<< Previous Year << Previous Month | 2017 | Next Month >> |
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec |
List View | Calendar View| Daily View |
Event: | PUBLIC MEETING CHANGE: 60-Day Comment Period: Effluent Management Facility Secondary Containment Systems |
Category: | Public Comment Periods |
Event Date: | 11/28/2016 to 01/27/2017 |
The U.S. Department of Energy, Office of River Protection (ORP) is conducting a 60-day public comment period to support a proposed Class 3 permit modification to the Hanford Waste Treatment and Immobilization Plant (WTP) Dangerous Waste Permit. The modification is needed to support construction activities for the Direct-Feed Low Activity Waste Effluent Management Facility (EMF) Secondary Containment systems. The public comment period runs from November 28, 2016 through January 27, 2017. A public meeting was held January 9, 2017 in the Richland Library (955 Northgate Drive, Richland). Please find the public meeting presentation linked here. The proposed modification and supporting documentation are available for review at http://pdw.hanford.gov/arpir/index.cfm/viewDoc?accession=0073833H. Copies are also available for review at the Hanford Administrative Record Public Information Repository located at 2440 Stevens Drive, Richland, WA, and at other Hanford Public Information Repositories located throughout the Northwest. Please submit comments via email (preferred) or mail by January 27, 2017 to:
For more information, please see the fact sheet. Questions? Contact Dieter Bohrmann, ORP, at Dieter_G_Bohrmann@orp.doe.gov, or Randy Bradbury, Washington Department of Ecology, at Hanford@ecy.wa.gov.
|