FavoritePlease sign in to add this to your favorites. Topic: Ducts Subtopic: Duct Preparation Desired Outcome: Ducts and plenums properly fastened to prevent leakage Manufactured HousingPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 3.1601.5a Preparation Surrounding insulation will be cleared to expose joints being sealed; salvage for reuse if possibleDuct surface to receive sealant will be cleaned Gain access while maintaining insulation valueAchieve proper adhesion for airtight seal when needed to ensure a tight fit to the framing structure and ensure the register can be removed and reinstalled by the dwelling occupant 3.1601.5b Metal to metal Ducts will be fastened with a minimum of three equally spaced screws Ensure durable joints 3.1601.5c Flex to metal Joints will be fastened with tie bands using a tie band Tie band A strap, often made of nylon, that mechanically squeezes a flexible duct to a fitting. Must have a minimum performance temperature rating of 165° (per UL 181A-type test) and a minimum tensile strength rating of 50 pounds tensioning toolFor oval flexible duct to metal connections, tie bands cannot be used; appropriate mechanical fastener will be usedAll connections, regardless of fastener, will be sealed Ensure durable joints 3.1601.5d Duct board to duct board Joints will be fastened with outward clinching (stitch) staples and c-channels if possible Ensure durable joints 3.1601.5e Duct board to flexible duct Metal take-off collar specifically designed for the thickness of the duct board will be usedAll finger tabs will be bent down securelyFinger tabs will be longer than the thickness of the duct board and the shank will not extend beyond the thickness of the duct boardThere will be an internal metal backer inside the duct board through which three evenly spaced screws can be secured; the metal backer will not interfere with air flow Ensure durable jointsPrevent the collar from moving into or out of the duct board or slipping 3.1601.5f Duct board plenum to air handler cabinet Flange/c-channel will be fastened with screws with the duct board installed between c-channel flangesDuct board plenum will be connected to air handler plenum with flexible duct in upflow units Ensure durable joints 3.1601.5g Boot to wood Predrill for screws or use ring shanked nails to fasten boot to wood Ensure durable joints 3.1601.5h Boot to gypsum If accessible, boot hanger will be fastened to adjacent framing with screws or nailsBoot will be connected to boot hanger with screwsIf inaccessible, boot will be fastened to gypsum with a durable, adhesive sealant Ensure durable joints 3.1601.5i Duct board to flex Metal take-off collar with a hip and an internal metal backer will be usedTake-offs will be in accordance code requirements Ensure durable joints Previous Detail Next Detail Back to 3.1601 Duct Preparation Back to Top