule Allegheny L/D 2 and C.W. Bill Young L/D |
14-37 |
July 10, 2014 |
Revised Operating Schedule Allegheny L/D 2 and C.W. Bill Young L/D |
14-36 (Rev 1) |
July 29 2014 |
New Cumberland L/D, Ohio River, Mile 54.3, Closure of the 110-ft x 1,200-ft Main Lock Chamber |
14-36 |
July 10, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3 Closure of the 110-ft x 600-ft Auxiliary Lock Chamber |
14-35 |
July 7, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3, Closure of the 110-ft x 1,200-ft Primary Lock Chamber |
14-34 |
July 7, 2014 |
Smithfield Street Bridge Washing, Monongahela River, Mile 0.7 |
14-32 (Rev 1) |
July 7, 2014 |
UPDATE: Warning to Recreational Boaters |
14-32 |
June 30, 2014 |
Warning to recreational boaters: Keep Out buoys have moved off station. |
14-31 |
July 3, 2014 |
Allegheny Lock and Dam 5, Allegheny River, Mile 30.4, Temporary Revised Operating Schedule |
14-30 |
June 10, 2014 |
Pike Island Lock and Dam, Ohio river, Mile 84.2, Closure of the 110-ft x 1,200 -ft Primary Lock Chamber |
14-29 |
June 6, 2014 |
Braddock Locks and Dam, Monongahela River, Mile 11.3 Closure of the 56-ft x 360-ft River Chamber |
14-28 |
June 6, 2014 |
Lock and Dam 3, Monongahela River, Mile 23.8 Closure of the 56-ft x 720-ft Land Lock Chamber |
14-27 |
May 29, 2014 |
Pike Island Locks and Dams, Ohio River, Mile 84.2 Closure of the 110-ft x 600-ft Auxiliary Lock Chamber |
14-26 |
May 29, 2014 |
Hannibal Locks and Dams, Ohio River, Mile 126.4 Closure of the 110-ft x 1,200-ft Primary Lock Chamber |
14-25 |
May 27, 2014 |
Braddock Locks and Dam, Monongahela River, Mile 11.3 110-ft X 720-ft Land Lock
|
14-24 |
May 14, 2014 |
Test Boring - Kiskimentas River Miles 2-3 |
14-23 (Rev 2) |
July 22, 2014 |
Installation of Flashboards Lock & Dam 9, Allegheny River, Mile 62.2 |
14-23 (Rev 1) |
May 30, 2014 |
Update - Installation of Flashboards, Lock and Dam 9, Allegheny River, Mile 62.2 |
14-23 |
May 7, 2014 |
Installation of Flashboards, Lock and Dam 9, Allegheny River, Mile 62.2 |
14-22 |
May 5, 2014 |
Exploratory Drilling and Diving Operations along the Monongahela River, Left Descending Bank, Mile 125.5 |
14-21 |
May 2, 2014 |
Braddock Locks and Dam, Monongahela River, Mile 11.3, Closure of the 56-ft x 350-ft River Lock Chamber |
14-20 |
May 1, 2014 |
Schedule of Operations for 2014, Allegheny River Locks |
14-19 |
May 1, 2014 |
Schedule of Operations for 2014, Monongahela River Locks |
14-18 (Rev 1) |
July 22, 2014 |
Montgomery L/D, Ohio River, Mile 31.7 Closure of the 110-ft x 600-ft Primary Lock Chamber |
14-18 |
Jun 18, 2014 |
Montgomery L/D, Ohio River, Mile 31.7 Closure of the 110-ft x 600-ft Primary Lock Chamber |
14-17 (Rev 1) |
September 10, 2014 |
Dashields Locks and Dam, Ohio River, Mile 13.3, Closure of the 110-ft x 600-ft Primary Lock Chamber (Revision) |
14-17 |
Jun 18, 2014 |
Dashields Locks and Dam, Ohio River, Mile 13.3 Closure of the 110-ft x 600-ft Primary Lock Chamber |
14-16 |
May 5, 2014 |
Lock and Dam 3, Monongahela River, Mile 23.8, 47-Day Closure of the 56-ft x 720-ft Land Lock Chamber |
14-15 (Rev 1) |
May 7, 2014 |
Dashields Locks and Dam, Ohio River, Mile 13.3, Closure of the 110-ft x 600-ft Primary Lock Chamber |
