This Community can only improve through your valued input - provide yours today!
                                                                                                            Click Here for SharePoint 2013 Migration Information and News
Click here   image of a classical greek architecture representing DAU's strength as a business university instructing in DoD Acquisition
HomeContactAbout ACCPrivacyTutorialDoD CertificateReport an Issue  
.

USD AT&L Policy Memo "Strengthened Sustainment Governance for Acquisition Program Reviews" ("Sustainment Quad Chart") - DTD 5 Apr 10

Regulatory
3
Helpful Votes
Long Description

As part of the Department’s continuing effort to improve program life cycle management, the April 2010 memo was intended to "strengthen sustainment governance by conducting detailed reviews of key elements of sustainment planning for all ACAT ID weapons system programs at decision and other review points in the acquisition process.  Increasing visibility of sustainment factors is vital to ensuring we deliver a program that meets Warfighter materiel readiness objectives with long-term affordability consideration. To facilitate a comprehensive review and provide the required information in a standardized format, program managers are to use the sustainment quad chart (contained in the memo) to report the status of sustainment planning at OIPT and Defense Acquisition Board reviews. Reporting begins at program initiation and continues through each subsequent milestone, the production decision, and at other reviews when directed." The "Sustainment Quad Chart" format was tweaked by OSD in October 2013, and the updated template along with an updated October 2013 "Sustainment Quad Chart Instruction" from OSD to assist in using this template are attached below. Changes from the original 2010 version include:

  • Top Right Quadrant: "Materiel Reliability" was changed to "Reliability"
  • Top Right Quadrant: "Ownership Cost: was changed to "Operating & Support Cost"
  • Top Right Quadrant: New "Demonstrated Performance" column was added
  • Bottom Right Quadrant: O&S Data "Cost based on average annual cost per squadron" changed to "Cost based on average annual per system in BY$K"
  • Bottom Right Quadrant:: O&S Data in "Total O&S Costs" section listed in $M
File Title
USD AT&L April 2010 Policy Memo "Strengthened Sustainment Governance for Acquisition Program Reviews", Quad Chart Template & Instructions
File
Benefit/Value

Increasing visibility of sustainment factors is vital to ensuring DoD delivers a program that meets Warfighter materiel readiness objectives while achieving long-term affordability requirements.

Keywords
sustainment, governance

Page Information

Popularity of this page:
#125 of 1526 items
3 Helpful votes
At this page:
21056 Page Views 0 Pages Emailed
9 Meta-card Views 10405 Attachments Downloaded
1 Relationships and Highlights 0 Videos Downloaded
ID360876
Date CreatedThursday, April 8, 2010 2:33 PM
Date ModifiedThursday, May 15, 2014 9:35 AM
Version Comment:

REQUEST AN ACCOUNT Benefits of Membership I Forgot My Login Information
ACC Practice Center Version 3.2
  • Application Build 3.2.9
  • Database Version 3.2.9