White Wind Farm Brookings County, South Dakota
The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information these documents may contain. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public.
Requesting Secure NEPA Documents
You may request copies of documents by e-mail or by leaving a message on our toll-free information line at 1-800-472-2756. Please provide the following information in your request:
Title and Number of Document requested
First Name:
Last Name:
Address:
City:
State:
Zip Code:
Organization (If Applicable):
E-mail:
Phone:
List of Secure NEPA Documents
-
April 1, 2007
-
August 1, 2006
White Wind Farm Brookings, County, South Dakota
-
February 1, 2004
Low-Emission Boiler System Proof-of-Concept Project
-
November 1, 2001
Oak Ridge Y-12 Plant
-
March 1, 2001
Savannah River Site Salt Processing Alternatives Draft Supplemental Environmental Impact Statement
-
December 1, 2000
Oak Ridge Y-12 Plant
-
July 1, 2000
Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility
-
July 1, 1999
Treatment of Sodium-Bonded Spent Nuclear Fuel
-
April 1, 1999
Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride
-
March 1, 1999
Accelerator Production of Tritium at the Savannah River Site
-
March 1, 1999
Griffith Energy Project
-
December 24, 1998
Savannah River Site, Spent Nuclear Fuel Management
-
May 8, 1998
Draft Environmental Impact Statement (EIS) for the Construction and Operation of a Proposed Tritium Extraction Facility (TEF) at the Savannah River Site (SRS)
-
December 1, 1996
Storage and Disposition of Weapons-Usable Fissile Materials
-
August 1, 1996
Nevada Test Site and Off-Site Locations in the State of Nevada
-
April 1, 1996
Medical Isotopes Production Project: Molybdenum 99 and Related Isotopes Environmental Impact Statement
-
October 1, 1995
Tritium Supply and Recycling
-
July 1, 1995
Savannah River Site Waste Management
-
May 1, 1995
Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility
-
December 1, 1994
F-Canyon Plutonium Solutions
-
November 1, 1994
Defense Waste Processing Facility
-
June 1, 1993
Responses to Comments on Remedial Investigation/Feasibility Study-Environmental Impact Statement for Remedial Action at the Chemical Plant Area of the Weldon Spring Site
-
February 1, 1988
Alternate Cooling Water Systems, Savannah River Plant
-
May 1, 1984
L-Reactor Operation Savannah River Plant
-
September 1, 1977
Waste Management Operations Savannah River Plant