Site Profile
- Introduction
(Revised October 24, 2006)
PDF 103 KB (10 pages)
Revision Includes: Incorporates Y-12 National Security
Complex Special Exposure Cohort class descriptions in a new
section. Text was added or modified on pages 5 and 6. Headings
and citations were added for the Technical Basis Documents. A
Reference section was added with the TBD references. The
Acronyms and Abbreviations page was adjusted per usage. No
sections were deleted. Constitutes a total rewrite of the document.
Incorporates formal internal and NIOSH review comments. This
revision results in no change to the assigned dose and no PER is
required.
- Site
Description
(Revised November 8, 2007)
PDF 196 KB (35 pages)
Revision Includes: Initiated to add Attributions and Annotations section
and additional references in response to review. The previous Section
A-3, Y-12 Facilities, was eliminated. No further changes occurred as a
result of formal internal review. Incorporates formal NIOSH review
comments. Constitutes a total rewrite of the document.
- Occupational
Medical Dose
(Revised June 18, 2007)
PDF 102 KB (23 pages)
Revision Includes: Initiated to add Attributions and Annotations section
and additional references in response to review. Added a Purpose and
Scope subsection to the Introduction (Section 3.1). Incorporates
formal internal and NIOSH review comments. This revision results in
no change to the assigned dose and no PER is required.
- Occupational
Environmental Dose
(Revised July 20, 2006)
PDF 894 KB (50 pages)
Revision Includes: Revision initiated to incorporate definitions and directions for dose reconstruction for non-presumptive cancers that are excluded from the 1943 through 1947 Special Exposure Cohort. Environmental concentrations in Tables D1 through D6 for the years 1943 through
1947 were marked as 'Reserved'.
- Occupational
Internal Dose
(Page Change Revision October 10, 2006)
PDF 341 KB (47 pages)
Page Change Revision Includes: Page change revision initiated to incorporate Y-12 National Security Complex Special Exposure Cohort class descriptions in newly added Section 5.1.3 on page 10. Minor changes occurred on pages 6, 8, and 9. Added one reference on page 37. Incorporates one new acronym, editorial changes on pages 8, 9, and 10, modifications to SEC instructions in Section 5.1.3.1 on page 10. Two references were deleted from the Reference Section. Incorporates internal and NIOSH formal review comments. No sections were deleted. This revision results in no change to the assigned dose.
- Occupational
External Dose
(Page Change Revision May 11, 2006)
PDF 305 KB (50 pages)
Page Change Revision Includes: Updates required language in Introduction (Section 6.1) on page 9. Revised to incorporate additional directions for dose reconstruction for non-presumptive cancers that are excluded from the 1943 through 1947 Special Exposure Cohort on page 10 Section 6.1.
Revised to delete text on page 10 in Section 6.1, specified in comments from OCAS review. No sections were deleted.
Top of Page
Technical Information Bulletins (TIBs)
Top of Page
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
-
PER 31: Y-12 TBD Revisions
PDF 17 KB (2 pages)
Document Number: OCAS-PER-0031 Rev-00
About this Document: Document to determine which
previously completed claims require
evaluation for the effect of revising the
Y-12 Plant TBD.
Approved: December 18, 2007
Summary: There were 693 Y-12 claims completed prior to January 12, 2006, with a probability of causation below 50%. The dose reconstruction methodology of each will be reviewed to determine if a new dose reconstruction is necessary to determine if the revisions increase the dose estimate. NIOSH will review these dose reconstructions to determine if they meet the criterion listed in this PER. NIOSH will provide DOL with the list of 693 claims as well as a determination on each claim as to whether a new dose estimate is required. Documentation for each claim not requiring a new dose reconstruction will provide the basis for that determination.
Top of Page
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for the Y-12 Plant:
- April 5, 2005
Meeting with Security, Police, and Fire Professionals of America; International Guards Union of America
Final Minutes
PDF 67 KB (9 pages)
- November 9, 2004
Meeting with Y-12 Atomic Trades and Labor Council
Final Minutes
PDF 43 KB (8 pages)
Top of Page
Comments on Y-12 Plant Documents
How to Submit Comments
Comments on Y-12 documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (021) on all comments.
