AL |
Improvements to the US 280 Corridor from Hollywood Blvd. to Doug Baker Blvd. in Birmingham, Alabama |
Safety: Adaptive Signal Control |
AZ |
Reconstruction of SR 179 in Sedona |
Contracting: Needs-Based Involvement Process |
AR |
The Use of Roller Compacted Concrete to Reconstruct a Segment of SH 213 in Fayetteville |
Pavement: Roller Compacted Concrete (RCC) |
CA |
California Demonstration Project: Safety Improvements on Mountain Ranch Road in Calaveras County |
Safety: Safety EdgeSM, Road Safety Audit |
CA |
Pavement Replacement Using a Precast Concrete Pavement System on I-15 in Ontario |
Pavement: Precast Concrete Pavement System (PCPS) |
CO |
I-70 Tower Road to Colfax Avenue GRS-IBS Bridge Replacement Project |
Bridge: Geosynthetic Reinforced Soil – Integrated Bridge Systems (GRS-IBS) |
CO |
Pecos Street over I-70 Bridge Replacement Using SPMT Technology |
Contracting: Self-Propelled Modular Transport (SPMT), Construction Management/General Contractor (CMGC), Roundabouts, HAWK Signal |
CO |
Reconstruction of the I-25 Bronco Arch Bridge |
Bridge: Accelerated Bridge Construction (ABC) – Prefabricated Bridge Element System (PBES), Contractor value engineering, A (cost) + B (time to complete), Lane rentals, Incentives and Disincentives, Automatic anti-icing system |
CT |
Pavement Preservation on Interstate 95, Towns of Westbrook and Old Saybrook |
Pavement: Warm Mix Asphalt, Safety EdgeSM, Polymer modified asphalt |
DC |
Reconstruction of Eastern Avenue Bridge Over Kenilworth Avenue |
Bridge: Prefabricated Bridge Elements and Systems (PBES), No-Excuse bonus |
DC |
Replacement of the 27th Street, NW Bridge over Broad Branch Stream |
Bridge: Geosynthetic Reinforced Soil – Integrated Bridge Systems (GRS-IBS) |
FL |
Precast Concrete Pavement System on US 92 |
Pavement: Precast Concrete Pavement System (PCPS) |
GA |
I-85 Interchange Using a Prefabricated Bridge Elements in West Point, GA |
Bridge: Design-Build contracting, roller-compacted concrete, prefabricated bridge components/connections |
GA |
Pavement Replacement Using a Precast Concrete Pavement System along a Section of SR 11/Broad Street in Winder |
Pavement: Precast Concrete Pavement System (PCPS) |
HI |
Precast Concrete Pavement System along a Section of Middle Street, Honolulu, HI |
Pavement: Post-Tensioned Precast Concrete Pavement |
ID |
Replacement of SH 75 East Fork Salmon River Bridges |
Bridge: Prefabricated Bridge Elements and Systems, Self-Consolidating Concrete |
IN |
Rehabilitation of I-65/I-465 Interchange with Next Generation Concrete Surface in Indianapolis, IN |
Pavement: Next Generation Concrete Surface |
IA |
Accelerated Bridge construction on US 6 over Keg Creek |
Bridge: Accelerated Bridge Construction (ABC), Prefabricated Bridge Elements and Systems (PBES), Ultra-High Performance Concrete (UHPC), Self-Consolidating Concrete |
IA |
Improvements to the 24th Street – I-29/80 Interchange in Council Bluffs |
Bridge: Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Self-Consolidating Concrete |
IA |
Massena IA-92 Bridge Replacement Project |
Bridge: Accelerated Bridge Construction (ABC)/Lateral Bridge Slide, Precast concrete wingwalls |
IL |
Knox County Highway 4 Reconstruction Project |
Construction: 3D Modeling Design, Intelligent Compaction |
KS |
Use of Smart Work Zone Technology During Construction of the I-35/Homestead Lane Interchange in Johnson County Kansas |
Safety: Smarter Work Zones, Intelligent Transportation Systems |
LA |
A Project to Improve Safety and Speed Construction on LA511 (70th Street) in Shreveport |
Contracting: A+B bidding, Open graded friction course |
LA |
Maree Michel & Creek Bridges GRS-IBS Project |
Bridge: Geosynthetic Reinforced Soil – Integrated Bridge Systems (GRS-IBS) |
LA |
Wide Area Surveillance Radar and Sequential Gate for Traffic Management in Orleans and Jefferson Parishes, LA |
Operation: Regional Radar, Operator Interface, Ramp Controls |
ME |
Hotel Road (Littlefields Bridge) Replacement Using Superstructure Slide-In Technology |
Bridge: Prefabricated Bridge Elements and Systems including integrated abutments, pre-assembled two girder modules, high performance deck membranes, Full-depth precast deck panels with stainless steel reinforcement |
ME |
Reconstruction of Lamson and Boom Birch Bridges |
Bridge: Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES) |
MD |
Baltimore-Washington Parkway/West Nursery Road Bridge Superstructure Replacement Using SPMTs |
Bridge: Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT) |
MD |
Bridge Replacement on MD 28 and MD 450, Frederick County and Anne Arundel County, Maryland MD 28 and MD 450 Bridge Replacement |
Bridge: Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Alternative Contracting |
MA |
Reconstruction of Fourteen Bridges (FAST-14) on I-93 in Medford Using Accelerated Bridge Construction Techniques |
Bridge: Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Alternative Contracting |
MI |
Performance Contracting for Construction on M-115 in Clare County, MI |
Contracting: Performance Contracting |
MN |
Accelerated Bridge Construction over Paleface River on TH53 using Prefabricated Elements |
Bridge: Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES) |
