- Reclamation
- Projects & Facilities
- Projects
- Missoula Valley Project
Missoula Valley Project
State: Montana
Region: Pacific Northwest
Related Documents
Missoula Valley Project History (34 KB)
Related Facilities
Related Links
Weather Conditions (NOAA)
Clark Fork above Missoula, Montana (USGS)
Spring and Summer (NRCS)
Columbia River Snowpack Summary
Palmer Drought Index Map
Explanation of Palmer Drought Severity Index (Text)
Bitterroot River near Missoula, Montana (USGS)
Middle Clark Fork
Big Flat Canal Headworks
Precipitation
Mountain Snowpack Maps for Columbia River Basin
General
The Big Flat Unit of the Missoula Valley Project is in west-central Montana about 7 miles west of the city of Missoula. The unit lands are parallel and adjacent to Clark Fork River, which is known locally as the Missoula River. The project furnishes irrigation water from the Bitterroot River for about 800 acres of land. The principal project feature is Big Flat Canal and headworks.
History
Irrigation has been practiced in the Missoula Valley since the founding of the city of Missoula in 1864. Many years ago, a canal diverted water from the south bank of the Clark Fork River, about 3 miles above the present dam of the Montana Power Company at Bonner. The canal followed down the south side of the canyon, and around the southeast corner of Missoula. When the Chicago, Milwaukee, St. Paul, and Pacific Railroad was built into the valley in 1909, this canal was purchased and the right-of-way was used for a roadbed. Another canal diverted from Rattlesnake Creek and crossed through the center of Missoula to irrigate the area west of the city. As the city grew, the canal had to be abandoned. Other canals diverted from Grant Creek and Butler Creek to irrigate parts of the valley; however, recent dry years and increased diversion of water from the headwaters has made use of these creeks impracticable for farming.
Construction
Construction of the project began on June 7, 1945, and was completed in 1949. Suburban development for rural homesites in the northern portion of the project area has increased in recent years. Subdividing is expected to continue. Hay, grain, and pasture are the principal crops within the irrigated areas. The Missoula Valley Project was the product of an era in which much of the hopes and dreams of America were pinned on its agricultural future. The vibrant, growing Missoula Valley of Montana, for example, surrounded as it was by a verdant, rolling landscape and snowmelt-swollen rivers, and possessing a beneficent climate (for Montana), saw in such natural gifts an asset of which they could - and should - take advantage. Many envisioned their landscape someday being irrigated in its entirety - a bountiful `hydraulic society` stretching from one end of their valley to the other that would have an intense, diverse, and high-value agriculture as its centerpiece. It is amidst such context in west-central Montana in the 1930s and 40s that a small, optimistic, and, perhaps, misplaced project such as the Big Flat Unit of the Missoula Valley Project was built. Such a vision of America and its future is largely obsolete these days, having inexorably departed from the beautiful Missoula Valley like the Montana streams that originate high up in the local peaks before inevitably draining off into a faraway ocean. The Missoula Valley Project and its neighboring Reclamation project in west-central Montana, Frenchtown, share locales on opposite banks of the Clark Fork River (also known locally as the Missoula River) just a few miles `as the crow flies` from each other in west-central Montana. Unlike Frenchtown, though, the Missoula Valley Project actually takes its water from the Bitterroot River, a Clark Fork tributary to the south of nearby Missoula, Montana. The Bitterroot is a large river with an average annual flow of 1.794 million cubic feet per second (cfs) and a drainage area of 2,950 square miles. The Clark Fork River is itself a major tributary of the Columbia River. The confluence of the Bitterroot and Clark Fork lies about five miles west of Missoula and about two miles upstream from project lands.(1) The sole feature of the Missoula Valley Project, the Big Flat Canal feeds project lands by gravity from the Bitterroot at a point about six miles west of the city of Missoula, running parallel to the Bitterroot and past its confluence with the Clark Fork for 9.3 miles to the 780 acres of project lands on the west and south side of the Clark Fork.(2) Located in the rain shadow of the Lolo Mountains which rise to the project lands` west, the Missoula area has a mild and dry climate for such a northern setting. Precipitation averages 14.5 inches a year and when combined with the agricultural lands` relatively low average elevation of just over 3,000 feet results in one of Montana`s longest growing seasons (142 days) and, at one time, its only commercial fruit crop. The area has become the trading center for the economy of four fertile river valleys - the Clark Fork, Bitterroot, Blackfeet (to the east), and Flathead (to the north).(3) The Bitterroot Valley to Missoula`s south was for centuries home to the Flathead, members of the Salish nation of the Pacific Northwest. Although many Native American tribes such as the Blackfeet and Shoshone migrated into the Montana area from points east and south after roughly 1600, the Flathead had long settled in the region, making intermittent hunting trips to the plains lands to the east to hunt buffalo. The Blackfeet, a fierce and hostile tribe, often laid in wait for the Flathead at nearby Hellgate Canyon just east of present-day Missoula, where the only trail from the Bitterroot Valley to the Great Plains hunting grounds often forced the Flathead into ambush at the hands of the Blackfeet.