Comments Received
Top of Page
Special Exposure Cohort Petition Information for the Y-12 Plant
- Submissions Not Qualifying
for Evaluation
In addition to the petition listed below, two additional
submissions were received but did not qualify for evaluation
because they did not meet the minimum petition requirements.
- Classes Not Added to the SEC
- Y-12 Plant (Statisticians)--The Secretary of HHS determined that the following employees do not meet the statutory criteria for addition to the SEC as authorized under EEOICPA: Statisticians who performed statistical analysis of biological experiments (working within the Oak Ridge National Laboratory Biological Sciences Division) in all locations
at the Y-12 Plant in Oak Ridge, Tennessee, who were employed by the Department of Energy or its contractors between January 1, 1958, and June 30, 1958.
- Classes Added to the
SEC
- Y-12 Plant (March
1943 through December 1947)--Department
of Energy (DOE) employees or DOE contractor or subcontractor
employees who worked in uranium enrichment operations
or other radiological activities at the Y-12 facility
in Oak Ridge, Tennessee from March 1943 through
December 1947 and who were employed for a number
of work days aggregating at least 250 work days,
either solely under this employment or in combination
with work days of employment occurring within the
parameters (excluding aggregate work day requirements)
established for other classes of employees included
in the SEC
- Y-12 Plant (January
1948 through December 1957)--Department
of Energy (DOE) employees or DOE contractor or subcontractor
employees who were monitored or should have been
monitored for: (1) Thorium exposures while working
in Building 9201-3, 9202, 9204-1, 9204-3, 9206,
or 9212 at Y-12 for a number of work days aggregating
at least 250 work days from January 1948 through
December 1957 or in combination with work days within
the parameters (excluding aggregate work day requirements)
established for one or more classes of employees
in the SEC; or (2) Radionuclide exposures associated
with cyclotron operations in Building 9201-2 at
Y-12 for a number of work days aggregating at least
250 work days from January 1948 through December
1957 or in combination with work days within the
parameters (excluding aggregate work day requirements)
established for one or more classes of employees
in the SEC.
- Y-12 Plant (March 1, 1943 through December 31, 1947)--All employees of the Department of Energy (DOE), its predecessor agencies, and DOE contractors or subcontractors who worked at the Y-12 Plant in Oak Ridge, Tennessee from March 1, 1943 through December 31, 1947, for a number of work days aggregating at least 250 work days occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees in the Special Exposure Cohort.
- Petition Information
NOTE: Four separate SEC Petitions have been
received for the Y-12 Plant. Because the period of
employment for three of the petitions overlapped,
those three petitions were merged into one petition
for evaluation purposes.
- Locations:
Oak Ridge, Tennessee--Building 9201-5 and the Beta
Building at Y-12
Job Titles and/or Job Duties: All
Control Operators
Period of Employment: January 1944
through December 1945
- Location:
Oak Ridge, Tennessee
Job Titles and/or Job Duties: All
Tennessee Eastman Corporation employees that conducted
laboratory equipment cleaning work
Period of Employment: From 1943
through 1947
- Job Titles and/or
Job Duties: All steamfitters, pipefitters,
and plumbers
Period of Employment: October 1944
through December 1957
- Location:
Oak Ridge, Tennessee
Job Titles and/or Job Duties: All
statisticians in all locations
Period of Employment: January 1,
1951 through June 30, 1959
- Location:
Oak Ridge, Tennessee
Job Titles and/or Job Duties: All
workers
Period of Employment: March 1, 1943
through December 31, 1947
- Federal Register
Notice Announcing that the Y-12 Plant SEC Petitions
