4.1301.15a
Subfloor preparation Air sealing between conditioned space and unconditioned space will be completed before insulating
Ensure airtight floor assembly
4.1301.15b
Metal floor decks Bottom side of metal deck flutes will be sealed to the insulation material at every support beam joint
Top side of open metal deck flutes (e.g., flutes are not filled) will be sealed to the bottom of the floor deck at every perimeter support beam joint
Bottom flutes of metal decks will be totally insulated where they cross support beams from the beam to the exterior wall
Minimize air flow bypasses between insulation and metal deck subfloor
Minimize condensation on underside of metal floor deck
4.1301.15c
Installation Insulation will be installed to prescribed R-value
Insulation will be installed in contact with bottom of the floor decking without gaps, voids, compressions, misalignments, or wind intrusions
If vapor retarders are used, they will be installed consistent with local climate/code requirements
Provide effective R-value
Prevent potential fire chases
Prevent excessive vapor migration into the floor assembly and/or conditioned space
4.1301.15d
Installation of batts and support system Batts will be installed continuously between structural framing
Batts will be installed with a support system below the insulation
Support system will be mechanically fastened to the bottom side of the floor deck
Minimize convective loops
Prevent sagging
Minimize gaps and voids between the insulation and floor deck
4.1301.15e
Installation of rigid insulation and support system Rigid insulation will be installed continuously between structural framing
Rigid insulation will be installed with a support system below the insulation
Support system will be mechanically fastened to the bottom side of the floor deck
Where rigid foam plastics are used, in no case will the final thickness exceed the manufacturer's tested thickness used to determine the maximum 75 flame spread and 450 smoke-developed index when tested to
ASTM
ASTM
ASTM International, www.astm.org
E84 or
UL
UL
Underwriters Laboratories
723
Foam will be provided with ignition and thermal boundaries, as required by code
Minimize convective loops
Prevent sagging
Minimize gaps and voids between the insulation and floor deck
4.1301.15f
Installation of spray polyurethane foam (
SPF
SPF
Spray polyurethane foam
)
SPF
SPF
Spray polyurethane foam
will be applied continuously to bottom side of floor deck
Where rigid foam plastics are used, in no case will the final thickness exceed the manufacturer's tested thickness used to determine the maximum 75 flame spread and 450 smoke-developed index when tested to
ASTM
ASTM
ASTM International, www.astm.org
E84 or
UL
UL
Underwriters Laboratories
723
Foam will be provided with ignition and thermal boundaries, as required by code
Minimize convective loops
Minimize gaps and voids
4.1301.15g
Installation, if mechanicals are below the floor deck (applies to all insulation types) All plumbing and ductwork will be enclosed within the insulated space and will have sufficient insulation in contact with a continuous
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
on the exterior side
Prevent freezing of plumbing pipes
4.1301.15h
Property manager education A dated receipt signed by the installer will be provided that includes:
Coverage area
Thickness
R-value Document job completion to contract specifications
Confirm amount of insulation installed
Comply with 16 CFR 460.17