NOOR II
Status Date: | November 16, 2015 |
---|
Project Overview | |
Project Name: | NOOR II |
---|---|
Country: | Morocco |
Location: | Ouarzazate |
Owner(s): | |
Technology: | Parabolic trough |
Turbine Capacity: | Net: 200.0 MW Gross: 200.0 MW |
Status: | Under construction |
Start Year: | 2017 |
Background
Technology: | Parabolic trough |
---|---|
Status: | Under construction |
Country: | Morocco |
City: | Ouarzazate |
Contact(s): | Webmaster |
Break Ground: | May 2015 |
Start Production: | 2017 |
PPA/Tariff Rate: | 1.36 MAD per kWh |
PPA/Tariff Information: | USD 0.14 kWh |
Participants
Developer(s): | ACWA |
---|---|
EPC Contractor: | Sener |
Generation Offtaker(s): | ONE |
Plant Configuration
Solar Field
Heat-Transfer Fluid Type: | Thermal oil |
---|---|
Solar-Field Inlet Temp: | 293°C |
Solar-Field Outlet Temp: | 393°C |
Power Block
Turbine Capacity (Gross): | 200.0 MW |
---|---|
Turbine Capacity (Net): | 200.0 MW |
Output Type: | Steam Rankine |
Thermal Storage
Storage Type: | 2-tank indirect |
---|---|
Storage Capacity: | 7 hours |
Thermal Storage Description: | Molten salt |