4.2.15. Production Readiness Review

4.2.15. Production Readiness Review

The Production Readiness Review (PRR) for the system determines whether the system design is ready for production, and whether the developer has accomplished adequate production planning for entering Low-Rate Initial Production (LRIP) and Full-Rate Production (FRP). Production readiness increases over time with incremental assessments accomplished at various points in the life cycle of a program.

In the early stages, production readiness assessments should focus on high-level manufacturing concerns such as the need for identifying high-risk and low-yield manufacturing processes or materials, or the requirement for manufacturing development efforts to satisfy design requirements. As the system design matures, the assessments should focus on adequate production planning, facilities allocation, producibility changes, identification and fabrication of tools and test equipment, and long-lead items. The system PRR, held prior to Milestone C, should provide evidence that the system can be produced with low risk and no breaches in cost, schedule, and performance thresholds. See also the System Capability and Manufacturing Process Demonstration described in DoDI 5000.02 Enclosure 2 paragraph 6.c.(6)(d).

For complex systems, a PRR may be conducted for one or more system elements. In addition, periodic production readiness assessments should be conducted during the Engineering and Manufacturing Development phase to identify and mitigate risks as the design progresses. The incremental reviews lead to an overall system PRR. See DAG section 4.2.8. Technical Reviews and Audits Overview for more on this incremental approach.

Roles and Responsibilities

The unique Program Manager responsibilities associated with a system PRR include:

  • Approve, fund, and staff the PRR as planned in the Systems Engineering Plan (SEP) developed by the Systems Engineer
  • Establish the plan to Physical Configuration Audit (PCA) in applicable contract documents including the SE Management Plan (SEMP), Integrated Master Schedule (IMS), and Integrated Master Plan (IMP)
  • Ensure the plan includes independent subject matter experts to participate in each review
  • Determine if the readiness of manufacturing processes, quality management system, and production planning (i.e., facilities, tooling and test equipment capacity, personnel development and certification, process documentation, inventory management, supplier management, etc.) provide low-risk assurances for supporting LRIP and FRP
  • Continue to control Class I changes to the system product baseline (see DAG section 4.3.7. Configuration Management Process)

The unique Systems Engineer responsibilities associated with a system PRR include:

  • Develop and execute the PRR plans with established quantifiable review criteria, carefully tailored to satisfy program objectives
  • Ensure that the pre-established review criteria have been met to ensure the production capability forms a satisfactory, affordable, and sustainable basis for proceeding into LRIP and FRP
  • Advise the Program Manager on whether production capability forms a satisfactory, affordable, and sustainable basis for proceeding into LRIP and FRP
  • Ensure adequate plans and resources are in place to proceed from PRR to PCA and FRP Decision Review (DR)
  • Ensure plans to proceed to PCA and FRP DR allow for contingencies
  • Ensure production implementation supports overall performance and maintainability requirements
  • Monitor and control the execution of the PRR closure plans

Inputs and Review Criteria

Figure 4.2.15.F1 provides the end-to-end perspective and the integration of SE technical reviews and audits across the acquisition life cycle.

Figure 4.2.15.F1. Weapon System Development Life Cycle

Figure 4.2.15.F1 Weapon System Development Life Cycle

The PRR criteria are developed to best support the program’s technical scope and risk and are documented in the program’s SEP no later than Milestone B. Table 4.2.15.T1 defines the suggested PRR products and associated review criteria. The review should not begin until these criteria are considered met and any prior technical review is completed and its action items closed. A readiness assessment tool for PRR preparation is the DoD PRR Checklist. This is a best practice review.

Table 4.2.15.T1. PRR Products and Criteria

Product

PRR Criteria

Cost Estimate

  • System, as designed, is producible within the production budget
  • Production cost model is based on the stable detailed design and supply chain, and has been validated

Risk Assessment

  • Producibility trade studies and risk assessments are completed
  • Manufacturing, production, and quality risks are identified, and a mitigation plan exists to mitigate those risk(s)
  • Environment, Safety, and Occupational Health (ESOH) risks are known and mitigated

System Baseline Documentation (Product)

  • System product baseline is stable and under proper configuration control to enable hardware fabrication in low-rate production
  • Technologies are mature and proven in the final form, in operational environments
  • Manufacturing processes are stable and have been demonstrated in a pilot line environment
  • Adequate production line processes and metrics are in place for the delivery of on-time, quality products

