4.1301.5a
Air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
Air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
will be installed between joists and sealed
Air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
will be placed to the most interior edge of the top plate of the wall below
Separate cantilevered floor from conditioned floor space
Allow for insulation
4.1301.5b
Installation
Air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
will be insulated between joist from top plate of the wall below to subfloor above
Cantilevered subfloor will be insulated in complete contact with the floor without gaps, voids, compressions, misalignments, or wind intrusions
If kraft-faced batts are used, they will be installed with kraft facing to the
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
Insulation will be installed to prescribed R-value
Insulate to prescribed R-value
4.1301.5c
Attachment Batts will be secured with physical fasteners
Ensure insulation remains in contact with subfloor and
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
4.1301.5e
Occupant education A dated receipt signed by the installer will be provided that includes:
Coverage area
Thickness
R-value Document job completion to contract specifications
Confirm amount of insulation installed
Comply with 16 CFR 460.17