Community Member
Member since
0 ideas posted
1 comment 67 votes
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Memberships [ 1 ] [+]
Activity Stream [+]
Ideas Contributed [ 2 ] [+]
Campaign: Flood Mapping, Risk MAP Products, & Risk Assessments
Beef up CTP program
Identify entities that have the necessary capabilities and enlist them as CTPs; and empower them to do as many of the Risk MAP activities as they can.
Voting
Campaign: Flood Mapping, Risk MAP Products, & Risk Assessments
Get rid of paper maps
Preparing paper maps that are slaves to FIRM panel boundaries is a large cost in both initial map preparation and in preparing LOMR exhibits. Get rid of paper panels and use the savings in other areas such as modernizing more paper maps or more community engagement. There are some areas of the country that cannot go all electronic but there must be ways to address their needs without letting them drive the entire program ...more »