Technical Plans

  • Prior readiness reviews are completed and action items closed
  • Supply chain is stable and adequate to support planned LRIP and FRP
  • Program is properly staffed with qualified production, quality (engineering and assurance), and manufacturing personnel
  • Product acceptance system, including acceptance test procedures and associated equipment, has been validated and put under configuration control
  • Production facilities are ready and required personnel are trained
  • Delivery schedule is executable (technical/cost risks, long lead items)
  • Diminishing Manufacturing Sources and Material Shortages (DMSMS) plan is in place and mitigates the risk of obsolescence during LRIP and FRP

A follow-on PRR may be appropriate in the Production and Deployment (PD) phase for the prime contractor and major subcontractors if:

  • Changes (from the Engineering and Manufacturing Development (EMD) phase system design) in materials and/or manufacturing processes are required when entering or during the Production and Deployment (P&D) phase
  • Production start-up or re-start occurs after a significant shutdown period
  • Production start-up is with a new contractor
  • The manufacturing site is relocated

The PRR is designed as a system-level preparation tool and should be used for assessing risk as the system transitions from development to FRP. For more information see the approaches described in DAG section 4.3.18.18. Producibility, Quality, and Manufacturing Readiness.

Outputs and Products

The Technical Review Chair determines when the review is complete. Results of the PRR and associated manufacturing readiness assessments are typically documented in a written report or out-brief. The results should be reported based on the criteria documented in the SEP, using the PRR checklist. Another source of information is the Manufacturing Readiness Level Deskbook to be used as appropriate.

Previous and Next Page arrows

Previous Page Next Page

List of All Contributions at This Location

No items found.