met the Minimum Qualifications for Review and Evaluation
Petition Number
1 (as noted above)
April 7, 2005
PDF 52 KB (1 page)
Petition Numbers
2 and 3 (as noted above)
June 6, 2005
PDF 58 KB (2 pages)
Petition 4
(as noted above)
February 9, 2007
PDF 46 KB (1 page)
Petition 5
(as noted above)
October 3, 2007
PDF 51 KB (1 page)
- Copy of the Petitions
Received
Petition Number
1 (January 1944 through December 1945)
PDF 404 KB (8 pages)
Petition Number
2 (1943 through 1947)
PDF 1.7 MB (33 pages)
Petition Number
3 (October 1944 through December 1957)
PDF 1.6 MB (31 pages)
Petition Number
4
(January 1, 1951 through June 30, 1959)
PDF 935 KB (19 pages)
Petition Number
5 (March 1, 1943 through December 31, 1947)
PDF 564 KB (4 pages)
- SEC Petition Evaluation
Report
Y-12 SEC Petition
Evaluation Report (January 1944 through December 1945)
PDF 107 KB (25 pages)
Y-12 SEC Petition
Evaluation Report (October 1944
through December 1957)
PDF 235 KB (46 pages)
Appendix
1
 PDF 1.24 MB (81 pages)
Appendix
2
 PDF 158 KB (21 pages)
Supplement
to Y-12 SEC Petition (October 1944
through December 1957)
PDF 60 KB (5 pages)
Y-12 SEC Petition
Evaluation Report (January 1, 1951 through June 30, 1959)
PDF 316 KB (34 pages)
Y-12 SEC Petition
Evaluation Report (March 1, 1943 through December 31, 1947)
PDF 132 KB (19 pages)
- Petition Discussed
by the Advisory Board
The Advisory Board discussed the Y-12 Plant Petition
(March 1943 to December 1947) on July 5, 2005. A
copy of the transcript from the July 5, 2005, Advisory
Board meeting is below:
July 5, 2005
PDF 455 KB (253 pages)
The Advisory Board discussed the Y-12 Plant Petition
(1948-1957) on April 26, 2006 and June 15, 2006.
A copy of the transcript from the April 26, 2006,
Advisory Board meeting is below:
April 26, 2006
PDF 793 KB (436 pages)
The petition will be discussed by the Advisory Board
on October 4, 2007, during its regular meeting.
Y-12 SEC Petition (March 1, 1943 through December 31, 1947) was discussed by the Board on June 24, 2008, during its regular meeting.
- Advisory Board Recommendation
on SEC Petition
Y-12
Plant March 1943 to December 1947
PDF 94 KB (2 pages)
Y-12 Plant (March 1, 1943 through December 31, 1947)
PDF 39 KB (2 pages)
Y-12
Plant January 1948 through December 1957
PDF 258 KB (2 pages)
Y-12
Plant January 1, 1958 through June 30, 1958
PDF 258 KB (1 page)
- HHS Letter to Congress
Regarding the SEC Petition
Addition of
employees who worked in the uranium enrichment operations
at the Y-12 facility from March 1943 through December
1947 to the SEC
PDF 399 KB (11 pages)
Addition of
employees who worked in the uranium enrichment operations
at the Y-12 facility from January 1948 through December
1957 to the SEC
PDF 271 KB (6 pages)
Addition of
Statisticians who performed statistical analysis of biological experiments in all locations at the Y-12 Plant between January 1, 1958, and June 30, 1958
PDF 376 KB (9 pages)
HHS letter to Congress
regarding the SEC Petition for the Y-12 Plant (March 1,1943 through December
31, 1947)
PDF 459 KB (10 pages)
- Federal Register
Notice: Designation of a Class of Employees for
Addition to the Special Exposure Cohort
September
27, 2005 (March 1943 to December 1947)
PDF 45 KB (1 page)
September
7, 2006 (January 1948 to December 1957)
PDF 46 KB (1 page)
August 28, 2008 (March 1,1943 through December 31, 1947)
PDF 258 KB (5 pages)
- Federal Register
Notice: Determination Concerning a Petition to Add a Class of Employees to the Special Exposure Cohort
January 23, 2008 (January 1, 1958 through June 30, 1958)
PDF 45 KB (1 page)
- HHS Designation
of Additional Members to the SEC
HHS Designation
of a Class of Employees from Y-12 Plant, Oak Ridge,
Tennessee (March 1943 through December 1947)
PDF 406 KB (4 pages)
HHS Designation
of a Class of Employees from Y-12 Plant, Oak Ridge,
Tennessee (January 1948 through December 1957)
PDF 406 KB (4 pages)
HHS Designation of Additional Members from the Y-12 Plant (March 1,1943 through December
