All combustion appliance flues will be terminated to the outdoors and terminations will maintain proper clearance above snow loads A distance no less than 2" will be maintained between any combustion appliance flue and combustible materials, unless zero clearance flue is in place All ventilation systems will maintain a continuous connection and terminate to the outdoors All broken mushroom vents will be replaced or removed and sealed All plumbing stacks will be terminated to the outdoors Non-
IC
IC
Insulation contact
rated light fixtures will be replaced with airtight
IC
IC
Insulation contact
-rated fixtures All recessed lights will be labeled as having an air leakage rate no more than 2.0
CFM
CFM
Cubic feet per minute
when tested in accordance with
ASTM
ASTM
ASTM International, www.astm.org
E 283 at a 75 pascals pressure differential All obvious ceiling penetrations will be sealed The space between combustion appliance flues and the ceiling will be sealed with fire-rated materials All roof, attic, and ceiling assemblies will be structurally sound; loose ceiling panels will be secured Temporary ceiling bracing will be recommended during the insulation installation process Dishing and pooling issues that allow standing water will be addressed All known roof water leaks will be repaired before insulation installation | Ensure occupant and worker safety Verify attic space is ready to insulate Ensure structural integrity of the roof and ceiling assembly Prevent intrusion of bulk moisture Prevent damage during the insulation installation process |