Popular Tags

Browse

https://acc.dau.mil/UI/img/bo/minus.gifWelcome to the Defense Acquisition...
https://acc.dau.mil/UI/img/bo/plus.gifForeword
https://acc.dau.mil/UI/img/bo/plus.gifChapter 1 -- Department of Defense...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 2 -- Program Strategies
https://acc.dau.mil/UI/img/bo/plus.gif2.0 Overview
https://acc.dau.mil/UI/img/bo/plus.gif2.1. Program Strategies—General
https://acc.dau.mil/UI/img/bo/plus.gif2.2. Program Strategy Document...
https://acc.dau.mil/UI/img/bo/plus.gif2.3. Program Strategy Relationship to...
https://acc.dau.mil/UI/img/bo/plus.gif2.4. Relationship to Request for...
https://acc.dau.mil/UI/img/bo/plus.gif2.5. Program Strategy Classification...
https://acc.dau.mil/UI/img/bo/plus.gif2.6. Program Strategy Document Approval...
https://acc.dau.mil/UI/img/bo/plus.gif2.7. Acquisition Strategy versus...
https://acc.dau.mil/UI/img/bo/plus.gif2.8. Technology Development...
https://acc.dau.mil/UI/img/bo/plus.gifChapter 3 -- Affordability and...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 4 -- Systems Engineering
https://acc.dau.mil/UI/img/bo/minus.gif4.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif4.1. Introduction
https://acc.dau.mil/UI/img/bo/minus.gif4.2. Systems Engineering Activities in...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.1. Life-Cycle Expectations
https://acc.dau.mil/UI/img/bo/plus.gif4.2.2. Pre-Materiel Development Decision
https://acc.dau.mil/UI/img/bo/plus.gif4.2.3. Materiel Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.4. Technology Development Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.5. Engineering and Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.6. Production and Deployment Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.7. Operations and Support Phase
https://acc.dau.mil/UI/img/bo/plus.gif4.2.8. Technical Reviews and Audits...
https://acc.dau.mil/UI/img/bo/plus.gif4.2.9. Alternative Systems Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.10. System Requirements Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.11. System Functional Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.12. Preliminary Design Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.13. Critical Design Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.14. System Verification...
https://acc.dau.mil/UI/img/bo/minus.gif4.2.15. Production Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gif4.2.16. Physical Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gif4.2.17. In-Service Review
https://acc.dau.mil/UI/img/bo/minus.gif4.3. Systems Engineering Processes
https://acc.dau.mil/UI/img/bo/plus.gif4.3.2. Technical Planning Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.3. Decision Analysis Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.4. Technical Assessment Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.5. Requirements Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.6. Risk Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.7. Configuration Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.8. Technical Data Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.9. Interface Management Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.10. Stakeholder Requirements...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.11. Requirements Analysis Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.12. Architecture Design Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.13. Implementation Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.14. Integration Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.15. Verification Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.16. Validation Process
https://acc.dau.mil/UI/img/bo/plus.gif4.3.17. Transition Process
https://acc.dau.mil/UI/img/bo/minus.gif4.3.18. Design Considerations
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.1. Accessibility (Section 508...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.2. Affordability – Systems...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.3. Anti-Counterfeiting
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.4. Commercial-Off-the-Shelf
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.5. Corrosion Prevention and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.6. Critical Safety Item
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.7. Demilitarization and Disposal
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.8. Diminishing Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.9. Environment Safety and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.10. Human Systems Integration
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.11. Insensitive Munitions
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.12. Intelligence (Life-Cycle...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.13. Interoperability and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.14. Item Unique Identification
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.15. Open Systems Architecture
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.16. Operational Energy
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.17. Packaging Handling Storage...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.18. Producibility Quality and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.19. Reliability and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.20. Spectrum Management
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.21. Standardization
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.22. Supportability
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.23. Survivability and...
https://acc.dau.mil/UI/img/bo/plus.gif4.3.18.24. System Security Engineering
https://acc.dau.mil/UI/img/bo/plus.gif4.3.19. Tools Techniques and Lessons...
https://acc.dau.mil/UI/img/bo/plus.gifChapter 5 -- Life-Cycle Logistics
https://acc.dau.mil/UI/img/bo/minus.gifChapter 6 -- Human Systems Integration...
https://acc.dau.mil/UI/img/bo/plus.gif6.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif6.1. Total System Approach
https://acc.dau.mil/UI/img/bo/plus.gif6.2 HSI - Integration Focus
https://acc.dau.mil/UI/img/bo/plus.gif6.3. Human Systems Integration Domains
https://acc.dau.mil/UI/img/bo/plus.gif6.4. Human Systems Integration (HSI)...
