| 5.3003.3a
Total air flow | Total system air flow will be measured by: - Temperature rise
- Flow plate
- Fan depressurization device (e.g., Duct Blaster, DucTester)
| Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3b
External static pressure | External static pressure will be in accordance with manufacturer specifications | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3c
Pressure | Pressure drop across cooling coils will be in accordance with manufacturer specifications | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3d
Pressure drop: filter | Pressure drop across filter will be in accordance with manufacturer specifications | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3e
Balancing room flow: new ductwork | Air flow will be measured at each register to ensure proper air flow delivery | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3f
Supply wet bulb and dry bulb | Supply wet bulb and dry bulb air temperatures will be recorded | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3g
Return wet bulb and dry bulb | Return wet bulb and dry bulb air temperatures will be recorded | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |
| 5.3003.3h
Temperature rise: gas and oil furnaces only | Temperature rise between the supply and return will be in accordance with manufacturer specifications | Ensure equipment operates as designed Ensure equipment operates efficiently Ensure equipment provides comfort Ensure equipment operates safely Ensure equipment is durable |