Name of Study |
Planning |
Implementation |
Status |
30th Street Specific Area Plan |
X |
|
Ongoing |
Access Management Toolkit |
X |
X |
Ongoing |
ACHD Capital Improvements Plan |
X |
|
Ongoing |
Ada County and Canyon County Park-and-Ride Lot Location Study |
|
X |
Future |
Ada County Roundabout Policy Study, Including Amity Road Corridor Roundabout Concept Study |
X |
X |
Ongoing |
Blueprint for Good Growth |
X |
X |
Ongoing |
Boise Park-and-Ride Study |
|
X |
Future |
Bowmont Road Corridor Study, SH 44 to Canyon/Ada County Line |
X |
|
Future |
City of Middleton Master Transportation Plan |
X |
|
2007 |
Cloverdale Road Corridor Study, I-84 to US Highway 20/26 (Chinden Blvd.) |
|
X |
Future |
Communities in Motion |
X |
X |
2006 |
Communities in Motion Implementation Guidebook |
X |
|
Ongoing |
Downtown Boise Mobility Study |
X |
X |
2006 |
Downtown Meridian Transportation Management Plan |
X |
|
2005 |
East 3rd Street Extension and Alignment Study |
|
X |
Ongoing |
Fairview Avenue Corridor Study, Linder to Orchard |
|
X |
Ongoing |
Fine Particulate (PM2.5) Precursor Monitoring Study |
X |
|
Ongoing |
Five-Year Strategic Plan (Valley Regional Transit) |
X |
|
2007 |
Five-Year Work Plan (Ada County Highway District) |
|
X |
Ongoing |
Floating Feather Alignment Study |
|
X |
Ongoing |
High Volume Intersection Study |
X |
|
2008 |
Household Travel Survey |
X |
|
Future |
I-84, Karcher Interchange to Five Mile Road |
X |
X |
Ongoing |
I-84, Orchard to Isaacs Canyon Corridor |
|
X |
Ongoing |
I-84, Ten Mile Interchange Access Study |
|
X |
2005 |
Idaho 55 Eagle Road Advanced Transportation Management System |
|
X |
2005 |
Idaho 55 Eagle Road Arterial Study |
X |
X |
2005 |
Interchange Feasibility Study Junction SH 16 and SH 44 |
X |
X |
2005 |
Kuna-Mora Road Corridor Study - Phase 1, Canyon County Line to I-84 |
X |
X |
Ongoing |
Kuna-Mora Road Corridor Study - Phase 2, McDermott Road to Eagle Road |
X |
|
Ongoing |
Kuna Park-and-Ride Study |
|
X |
Future |
Lake Hazel Extension/Gowen Road Relocation |
|
X |
Ongoing |
Middleton Road Connections Study |
|
X |
2006 |
Mobility Management Strategies |
X |
X |
2009 |
Northwest Ada Foothills Transportation Study - Phase 2 |
X |
|
Future |
Pavement Management Study and Plan |
X |
|
2008 |
Pedestrian and Bicycle Transition Plan |
|
X |
2005 |
Purple Sage - Beacon Light Corridor Study |
|
X |
Ongoing |
Regional Operations and Capital Improvements Plan |
X |
X |
2005 |
Regional Transportation Service Coordination Plan |
|
X |
2007 |
Roadways to Bikeways Master Plan for Ada County |
X |
X |
Ongoing |
South Meridian Transportation Master Plan |
X |
|
2007 |
Southwest Boise Transportation Study & Eagle/ Cloverdale Connection |
X |
|
Ongoing |
State Highway 16, I-84 to South Emmett Corridor Study |
|
X |
Ongoing |
State Highway 16 Improvement Study |
|
X |
2005 |
State Highway 19 Corridor Plan |
X |
|
Future |
State Highway 21 Corridor Plan |
X |
|
Future |
State Highway 44 Corridor Preservation Study |
|
X |
Ongoing |
State Highway 45 Corridor Plan |
X |
|
Future |
State Highway 55 Corridor Plan |
X |
|
Ongoing |
State Highway 69 Corridor Plan |
X |
|
Future |
State Street Corridor Study, Right-of-Way and Alignment Study (Phase 2) |
|
X |
Ongoing |
State Street Implementation Study (Phase IA) |
|
X |
Ongoing |
Three Cities River Crossing Study |
|
X |
2006 |
Traffic Management Center, Location, and Concept |
|
X |
2008 |
Transportation and Land Use Study (Blueprint for Good Growth Implementation) |
X |
|
Ongoing |
Traveler Opinion & Perception (TOP) Survey |
X |
|
2005 |
Treasure Valley Air Quality Study |
X |
|
Future |
Treasure Valley High Capacity Transit Study |
X |
X |
Ongoing |
Treasure Valley Intelligent Transportation Systems (ITS) Strategic Plan |
X |
|
2006 |
Treasure Valley Truck Freight Travel Study |
X |
|
Ongoing |
Urban Interchange Concept |
|
X |
Future |
Urban Land Institute Report |
X |
|
2005 |
US 20/26 Corridor Plan |
X |
|
Future |
US 20/26 Corridor Preservation Study |
|
X |
Ongoing |
US 95 Corridor Plan |
X |
|
Future |
Ustick Road Concept Study, Midland to McDermott |
X |
|
Future |
Ustick Road Corridor Study, Eagle Road to Five Mile |
|
X |
Ongoing |
West Bench Circulation Study |
X |
|
Ongoing |
Western Canyon County Truck Route Corridor Study |
X |
|
Ongoing |
The studies listed are used for a variety of purposes. A planning study is used in a planning document, such as the long-range transportation plan. These studies will not include detailed data from an engineer nor an environmental report. An implementation study is used to confirm an alignment or placement of a project and the engineering and environmental reports needed to build the project. Some studies provide both aspects: planning as well as an implementation schedule. In most of these cases, an implementation study for any specific project is still needed.