Yumen 100MW Molten Salt Tower CSP project
Status Date: | September 27, 2016 |
---|
Project Overview | |
Project Name: | Yumen 100MW Molten Salt Tower CSP project |
---|---|
Country: | China |
Location: |
Yumen (Gansu Province) |
Owner(s): | Beijing Guohua Electric Power Co., Ltd |
Technology: | Power tower |
Turbine Capacity: | Net: 100.0 MW Gross: 100.0 MW |
Status: | Under development |
Background
Technology: | Power tower |
---|---|
Status: | Under development |
Country: | China |
City: | Yumen |
Region: | Gansu Province |
Contact(s): | Webmaster Solar |
Participants
Developer(s): | SunCan |
---|---|
Owner(s) (%): | Beijing Guohua Electric Power Co., Ltd |
Plant Configuration
Solar Field
Heat-Transfer Fluid Type: | Molten Salt |
---|
Power Block
Turbine Capacity (Gross): | 100.0 MW |
---|---|
Turbine Capacity (Net): | 100.0 MW |
Thermal Storage
Storage Type: | 2-tank direct |
---|---|
Storage Capacity: | 10 hours |
Thermal Storage Description: | Molten Salt |