SD |
Development of a Highway ROW Inventory Asset Database (Phase 2) |
$ 100,000 |
RI |
Adaptive Signal Control |
$ 100,000 |
KS |
- Customization of AASHTO's Bridge Management (BrM) software program for a Kansas specific web based platform ($60,000)
- Development of cross section templates to advance 3D models for roadway design projects ($40,000)
|
$ 100,000 |
DE |
- Scanning tour to evaluate the various software packages for e-Construction ($7,400)
- Advancement of Intelligent Compaction/Continuous Compaction Control technologies ($32,940)
- Development of the Delaware Watershed Resources Registry ($48,888)
|
$ 89,228 |
OH |
- Combining 3D modeling with a construction project's Critical Path Method schedule ($37,080)
- Implementation of Mobile Inspector into SiteManager for Project Inspectors ($62,920)
|
$ 100,000 |
GA |
Development of a curve identification tool for selecting High Friction Surface Treatment sites |
$ 100,000 |
ND |
Implementation of e-Construction through the expanded use of mobile devices for field personnel |
$ 100,000 |
WI |
Development of a Local Public Agency guidance manual |
$ 100,000 |
AZ |
- 2015 Innovation Exchange Campaign ($25,000)
- Regional and Local Arizona Traffic Incident Management Training ($25,000)
- Development of GRS-IBS Specifications ($20,000)
- Advance Intelligent Compaction ($30,000)
|
$ 100,000 |
ME |
- Advancement of Prefabricated Full-depth Precast Concrete Deck Panels with Ultra-high Performance Concrete (UHPC) Connections ($49,680)
- Development of an environmental compliance/commitments database ($32,000)
- Development of a bat MEGIS data layer to help Maine DOT screen projects for both state and federal endangered species impacts ($16,000)
|
$ 97,680 |
MO |
- Development of specifications for electronic deliverables and specifications for the use of 3D models in inspection and administration ($92,980)
- Smarter Work Zone Peer Exchange/Scan Tour of Michigan and Iowa ($7,020)
|
$ 100,000 |
NJ |
- Advancement of Data Driven Safety Analysis ($41,600)
- Advancing the use of mobile devices in the administration and oversight of the Local Public Agencies program ($21,464)
|
$ 63,064 |
MS |
Advancing the Implementing Quality Environmental Documentation principles into MDOT's Environmental Manual |
$ 80,000 |
MT |
Development and execution of a Design Workflow Study & 3D Model Centric Implementation Plan to transition from a 2D paper plan workflow to 3D model workflow |
$ 80,000 |
WY |
Expand the deployment of technology associated with the Road Condition Reporting mobile app |
$ 100,000 |
TN |
Development of an Advanced Traffic Incident Management Training Curriculum |
$ 100,000 |
MI |
Development of a comprehensive set of data collection standards and other informational materials to continue advancing Geospatial Utility Infrastructure Data Exchange (GUIDE) |
$ 100,000 |
FLH |
Advancement of Internally Cured Concrete |
$ 100,000 |
MN |
Development of procedures for the use and placement of Downstream Speed Notification Signs and the associated monitoring equipment on urban freeway and interstate projects |
$ 100,000 |
MA |
- Host three (3) Smarter Work Zone workshops ($24,000)
- Develop Massachusetts Road Diet policies and performance measures ($76,000)
|
$ 100,000 |
AR |
Development of a Local Public Agencies Manual that prescribes policies and procedures to be used for the development of federal aid projects in the State of Arkansas |
$ 100,000 |
NH |
- Implementation of e-Construction through the expanded use of mobile devices ($84,000)
- Development of a Design-Build guidance document ($16,000)
|
$ 100,000 |
NV |
Development of statewide mapping and computer-aided design and drafting (CADD) standards and source files for 3D design workflows |
$ 100,000 |
FL |
Development and deployment of the Safe Accessible Pedestrian Facilities Inventory Model (SAPFIM), a GIS-based, hand held tool that allows for the collection of pedestrian facility data to assess safety and accessibility |
$ 100,000 |
OK |
Development of standard drawings for low-cost bridge options for use by Local Public Agencies (LPAs) on low-volume locally owned roads |
$ 100,000 |
VA |
Incorporation of a web-based data integration system into VDOT’s Project Document Management System (PDMS) to enhance system usability, minimize manual input redundancy, and increase user adoption
|
$ 100,000 |
UT |
Development of a guidance document for advertising 3D Engineered Models for Construction as the legal document
|
$ 100,000 |
IA |
- Development and delivery of technical guidance and training on the implementation of a self-cleaning culvert technology ($64,000)
- Expand the use of mobile devices for e-Construction in field inspection applications ($36,000)
|
$ 100,000 |
IL |
Development of 3D civil cell libraries and training to advance 3D modeling |
$60,000 |
LA |
Completion of the Construction Manager at Risk manual including rollout with Stakeholders |
$ 100,000 |
MD |
Hosting a Traffic Incident Management Conference to expand the depth and breadth of first responders training |
$ 28,800 |
ID |
Hosting a demonstration workshop on Geosynthetic Reinforced Soil –
Integrated Bridge System bridge construction for statewide participation by local agencies |
$84,500 |
CO |
- Development of a decision matrix for when to use cold in-place recycling of asphalt pavement ($21,000)
- Development of a Contract Time Estimation tool to improve the accuracy and consistency of estimating construction contract time ($15,000)
- Implementation of a Cloud-based Learning and Event Management System by the Colorado Local Technical Assistance Program ($15,000)
|
$ 51,000 |
NC |
Development of deep compaction grouting specifications and technology to stabilize settling bridge approach slabs |
$75,000 |
AL |
Development of specifications and best practices for the use of Queue Warning Systems on ALDOT Construction Projects |
$100,000 |
CT |
Advancing the use of mobile devices for e-Construction in field inspection applications |
$100,000 |
KY |
Development and execution of an e-Construction implementation plan |
$100,000 |
NY |
- Conduct a TIM Peer Exchange for sharing of best practices from within and outside NYS ($48,000)
- Conduct additional Traffic Incident Management training ($52,000)
|
$100,000 |
OR |
Development an accreditation guidance for a Stormwater Technology Testing Center |
$100,000 |
PA |
Development and deployment of a Salt and Snow Academy to train local governments with the most up to date and most cost effective methods for winter maintenance |
$80,000 |
PR |
Development of standard drawings, guidelines, and technical specifications for the EDC innovations adopted in Puerto Rico |
$100,000 |
SC |
Development and delivery of training on 3D Engineered Models in roadway design, storm sewer and subsurface utility engineering design, and quality assurance inspection on projects with electronic engineering data and 3D models |
$100,000 |
USVI |
Advancement of Adaptive Signal Control |
$100,000 |
VT |
- Training in Lean methodologies in support of an innovative Continuous Improvement initiative VTrans ($50,000)
- Conduct Innovation peer exchange scan tours including documentation and development of implementation plans ($50,000)
|
$100,000 |
WA |
Development of a Programmatic Biological Opinion for Bull Trout |
$100,000 |