You are here

EA-1533: Floodplain Assessment

Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas 

This environmental assessment (EA) provides sufficient evidence and analysis for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) to conclude that potential adverse effects from the upgrade of the distribution system within plant boundaries and the construction of a 10-inch gas main off the plant site for a length of 8.6 miles would be minimal, under normal conditions.