You are here

CX-002794: Categorical Exclusion Determination

Advanced Implementation of A123's Community Energy Storage (CES) System for Grid Support
CX(s) Applied: B4.6, B5.1
Date: 06/25/2010
Location(s): Detroit, Michigan
Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

Install 20 Community Energy Storage units into an electric utility system that includes a 1 megawatt storage device integrated into a solar-power system. The units will be coupled with the utility scale device for demonstration.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD