Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington
A document that DOE prepares in accordance with DOE NEPA regulations (10 CFR 1021.314(c)) to determine whether a supplemental or new EIS should be prepared pursuant to CEQ NEPA regulations (40 CFR 1502.9(c).
If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance.
Documents Available for Download
-
June 14, 2013
-
April 1, 2013
Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and DOE/EIS-0218-SA-06)
-
March 26, 2013
Disposition of Mixed Low-Level Waste and Low-Level Waste from Advanced Mixed Waste Treatment Project at Commercial Facilities, Idaho
-
February 11, 2013
Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components, Texas
-
November 28, 2012
Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA
-
September 3, 2012
Final Site-Wide Environmental Assessment for Sandia National Laboratories/California
-
August 27, 2012
Transportation of Depleted Uranium Hexafluoride for Conversion to Depleted Uranium Oxide
-
July 24, 2012
Construction and Operation of a Heterogeneous Feed Biorefinery, Enerkem Corporation, Pontotoc, Mississippi
-
July 11, 2012
Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA
-
May 11, 2012
Transfer and Return of Low-Enriched Uranium Fuel Elements from Idaho National Laboratory to the Research Reactor in Vienna, Austria (DOE/EIS-0218F-SA-05 and DOE/EIS-0203-SA-05)
-
April 15, 2012
Transmission System Vegetation Management Program EIS
-
March 5, 2012
Savannah River Site High-Level Waste Tank Closure, SC
-
February 8, 2012
Draft Tank Closure and Waste Management, Hanford Site, Richland, WA
-
January 25, 2012
Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Lancaster, OH
-
December 30, 2011
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-
0285/SA-455 Bandon-Rogue No. 1) PP&A Project #2178 -
November 14, 2011
Transmission System Vegetation Management Program, Rivergate-Keeler No. 1
-
November 8, 2011
Transmission System Vegetation Management Program, Ross-St. Johns No. 1
-
November 8, 2011
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-452 Ross-St. Johns No. 1) PP&A Project
-
November 3, 2011
Transmission System Vegetation Management Program, Carlton-Tillamook Transmission Line Corridor
-
November 3, 2011
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-
0285/SA-451 Carlton-Tillamook Transmission Line Corridor, PP&A-2068) -
September 27, 2011
Transmission System Vegetation Management Program, Kalispell-Kerr #1 Transmission Line Corridor
-
September 26, 2011
Transmission System Vegetation Management Program, Flathead-Hot Springs Transmission Line Corridor
-
September 15, 2011
Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC, Emmetsburg, Iowa
-
August 22, 2011
Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-
0285/SA448 Pearl-Marion No. 1 Transmission Line Corridor) Project No. PP&A # 2049 -
August 15, 2011
Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington