ADB-05-02
  • Article
Apr 6, 2005
Hide Related Links »
« Show Related Links

Pipeline Safety: Strapping Table Calibration for Pipeline Breakout Tank Operators

SUMMARY: This advisory notice alerts pipeline operators of all hazardous liquid pipeline facility systems about the need to validate the accuracy of breakout tank strapping tables. Under certain circumstances, strapping table errors can potentially lead to dangerous conditions.

View/Print Public Comments submitted to the Federal Document Management System from the link to the right. NOTE: search for comments using the entire FR number (for example "72 FR 71735"). Not all items will have submitted public comments.