14-15 |
April, 23, 2014 |
Dashields Locks and Dam, Ohio River, Mile 13.3, Closure of the 110-ft x 600-ft Primary Lock Chamber |
14-14 |
April 10, 2014 |
Shield Wire Replacement, Monongahela River, Mile 30 |
14-13 |
April 10, 2014 |
Shield Wire Replacement, Monongahela River, Mile 26 |
14-12 Rev 1 |
July 10, 2015 |
UPDATE: C.W. Bill Young L/D, Allegheny River, Mile 14.5, Missing Wall Armor |
14-12 |
April 8, 2014 |
C.W. Bill Young L/D, Allegheny River, Mile 14.5, Missing Wall Armor |
14-11 |
April 7, 2014 |
Dam Warning Buoys Allegheny, Monogahela, and Ohio Rivers |
14-10 (Revised Start Date) |
April 23, 2014 |
Shield Wire and Marker Ball Replacement, Ohio River Mile 86.69 |
14-10 |
March 28, 2014 |
Shield Wire and Marker Ball Replacement Ohio River, Mile 86.69 |
14-09 |
March 28, 2014 |
Shield Wire and Marker Ball Replacement Ohio River, Mile 76.1 |
14-08 |
March 26, 2014 |
Inspection of the 16th Street Bridge Allegheny River, Mile 1.5 |
14-07 |
March 18, 2014 |
U.S. Army Corps of Engineers will offer tow haulage assist service for the next (8) eight Saturdays effective date of March 22, 2014 and end date of May 10, 2014.
|
14-06 |
February 28, 2014 |
U.S. Army Corps of Engineers will close the lock chambers at New Cumberland L/D, Ohio River, Mile 54.3 as part of the FY14 Repair Program |
14-05 |
February 19, 2014 |
Dashields Locks and Dam, Ohio River, Mile 13.3, Intermittent Closures of the 110-ft x 600-ft Primary Lock Chamber |
14-04 (Rev 5) |
May 7, 2014 |
Allegheny L/D 5 Allegheny River Mile 30.4 through Allegheny L/D 9 Allegheny River Mile 62.2 Locks are Available for Service on the Allegheny River |
14-04 (Rev 4) |
April 18, 2014 |
Allegheny L/D 5 Allegheny River Mile 30.4 through Allegheny L/D 9 Allegheny River Mile 62.2 Locks are Unavailable For Service Due to Current Ice conditions on the Allegheny River |
14-04 (Rev 3) |
April 16, 2014 |
Allegheny L/D 5 Allegheny River Mile 30.4 through Allegheny L/D 9 Allegheny River Mile 62.2 Locks are Unavailable For Service Due to Current Ice conditions on the Allegheny River |
14-04 (Rev 2) |
February 28, 2014 |
Allegheny L/D 6 Allegheny River Mile 36.3 through Allegheny L/D 9 Allegheny River Mile 62.2 Locks are Unavailable For Service Due to Current Ice conditions on the Allegheny River |
14-04 |
January 30, 2014 |
Allegheny L/D 6 Allegheny River Mile 36.3 through Allegheny L/D 9 Allegheny River Mile 62.2 Locks Closed Due to Current Ice conditions |
14-03 (Rev 1) |
April 23, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3, 30 Day Closure of the Primary 110-ft x 1,200-ft Lock Chamber |
14-03 |
January 30, 2014 |
New Cumberland L/D, Ohio River, Mile 54.3 Closure of the Primary 110-ft x 1,200-ft Lock Chamber |
14-02 |
January 30, 2014
|
Pike Island L/D, Ohio River, Mile 84.2 Closure of the Primary 110-ft x 1,200-ft Lock Chamber |
14-01 (Rev 1) |
March 21, 2014 |
Bulkheads Set for Ice Skimming At New Cumberland L/D, Mile 54.4, Ohio River And Hannibal L/D, Mile 126.4, Ohio River |
14-01 |
January 15, 2014 |
Bulkheads Set for Ice Skimming, At New Cumberland L/D, Mile 54.4, Ohio River, and Hannibal L/D, Mile 126.4, Ohio River |