31, 1947) to the SEC
PDF 258 KB (5 pages)
- HHS Determination
of Additional Members to the SEC
HHS Determination
of a Class of Employees from Y-12 Plant, Oak Ridge,
Tennessee (January 1, 1958, through June 30, 1958)
PDF 152 KB (4 pages)
- Effective Date for
the SEC Class
September 24, 2005 (March 1943 to December 1947)
September 7, 2006 (January 1948 through December
1957)
September 14, 2008 (March 1,1943 through December 31, 1947)
- Federal Register
Notice: Final Effect of Designation of a Class of
Employees for Addition to the Special Exposure Cohort
October 3,
2005 (March 1943 to December 1947)
PDF 46 KB (1 page)
September
22, 2006 (January 1948 through December 1957)
PDF 46 KB (1 page)
October 8, 2008 (March 1, 1943 through December 31, 1947)
PDF 57 KB (2 pages)
- Letter to DOL Regarding
the Addition of a New Class of Employees to the
SEC
Y-12 Plant
March 1943 to December 1947
PDF 17 KB (1 page)
Y-12 Plant
January 1948 through December 1957
PDF 46 KB (2 pages)
Y-12 Plant
March 1, 1943 through December 31, 1947
PDF 17 KB (1 pages)
- Letter from DOL
Regarding the Return of All Cases for the New SEC
Class
Y-12 Plant
March 1943 to December 1947
PDF 506 KB (4 pages)
Top of Page
Previous Versions of Y-12 National Security Complex Documents
- Site Profile: Introduction section
- Page Change Revision October 11, 2005
PDF 81 KB (7 pages)
Page Change Revision Includes: Page change initiated to incorporate recent direction
from NIOSH to include details for the definition of a DOE facility on pages 4 and 5. No sections were
deleted.
- Page Change Revision November 24, 2004
PDF 78 KB (7 pages)
Page Change Revision Includes: Deletes acronyms and abbreviations for DOL IREP,
and Office Worker Compensation Program on page 3. Revises information on page 4 to incorporate changes from DOL and NIOSH Office
of General Counsel.
- Approved January 6, 2004
PDF 77 KB (7 pages)
- Site Profile: Site Description section
- Page Change Revision October 25, 2006
PDF 220 KB (35 pages)
Page Change Revision Includes: Adds
Purpose and Scope Sections on page 8; text and
tables were modified to clarify the use of the term
recycled uranium and when it was present on the
site; and text was added or modified on pages 7
and 8 in Section 2.1. Section 2.4.4 was
incorporated into Section 2.4.3. Changes
occurred on pages 11-19 and 32-34. This
revision results in no change to the assigned dose
and no PER is required. The document was revised in response
to comments from NIOSH during formal review.
- Page Change Revision October 11, 2005
PDF 220 KB (33 pages)
Page Change Revision Includes: Page change initiated to incorporate the definition
of U.S.C. on page 5 and details for the definition of a DOE facility on pages 6 and 7. No sections were deleted.
- Page Change Revision January 19, 2005
PDF 135 KB (33 pages)
Page Change Revision Includes: Revises document to incorporate changes from
NIOSH Office of General Counsel, to include a glossary and additional acronyms, to delete two unused references and add one new reference, to update the contents, and to make editorial changes.
- Page Change Revision September 9, 2004
PDF 231 KB (30 pages)
Page Change Revision Includes: Deletes unused reference on page 22.
- Approved November 19, 2003
PDF 203 KB (30 pages)
- Site Profile: Occupational Medical Dose section
- Page Change Revision April 18, 2006
PDF 166 KB (20 pages)
Page Change Revision Includes: Page change initiated to revise text in Table 3-5
on page 10 in Section 3.4 to remove reference that uterus is a surrogate for ovaries. No changes occurred as a result of formal internal review. No sections were deleted. Text on page 10 was revised in response to NIOSH formal review.
- Page Change Revision October 11, 2005)
PDF 164 KB (19 pages)
Page Change Revision Includes: Page change initiated to incorporate the definition of
U.S.C. on page 4 and details for the definition of a DOE facility on page 5. No sections were deleted.
