Planning
This page provides current information on long-term planning in the ERCOT region.
Current Information
-
ERCOT System Operating Limit (SOL) Methodology
This document identifies the methodology for determining System Operating Limits (SOLs) and Interconnection Reliability Operating Limits (IROLs), in the planning and operations time horizons, as required by NERC FAC-010 and FAC-011 to be used by the ERCOT Planning Authority/Reliability Coordinator as well as all applicable NERC Registered Transmission Operators and Transmission Planners in the ERCOT Region.
-
Planning Horizon Transmission Capability Methodology
This document identifies the planning processes and procedures for calculating Transmission Capacities to satisfy NERC FAC-012 and FAC-013.
Key Documents
-
Transmission Project and Information Tracking
(Oct 15, 2016 – zip – 264.6 KB) -
Archived Transmission Project and Information Tracking
(Jul 01, 2015 – zip – 7.5 MB)