Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Interim Renewal Warren Act Contract Between the United States and Sacramento Municipal Utility District
Site:
Summary:
Reclamation proposes to execute two 26-month interim renewal Warren Act (WA) contract with Sacramento Municipal Utility District. The WA contract is for the conveyance, within a 26 month period, of up to 15,000 acre-feet of SMUDs non-CVP water. The conveyance of water is through the Folsom South Canal at Nimbus Dam for Municipal and Industrial uses within the SMUD’s service area at Rancho Seco in south eastern Sacramento County.

Status:
12/28/2012:
Draft EA available for review on November 15, 2012. Comments due December 17, 2012. FONSI signed on December 28, 2012.

Contacts:
Elizabeth  Dyer
Phone: (916) 989-7256
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI and final EA, Interim Renewal Warren Act Contract Between the United States and Sacramento Municipal Utility District .pdf 4,547.90KB 
File with .pdf extension Draft EA, Interim Renewal Warren Act Contract Between the United States and Sacramento Municipal Utility District .pdf 495.48KB