COMPASS Home Page COMPASS People & Structure COMPASS Products & Services COMPASS - Communication & Public Awareness COMPASS Planning & Collaboration COMPASS Calendar
COMPASS - About Us Contact Us COMPASS - What's New COMPASS - Jobs & Contracts COMPASS - Links COMPASS - Frequently Asked Questions COMPASS - Site Map COMPASS - Search
     
 
Compass Logo
Conferences
Links
Partners
Plans & Regulations
Request for Services
Resource Sharing
Studies Coordination
Technical Support

 

 

Get Acrobat Reader

Planning & Collaboration - Ongoing Study Status & Map

Studies Coordination Map - Click Here.

Name of Study

Planning 

Implementation 

Status

30th Street Specific Area Plan

X
  Ongoing
Access Management Toolkit
X
X
Ongoing

ACHD Capital Improvements Plan

X

 

Ongoing

Ada County and Canyon County Park-and-Ride Lot Location Study

 
X
Future

Ada County Roundabout Policy Study, Including Amity Road Corridor Roundabout Concept Study

X
X
Ongoing

Blueprint for Good Growth

X

X

Ongoing

Boise Park-and-Ride Study  
X
Future
Bowmont Road Corridor Study, SH 44 to Canyon/Ada County Line
X
Future
City of Middleton Master Transportation Plan
X
2007

Cloverdale Road Corridor Study, I-84 to US Highway 20/26 (Chinden Blvd.)

 
X
Future

Communities in Motion

X

X

2006

Communities in Motion Implementation Guidebook
X
  Ongoing

Downtown Boise Mobility Study

X

X

2006

Downtown Meridian Transportation Management Plan

X

 

2005

East 3rd Street Extension and Alignment Study  
X
Ongoing

Fairview Avenue Corridor Study, Linder to Orchard

 
X
Ongoing

Fine Particulate (PM2.5) Precursor Monitoring Study

X
  Ongoing

Five-Year Strategic Plan (Valley Regional Transit)

X

 

2007

Five-Year Work Plan (Ada County Highway District)

 

X

Ongoing

Floating Feather Alignment Study

 

X

Ongoing

High Volume Intersection Study

X
 
2008
Household Travel Survey
X
Future

I-84, Karcher Interchange to Five Mile Road

 X

 X

Ongoing

I-84, Orchard to Isaacs Canyon Corridor  
X
Ongoing

I-84, Ten Mile Interchange Access Study

 

X

2005

Idaho 55 Eagle Road Advanced Transportation Management System

 

X

2005

Idaho 55 Eagle Road Arterial Study

X

X

2005

Interchange Feasibility Study Junction SH 16 and SH 44

X

X

2005

Kuna-Mora Road Corridor Study - Phase 1, Canyon County Line to I-84

X
X
Ongoing
Kuna-Mora Road Corridor Study - Phase 2, McDermott Road to Eagle Road
X
  Ongoing
Kuna Park-and-Ride Study  
X
Future

Lake Hazel Extension/Gowen Road Relocation

 

X

Ongoing

Middleton Road Connections Study

 

X

2006

Mobility Management Strategies

X
X
2009

Northwest Ada Foothills Transportation Study - Phase 2

X
 
Future

Pavement Management Study and Plan

X
2008

Pedestrian and Bicycle Transition Plan

 

X

2005

Purple Sage - Beacon Light Corridor Study

 
X
Ongoing

Regional Operations and Capital Improvements Plan

X

X

2005

Regional Transportation Service Coordination Plan  
X
2007

Roadways to Bikeways Master Plan for Ada County

X
X
Ongoing

South Meridian Transportation Master Plan

X
 
2007

Southwest Boise Transportation Study & Eagle/ Cloverdale Connection

X
  Ongoing
State Highway 16, I-84 to South Emmett Corridor Study  
X
Ongoing

State Highway 16 Improvement Study

 

X

2005

State Highway 19 Corridor Plan
X
 
Future
State Highway 21 Corridor Plan
X
 
Future

State Highway 44 Corridor Preservation Study

 

X

Ongoing

State Highway 45 Corridor Plan
X
 
Future

State Highway 55 Corridor Plan

X
  Ongoing
State Highway 69 Corridor Plan
X
 
Future

State Street Corridor Study, Right-of-Way and Alignment Study (Phase 2)

 

X

Ongoing

State Street Implementation Study (Phase IA)

 
X
Ongoing

Three Cities River Crossing Study

 

X

2006

Traffic Management Center, Location, and Concept

 

X

2008

Transportation and Land Use Study (Blueprint for Good Growth Implementation)

X
  Ongoing

Traveler Opinion & Perception (TOP) Survey

X

 

2005

Treasure Valley Air Quality Study
X
Future

Treasure Valley High Capacity Transit Study

X

X

Ongoing

Treasure Valley Intelligent Transportation Systems (ITS) Strategic Plan
X
 
2006

Treasure Valley Truck Freight Travel Study

X
  Ongoing

Urban Interchange Concept

 

X

Future

Urban Land Institute Report

X

 

2005

US 20/26 Corridor Plan
X
 
Future

US 20/26 Corridor Preservation Study

 

X

Ongoing

US 95 Corridor Plan

X
 
Future
Ustick Road Concept Study, Midland to McDermott
X
 
Future

Ustick Road Corridor Study, Eagle Road to Five Mile

  X Ongoing
West Bench Circulation Study
X
 
Ongoing
Western Canyon County Truck Route Corridor Study
X
 
Ongoing

Studies: Planning vs. Implementation

The studies listed are used for a variety of purposes. A planning study is used in a planning document, such as the long-range transportation plan. These studies will not include detailed data from an engineer nor an environmental report. An implementation study is used to confirm an alignment or placement of a project and the engineering and environmental reports needed to build the project. Some studies provide both aspects: planning as well as an implementation schedule. In most of these cases, an implementation study for any specific project is still needed.