LRP - Licenses

LRP - Regulations

LRP - Permits

Recreation - Statewide

Recreation - Trapping

Recreation - Fishing

Recreation - Hunting

Env. Protection - Management

Env. Protection - Emergency

Env. Protection - Resources

To sign up for updates or to access your subscriber preferences, please enter your contact information below.



 

Storm water construction technical standards

Storm water construction technical standards are documents that specify the minimum requirements needed to plan, design, install and maintain a wide array of conservation practices aimed at preserving the land and water resources of Wisconsin during construction. They are based on current research, field experience, the best available technology.

The DNR has approved the technical standards listed below as adequate and effective to implement the performance standards of subch. III or IV of ch. NR 151 for erosion/sediment control or storm water management during construction.

Note: See the Errata notes at the end of the table for updates to the standards.

Construction site erosion & sediment control standards

Erosion and Stabilizations Practices Number Effective Date
Channel Erosion Mat [PDF]
1053
Aug-05
Construction Site Diversion [PDF]
1066
Mar-06
Ditch Checks [PDF]
1062
Mar-06
Dust Control [PDF]
1068
Mar-04
Land Application of Additives for Erosion Control [PDF]
1050
Dec-15
Mulching for Construction Sites [PDF]
1058
Jun-03
Non-channel Erosion Mat [PDF]
1052
Aug-03
Seeding [PDF]
1059
Nov-03
Stone Tracking Pad and Tire Washing [PDF]
1057
Aug-03
Grading Practices for Erosion Control - Temporary [PDF]
1067
Mar-04
Vegetative Buffer for Construction Sites [PDF]
1054
May-03
Errata and Notes
  • Standards updates: Errata [PDF]
  • Downers Grove North CAD format files use the DGN file extension
Sediment Control Practices Number Effective Date
De-watering [PDF]
1061
Apr-07
Sediment Bale Barrier [PDF]
1055
Aug-03
Sediment Basin [PDF]
1064
Mar-06
Sediment Trap [PDF]
1063
Oct-14
Silt Curtain [PDF]
1070
Sep-05
Silt Fence [PDF]
1056
Mar-06
Storm Drain Inlet Protection For Construction Sites [PDF]
1060
Jun-16
Turbidity Barriers [PDF]
1069
Sep-05
Water Application of Additives for Sediment Control [PDF]
1051
Dec-15
Interim Manufactured Perimeter Control and Slope Interruption Products [PDF]
1071
Nov-10
Errata and Notes
  • Standards updates: Errata [PDF]
  • Downers Grove North CAD format files use the DGN file extension

Additional information

Last revised: Thursday August 18 2016