(4) When Lewis and Clark`s expedition passed through the area in the early 1800`s, they met Flathead Indians who were eager to be friends with the white man, for they hoped that forging such alliances might help protect them from the relentless attacks of the Blackfeet. Father Pierre Jean DeSmet, a Jesuit priest soon followed, hoping to convert and domesticize the friendly Indians by establishing the St. Mary`s Mission in the Bitterroot Valley at Stevensville in 1840. Here, the first attempt at agriculture in Montana also took place.(5) The 1850`s saw the initial work of the railroads and territorial government to survey and develop the area. The increase in commercial traffic also brought with it skirmishes with the Blackfeet. A reservation treaty was signed with local Indians in 1855 giving the Flathead, Blackfeet, and other tribes their own land upon which to live.(6) The Missoula County seat was moved to the newly-settled town of Missoula (1860) from neighboring Hellgate in 1861. Soon afterward the first irrigation water appropriation took place on Grant Creek, a tributary of the Bitterroot. While many simple gravity diversions from the numerous nearby streams were constructed by area farmers, most were forced to resort to dry farming techniques to grow low-value grains and wheat. The first large-scale attempt at water development occurred in 1880 when the Missoula Irrigation District was formed to construct the Orchard Homes Canal which diverted Bitterroot River flows onto about 2,000 acres of land south of Missoula. In between the future Missoula Valley Project`s Big Flat district to Missoula`s west and the city of Missoula itself was the Hellgate Valley Irrigation Company`s Flynn Ditch, built in 1902 to serve about 1900 acres with Clark Fork River water. By the World War I era, it was estimated that the Missoula vicinity had at least 13,000 acres of irrigated lands, but there were still additional suitable lands in the valley that residents were interested in irrigating. Since the region had ample water resources from which to draw, locals saw no reason why all viable lands could not be irrigated. Beginning in 1918, Reclamation officials and local consultants investigated the possibility of further irrigation in the Missoula Valley.(7) The majority of investigations in the Missoula Valley focused, at first, not on the Big Flat area, which was considered - ironic in light of its name - too difficult to water because of its slope, but on the fertile Frenchtown-Huson area to the north. There, a vocal and determined former politician with close political contacts, Edward Donlan, was able to push his water proposed development through to its fruition. Not until after the Frenchtown Project was authorized in 1934, was much notice given to the Missoula Valley farther upstream. Not until 1938, when the Montana State Water Conservation Board tried to interest the Bureau of Reclamation in developing additional systems in the area nearer Missoula was any substantive headway made with regard to the Big Flat district. Although the State Water Conservation Board envisioned a potentially vast Missoula Valley Project comprehensive plan featuring up to six major features, Reclamation believed only three merited further analysis: the North Side Low Level Pumping Plant, which was to serve 1,700 acres; the South Side Pumping Plant, planned to dispense water to 1,450 acres; and the Big Flat Gravity Canal, which would provide water for 1,000 acres.(8) The State Water Conservation Board requested that Reclamation study and, if possible, build the two pumping plants and Big Flat Canal as soon as possible. Additional local support for construction of the three features came from local Missoula Valley residents, the Missoula Chamber of Commerce, and the Missoula Mercantile Company. Local lawyer, George Shepard also pointed out that such a federal reclamation project would make irrigated farms more affordable than the current $250 to $600 per acre for watered land.(9) But a few obstacles stood in the way of Federal authorization of the project as it stood. Since construction of the planned South Side Unit entailed the use and enlargement of the Orchard Homes Ditch, approval would be required by the Missoula Valley Irrigation District that owned and operated the ditch. The irrigation district believed that such a project would result in additional costs to them so they refused to grant permission. Reclamation engineer Frank Munro believed the district`s refusal rendered the South Side Unit unfeasible since condemnation procedures would make overall projects costs prohibitive.(10) There was also the question of how the Missoula Valley Project would be paid for. With the onset of World War II, the Farm Security Administration gave some thought to approving the project by including it under the Food for Victory program, but area lands did not qualify for these funds at that point in time.(11) Eventually it was the rolling nature of the Big Flat lands that would suggest a method of repayment for the project`s construction. Studies indicated lands there were generally of a Category 2 and 3 nature with regards to irrigation potential with extensive leveling necessary on 800 acres in order for it to be effectively irrigated. Project proponents noted that if this was indeed the case, funds for grading and leveling could be provided by the Soil Conservation Service under the Case-Wheeler Bill, a bill passed by Congress early in 1944 that provided for the leveling of land to produce food for the war effort. Still, the Big Flat needed to be watered somehow. The answer lay in the Water Conservation and Utilization Act of 1939 which had been amended in 1943 and for which irrigation projects such as the Big Flat Unit of the Missoula Valley Project might qualify. Since the only feasible unit of the Missoula Valley Project at this point was the Big Flat Canal and it did not qualify for funds under any other Reclamation Acts, Reclamation officials were forced to seek authorization for the Big Flat Canal construction under the Water Conservation Act. President Roosevelt agreed, authorizing the building of solely the Big Flat Unit for $45,000 on May 10, 1944. The Big Flat Irrigation Unit was formed in July, 1944, in order to provide for the irrigation project`s repayment but, due to wartime, did not sign a contract with Reclamation until April, 1945.