https://acc.dau.mil/UI/img/bo/plus.gif6.5. Manpower Estimates
https://acc.dau.mil/UI/img/bo/plus.gif6.6. Additional References
https://acc.dau.mil/UI/img/bo/minus.gifChapter 7 -- Acquiring Information...
https://acc.dau.mil/UI/img/bo/plus.gif7.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif7.1. Introduction
https://acc.dau.mil/UI/img/bo/plus.gif7.2. DoD Information Enterprise
https://acc.dau.mil/UI/img/bo/plus.gif7.3. Interoperability and Supportability...
https://acc.dau.mil/UI/img/bo/plus.gif7.4. Sharing Data, Information, and...
https://acc.dau.mil/UI/img/bo/plus.gif7.5. Information Assurance (IA)
https://acc.dau.mil/UI/img/bo/plus.gif7.6. Electromagnetic Spectrum
https://acc.dau.mil/UI/img/bo/plus.gif7.7. Accessibility of Electronic and...
https://acc.dau.mil/UI/img/bo/plus.gif7.8. The Clinger-Cohen Act (CCA) --...
https://acc.dau.mil/UI/img/bo/plus.gif7.9. Post-Implementation Review (PIR)
https://acc.dau.mil/UI/img/bo/plus.gif7.10. Commercial Off-the-Shelf (COTS)...
https://acc.dau.mil/UI/img/bo/plus.gif7.11. Space Mission Architectures
https://acc.dau.mil/UI/img/bo/minus.gifChapter 8 -- Intelligence Analysis...
https://acc.dau.mil/UI/img/bo/plus.gif8.0. Introduction
https://acc.dau.mil/UI/img/bo/plus.gif8.1. Threat Intelligence Support
https://acc.dau.mil/UI/img/bo/plus.gif8.2. Signature and other Intelligence...
https://acc.dau.mil/UI/img/bo/plus.gif8.3. Support to the Intelligence...
https://acc.dau.mil/UI/img/bo/plus.gifChapter 9 -- Test and Evaluation (T&E)
https://acc.dau.mil/UI/img/bo/minus.gifChapter 10 -- Decisions Assessments and...
https://acc.dau.mil/UI/img/bo/plus.gif10.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif10.1. Decision Points
https://acc.dau.mil/UI/img/bo/plus.gif10.2. Executive Review Forums
https://acc.dau.mil/UI/img/bo/plus.gif10.3. Integrated Product and Process...
https://acc.dau.mil/UI/img/bo/plus.gif10.4. Role of Exit Criteria
https://acc.dau.mil/UI/img/bo/plus.gif10.5. Role of Independent Assessments
https://acc.dau.mil/UI/img/bo/plus.gif10.5.3. Preliminary Design Review (PDR)...
https://acc.dau.mil/UI/img/bo/plus.gif10.6. Information Sharing and DoD...
https://acc.dau.mil/UI/img/bo/plus.gif10.7. Management Control
https://acc.dau.mil/UI/img/bo/plus.gif10.8. Program Plans
https://acc.dau.mil/UI/img/bo/plus.gif10.9. Acquisition Program Baseline (APB)
https://acc.dau.mil/UI/img/bo/plus.gif10.10. Periodic Reports
https://acc.dau.mil/UI/img/bo/plus.gif10.11. Major Automated Information...
https://acc.dau.mil/UI/img/bo/plus.gif10.12. Defense Acquisition Executive...
https://acc.dau.mil/UI/img/bo/plus.gif10.13. Acquisition Visibility
https://acc.dau.mil/UI/img/bo/plus.gif10.14. Special Interest Programs
https://acc.dau.mil/UI/img/bo/plus.gif10.15. Relationship of Affordability and...
https://acc.dau.mil/UI/img/bo/plus.gif10.16. Acquisition Program Transition...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 11 -- Program Management...
https://acc.dau.mil/UI/img/bo/plus.gif11.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif11.1. Joint Programs
https://acc.dau.mil/UI/img/bo/plus.gif11.2. International Programs
https://acc.dau.mil/UI/img/bo/plus.gif11.3. Integrated Program Management
https://acc.dau.mil/UI/img/bo/plus.gif11.4. Knowledge-Based Acquisition
https://acc.dau.mil/UI/img/bo/plus.gif11.5. Technical Representatives at...
https://acc.dau.mil/UI/img/bo/plus.gif11.6. Contractor Councils
https://acc.dau.mil/UI/img/bo/plus.gif11.7 Property
https://acc.dau.mil/UI/img/bo/plus.gif11.8. Modeling and Simulation (M&S)...
https://acc.dau.mil/UI/img/bo/minus.gifChapter 12 - Defense Business System...
https://acc.dau.mil/UI/img/bo/plus.gif12.0 Overview
https://acc.dau.mil/UI/img/bo/plus.gif12.1 Business Capability Definition...
https://acc.dau.mil/UI/img/bo/plus.gif12.2 Investment Management (IM) Phase
https://acc.dau.mil/UI/img/bo/plus.gif12.3 Execution
https://acc.dau.mil/UI/img/bo/plus.gif12.4 DBS-specific Criteria
https://acc.dau.mil/UI/img/bo/plus.gif12.5 Tools and Methods
https://acc.dau.mil/UI/img/bo/plus.gifChapter 13 -- Program Protection
https://acc.dau.mil/UI/img/bo/minus.gifChapter 14 -- Acquisition of Services
https://acc.dau.mil/UI/img/bo/plus.gif14.0. Overview
https://acc.dau.mil/UI/img/bo/plus.gif14.1. Introduction to the Acquisition of...
https://acc.dau.mil/UI/img/bo/plus.gif14.2. The Planning Phase
https://acc.dau.mil/UI/img/bo/plus.gif14.3. The Development Phase
https://acc.dau.mil/UI/img/bo/plus.gif14.4. The Execution Phase
https://acc.dau.mil/UI/img/bo/plus.gifAppendix A -- REQUIREMENTS ROADMAP...
https://acc.dau.mil/UI/img/bo/plus.gifAppendix B -- SERVICE ACQUISITION...
https://acc.dau.mil/UI/img/bo/plus.gifAppendix C -- SERVICE ACQUISITION MALL...
https://acc.dau.mil/UI/img/bo/plus.gifAppendix D -- MARKET RESEARCH RESOURCES
https://acc.dau.mil/UI/img/bo/plus.gifAppendix E -- GLOSSARY
https://acc.dau.mil/UI/img/bo/plus.gifDoD Directive 5000.01
https://acc.dau.mil/UI/img/bo/minus.gifDoD Instruction 5000.02
https://acc.dau.mil/UI/img/bo/plus.gifTABLE OF CONTENTS
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 1 -- References
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 2 -- Procedures
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 3 -- Acquisition Category...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 4 -- Statutory and Regulatory...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 5 -- IT Considerations
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 6 -- Integrated T&E
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 7 -- Resource Estimation
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 8 -- Human Systems Integration...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 9 -- Acquisition of Services
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 10 -- Program Management
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 11 -- Management of Defense...
https://acc.dau.mil/UI/img/bo/plus.gifEnclosure 12 -- Systems Engineering
https://acc.dau.mil/UI/img/bo/plus.gifRecent Policy and Guidance
https://acc.dau.mil/UI/img/bo/plus.gifCurrent JCIDS Manual and CJCSI 3170.01 I
https://acc.dau.mil/UI/img/bo/plus.gifDefense Acquisition Guidebook Key...
ACC Practice Center Version 3.2
  • Application Build 3.2.9
  • Database Version 3.2.9