FavoritePlease sign in to add this to your favorites. Topic: Water Heating Subtopic: Maintenance/Inspection Desired Outcome: Minimize energy and water waste to the lowest possible life cycle cost Multifamily HomesPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 7.8103.9a Hazardous material removal Health concerns in the removal and replacement of equipment (e.g., asbestos, other hazardous materials) will be identifiedWritten notification will be provided to occupants of the discovery of hazardous material, including contact information for regional EPA EPA U.S. Environmental Protection Agency, www.epa.gov asbestos coordinatorOccupant will be asked to contract with an EPA EPA U.S. Environmental Protection Agency, www.epa.gov -certified asbestos contractor to conduct abatement before decommissioning and replacement (occupant is responsible for abatement or remediation) Remediate health hazards using EPA EPA U.S. Environmental Protection Agency, www.epa.gov -certified contractors 7.8103.9b Installation Spring-loaded check valve will be installed on the hot water return of a recirculation loop immediately upstream of the storage tankSystem will be purgedValves will be added to the recirculation line to purge the system if neededWork will be completed in an aesthetically pleasing manner (e.g., repairs made to structure and finished surfaces) Eliminate crossover 7.8103.9c Commissioning Water pressure downstream of the check valve will be verified Ensure proper operation Previous Detail Back to 7.8103 Maintenance/Inspection Back to Top