(12) Construction Engineer, C.R. Whipple was appointed general supervisor of the Missoula Valley Project by Reclamation. Development of the Big Flat Unit of the Missoula Valley Project consisted, first, of the land leveling phase conducted by farmers under the guidance of the Soil Conservation Service. Next, construction crews were to excavate the canal and place project works such as turnouts, laterals, and headgates. A siphon, a small spillway (in case breaks developed water could be diverted back into the river), a bench flume of 5800 feet built along the steep hillsides, and a wasteway were also planned for the Big Flat irrigation system. In anticipation of the award of the Big Flat Canal excavation contract, Otis Williams and Company of Helena, Montana, had from June to September of 1945 actually commenced digging the ditch without having received either an award letter or notice to proceed. The contractor had completed nearly half of the 9.3 miles of main canal, as well as much of the lateral system by the time it was officially awarded the job in April, 1946. A construction deadline of October 12, 1946, was set. It appeared that this date would easily be met, for by mid-May, 1946, nearly all excavation work had been completed.(13) Unfortunately, this would not prove to be the case. The delay in awarding the canal contract and a lack of labor prevented the project from being completed in a timely manner. The bench flume needed to deliver water to some project areas required reinforced steel material which, as it turned out, was extremely difficult to acquire in the post-war year of 1946. This fact was even more frustratingly apparent when the delay in awarding the canal contract had resulted in the expiration of the acceptance time for bids for steel which had gone out the past summer, in June, 1945. Since the contractor was incapable of placing the steel and forms for the flume, it shut down operations. It was not until August, 1946, that the first of the necessary steel was delivered, it actually being in the form of 3 inch x 3 inch welded wire airplane landing mat which the contractor substituted for the normal steel until it arrived in October.(14) Having shut down operations in May due to the delay, Otis Williams and Company`s employees went elsewhere for work in the meantime. Most found it at a large veteran`s housing project being built in Missoula. It was difficult to persuade these workers to return to the project when the job resumed so the contractor`s crew was short-handed the balance of the year. The only substantial work done was the concrete pouring of the bench flume which Williams subcontracted to Askevold Construction Company. They completed the flume in November, 1946.(15) A continued scarcity of laborers, high spring run-off, and a lack of lumber were additional difficulties encountered in 1947. By September, 1947, area farmers grew increasingly anxious. For two years now they had been without crops because of land leveling and interest was due for the money spent thus far on the project. So when it appeared that the canal was finished and that water could be made available - even at the late date in the year - locals were eager for the prospect of it. Unfortunately, much of the canal had been dug for two years at this point and many rodents had taken the opportunity to burrow into banks. Consequently, when Bitterroot River water filled the canal numerous breaks and seepage appeared. Before the year was over, more than 8,000 feet of canal in 28 different places was lined with clay and bentonite to prevent further deterioration of canal banks.(16) Upon its completion, the 9.3 mile Big Flat Canal had a capacity of 25 cu-ft-sec, a bottom width ranging from four to five feet, and a depth of 2.2 feet.(17)
Plan
Water is diverted from the Bitterroot River at a point 5 miles southwest of Missoula into the Big Flat Canal, which conveys the water to the project lands. The canal headworks are located on the canal about 488 feet below the point of diversion. The Big Flat Canal is 9.3 miles long and extends about 5 miles to the upper end of the irrigable area and about 4 miles within the irrigable area. One mile of concrete bench flume has been constructed on the upper 5 miles of the canal. The canal has an initial capacity of 39 cubic feet per second to the headworks and 25 cubic feet per second below the headworks. Two miles of laterals complete the distribution system. The Big Flat Irrigation District operates and maintains the project.
Contact
Contact
Title: Public Affairs OfficerOrganization: Commissioner`s Office
Address: 1849 C Street NW
City: Washington, DC 20240
Fax: 202-513-0575
Phone: 202-513-0305
Contact
Title: Area Office ManagerOrganization: Columbia-Cascades Area Office
Address: 1917 Marsh Road
City: Yakima, WA 98901-2058
Fax: 509-454-5611
Phone: 509-575-5848-x202
Contact
Title: Public Affairs OfficerOrganization: Pacific Northwest Regional Office
Address: 1150 N Curtis Road, Suite 100
City: Boise, ID 83706-1234
Fax: 208-378-5019
Phone: 208-378-5020