Monthly Generation System Peak (GSP) is the peak load (in MW) on the Federal System during a calendar month, determined by the largest hourly integrated demand produced from system generating plants in BPA's control area and scheduled imports for BPA's account from other control areas.

Effective with bills sent out November 1, 2001 (for the October 2001 billing period) for most customers, the GSP is the hour of the largest Heavy-Load Hour (HLH) output of the Federal System that occurs during the customer's billing period.  [See Item #19 on page 130 of the 2007 General Rate Schedule Provisions.]   However, the GSP for some Pre-Subscription customer bills will continue to be based on the Maximum (Max) Monthly GSP.

Typically the HLH GSP and the Max GSP occur at the same time during a month. Since they sometimes occur at different times, HLH GSP and Max GSP are provided in separate tables below.

 
 
Max GSP
(for most customer bills)
Preliminary - May Be Subject To Change
Billing Month Date Of Peak Hour of Peak Last Updated
May 2012 05-03-2012 21 06-01-2012
April 2012 04-26-2012 21 05-01-2012
March 2012 03-26-2012 8 05-01-2012
February 2012 02-29-2012 19 05-01-2012
January 2012 01-17-2012 18 05-01-2012
December 2011 12-20-2011 18 01-01-2012

HLH GSP
(for most customer bills)
Preliminary - May Be Subject To Change
Billing Month Date Of Peak Hour of Peak Last Updated
May 2012 05-03-2012 21 06-01-2012
April 2012 04-26-2012 21 05-01-2012
March 2012 03-26-2012 8 05-01-2012
February 2012 02-29-2012 19 05-01-2012
January 2012 01-17-2012 18 05-01-2012
December 2011 12-20-2011 18 01-01-2012

   

Page content last modified on:  June 01, 2012. Skip to start of content.  Access Key = C
Skip to short cut links below
Skip to start of content.  Access Key = C If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This server is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel.