Conveyance of Real Property at the Portsmouth Gaseous Diffusion Plant in Pike County, Ohio
Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact.
If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
January 3, 2017
-
December 30, 2016
Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and Polson, Montana
-
December 22, 2016
Energy Efficiency Standards for New Federal Low-Rise Residential Buildings’ Baseline Standards Update (RIN 1904-AD56)
-
December 9, 2016
Brine Disposal Pipeline, West Hackberry Facility, Cameron Parish, Louisiana
-
November 17, 2016
Lake Erie Connector Project; Conneaut Township, Pennsylvania
-
November 10, 2016
Willow Creek Wind Farm; Butte County, South Dakota
-
November 2, 2016
Upper Columbia Spring Chinook and Steelhead Acclimation Project; Chelan County, Washington
-
October 24, 2016
Strategic Petroleum Reserve Repair/Enhancement of Access to Remote Pipeline Valve Stations, West Hackberry; Calcasieu and Cameron Parishes, Louisiana
-
October 13, 2016
EA-2018: Front Range-Midway Solar Interconnection Project; El Paso County, Colorado
-
October 7, 2016
Public Comment Period Ends: 11/14/16
Bonneville Power Administration is preparing an EA that analyzes the potential environmental impacts of a proposal by the Kootenai Tribe of Idaho to support recovery efforts for the endangered Kootenai River white sturgeon and address the needs of other native fish stocks in the Kootenai River. The proposal would restore fish habitat by enhancing islands and side channels and restoring streambanks. -
September 29, 2016
EA-1981: Bonneville-Hood River Transmission Line Rebuild; Multnomah and Hood River Counties
-
August 24, 2016
EA-2043: Columbia Stock Ranch Section 536 Ecosystem Restoration Project; Columbia County, Oregon
-
August 24, 2016
EA-2043: Columbia Stock Ranch Section 536 Ecosystem Restoration Project; Columbia County, Oregon
-
August 11, 2016
Cameron LNG Expansion Project
-
August 10, 2016
Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane County, Oregon
-
August 9, 2016
Willow Creek Wind Farm; Butte County, South Dakota
-
July 15, 2016
Front Range-Midway Solar Interconnection Project; El Paso County, Colorado
-
July 7, 2016
Columbia Estuary Ecosystem Restoration Program
-
June 29, 2016
Energy Conservation Standards for Manufactured Housing (RIN 1904-AC11)
-
June 24, 2016
Alternating Gradient Synchrotron Complex Improvements at Brookhaven National Laboratory; Upton, New York
-
June 3, 2016
Lake Erie Connector Project
-
May 11, 2016
Columbia Estuary Ecosystem Restoration Program
-
April 19, 2016
Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon
-
April 8, 2016
Alternating Gradient Synchrotron Complex Improvements at Brookhaven National Laboratory; Upton, New York
-
April 4, 2016
Biomedical Research at Existing Biosafety Level 3 Laboratories with Registered Select Agent Programs