- Page Change Revision September 9, 2004
PDF 180 KB (18 pages)
Page Change Revision Includes: Deletes references to Kathren et al., to be published
on pages 7, 11, 17 and 18. This document has not been published. Adds references on pages 7, 11, 17 and 18 for ORAU (Oak Ridge Associated Universities) 2003, Technical Information Bulletin: Dose Reconstruction from Occupationally Related Diagnostic X-ray Procedures, ORAUT-OTIB-0006 Rev 00, Oak Ridge, Tennessee. November 14, 2003.
- Approved December 15, 2003
PDF 178 KB (19 pages)
- Site Profile: Occupational Environmental
Dose section
- Page Change Revision October 11, 2005
PDF 782 KB (47 pages)
Page Change Revision Includes: Page change initiated to incorporate the definition of
U.S.C. on page 5 and details for the definition of a DOE facility on page 6. No sections were deleted.
- Page Change Revision September 9, 2004
PDF 801 KB (46 pages)
Page Change Revision Includes: Corrects last column on page 11. Heading of last
column changed from μCi cm-3 to μg cm-3.
- Page Change May 20, 2004
PDF 798 KB (45 pages)
Page Change Revision Includes: Corrects 3rd column on page 46, dose rate
excluding background column from mrem h-1 to
μrem h-1. Adds grid lines to Table D-7.
- Approved December 5, 2003
PDF 806 KB (45 pages)
- Site Profile: Occupational Internal Dose section
- Revised August 3, 2006
PDF 366 KB (47 pages)
Revision Includes: Revised to incorporate additional directions for dose construction for non-presumptive cancers that are excluded from the 1943 through 1947 Special Exposure Cohort. Approved issue of Revision 02. Removed Section 5.4 from the text and Table of Contents, as the
most recent page change addresses 1943-1947, and coworker data are used for 1948 to 1950, as specified in the coworker TIB. Incorporates NIOSH formal review comments. This revision results in no change to the assigned dose.
- Page Change Revision February 14, 2006
PDF 343 KB (46 pages)
Page Change Revision Includes: Approved page change revision. Page changes initiated to incorporate definitions and directions for dose reconstruction for non-presumptive cancers that are excluded from the 1943 through 1947 Special Exposure Cohort. Affected pages are: page 7, page 9 in Section 5.1, pages 20 and 21 in Section 5.2.1.1, and page 36 in the Reference Section. No sections were deleted.
- Page Change Revision January 12, 2006
PDF 339 KB (45 pages)
Page Change Revision Includes: No changes occurred as a result of formal internal review. Page change initiated to make minor changes to text in Section 5.1, page 7. Deletes and adds text about the default value for the Th-228/Th-232 equilibrium ratio for lung counts in Section 5.3, page 31. Adds new Figure 5.4. - variation of activity in natural thorium after a single purification on page 31. Also, changes date in C. M. West reference on page 36. No sections were deleted.
- Page Change Revision October 11, 2005
PDF 328 KB (44 pages)
Page Change Revision Includes: Page change initiated to incorporate the definition of U.S.C. on page 6 and details for the definition of a DOE facility on page 7. No sections were deleted.
- Revised May 10, 2005
PDF 196 KB (44 pages)
Revision Includes: First revision to include table numbers and titles
in the body of the document.
- Site Profile: Occupational External Dose section
- Page Change Revision February 14, 2006
PDF 304 KB (49 pages)
Page Change Revision Includes: Approved page change revision. Page changes initiated to incorporate definitions and directions for dose reconstruction for non-presumptive cancers
that are excluded from the 1943 through 1947 Special Exposure Cohort. Affected pages are: page 7, pages 8 and 9 in Section 6.1. No sections were deleted.
- Page Change Revision October 11, 2005
PDF 300 KB (48 pages)
Page Change Revision Includes: Page change initiated to incorporate the definition
of U.S.C. on page 7 and details for the definition of a DOE facility on page 8. No sections were deleted.
- Approved November 19, 2003
PDF 318 KB (47 pages)
Top of Page
Page last updated: October 9, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)
|