MN |
Rapid Replacement of the Maryland Ave. Bridge over I-35E in St. Paul |
Bridge: Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT), Full Lane Closure |
MN |
Reconstruction of Trunk Highway 36 in North St. Paul |
Contracting: Alternative Contracting |
MO |
Design-Build Procurement Process for Construction on I-29/35 (kcICON) in Kansas City, MO |
Bridge: Design-Build, Base-Grouted Slurry-Displaced Drill Shafts, Precast, Prestressed Concrete Piles for Bridge Foundations |
MO |
Replacement of Three Bridges Using Hybrid-Composite Beam Technology |
Bridge: Hybrid Composite Beams |
MO |
The Use of High friction Surface Treatments in Missouri Highways |
Pavement: High Friction Surface Treatments (HFST) |
MT |
Innovative Culvert Rehabilitation Using Trenchless technologies |
Construction: Culvert Trenchless Technologies |
ND |
Whitetopping on U.S. 2 West of Rugby |
Pavement: Whitetopping, full lane closure |
NV |
Construction Manager at Risk Contracting for rehabilitation of I-80 Carlin Tunnels in Elko County, NV |
Contracting: LED Lighting, construction Manager at Risk Contracting |
NH |
Auburn-Candia Resurfacing Project |
Pavement: Warm Mix Asphalt, Safety EdgeSM, High RAP Content, Asphalt-Rubber (AR) Wearing Surface Mixture, High-Polymer Modified Asphalt (HiMA) Wearing Surface, Smarter Work Zone |
NY |
I-84 Bridge Over Dingle Ridge Road Replacement Using Superstructure Slide-In Technology |
Bridge: Accelerated Bridge Construction (ABC)/Lateral Bridge Slide |
NY |
Improvements to the Winton Road/I-590 Interchange in Rochester |
Design: Diverging Diamond Interchange |
NY |
Replacement of I-190 Bridges over Buffalo Avenue, Niagara Falls, NY |
Bridge: Accelerated Bridge Construction (ABC)/ Prefabricated Bridge Elements and Systems (PBES), Northeast Extreme Tee (NEXT) beam, iCONE, A+B |
OH |
Best-Value Design Build Contracting for Construction of i-71/I-670 Interchange in Columbus, OH |
Contracting: Performance Contracting – two-step best value design-build selection process |
OK |
Replacement of Bridge in Oklahoma Utilizing Accelerated Bridge Construction and Bridge Sliding Methodology |
Bridge: Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT) |
OR |
Accelerated Bridge Construction over Burnt River on Old US30 using Prefabricated Elements and Ultra-High Performance Concrete |
Bridge: Accelerated Bridge Construction (ABC), Ultra High Performance Concrete (UHPC) |
OR |
Alternative Project Delivery and Accelerated Bridge Construction on OR 38, Drain to Elkton |
Bridge: Accelerated Bridge Construction (ABC)/Prefabricated Bridge Elements and Systems (PBES), Hydraulic sliding system |
PA |
Rehabilitation of SR 3011, Keyser Avenue, Lackawanna County |
Pavement: Safety EdgeSM, Road Safety Audits, Warm Mix Asphalt, Intelligent Compaction |
PR |
Replacement of Bridge No. 1828 on PR-140 in Barceloneta, Puerto Rico |
Bridge: Geosynthetic Reinforced Soil – Integrated Bridge Systems (GRS-IBS) |
RI |
Replacement of east Shore Expressway Bridge No. 475 over Warren Ave. |
Bridge: Accelerated Bridge Construction (ABC), Prefabricated Bridge Element Systems (PBES), SPMT |
RI |
Replacement of Frenchtown Brook Bridge No. 435 |
Bridge: Accelerated Bridge Construction (ABC)/ Prefabricated Bridge Elements and Systems (PBES) |
SC |
Black River Bridge replacements on SC 377 in Williamsburg County |
Bridge: A+B+C contract bidding with built-in no-excuse incentives, Prefabricated Bridge Element Systems (PBES) with self-consolidating concrete |
SC |
Rapid Removal and replacement of the SC 703 Ben Sawyer Bridge Over the Intracoastal Waterway in Charleston County |
Bridge: Modular construction techniques, Design-build, Accelerated Bridge Construction (ABC), Hydraulic sliding system |
TN |
AC Resurfacing of Four Locations in Tennessee utilizing Intelligent Compaction Technology |
Construction: Intelligent Compaction |
TX |
Continuously Reinforced Concrete Pavement on FM 1938 |
Pavement: Intelligent Compaction of sub grade and base materials, Optimized Aggregate Gradation for Concrete Pavement, Non-Woven Geo-Textile Bond Breaker between CRCP and cement-treated base, Improved concrete curing, texture, and grooving of CRCP |
UT |
Geosynthetic Reinforced Soil – Integrated Bridge System on I-84 near Salt Lake City |
Bridge:Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT), Construction Management General Contractor (CM/GC) |
UT |
Precast Concrete Pavement System on I-215 |
Pavement: Precast Concrete Pavement System (PCPS) |
UT |
Rapid Removal and Replacement of the 4500 South Bridge Over I-215 in Salt Lake City |
Bridge: Accelerated Bridge Construction (ABC)/Self Propelled Modular Transport (SPMT), Construction Management General Contractor (CM/GC) |
UT |
Replacement of Manderfield Bridges, Beaver County |
Bridge: Accelerated Bridge Construction (ABC)/Hybrid-Composite Beams |
UT |
Route 6 Spanish Fork Bridge Deck Replacement |
Bridge: Accelerated Bridge Construction (ABC), Ultra-high performance concrete (UHPC) |
VT |
Rehabilitation of Culverts in South Burlington and Colchester |
Construction: Culvert Trenchless Technologies |
VT |
Route 2 – East Montpelier Bridge Reconstruction |
Bridge: Integral abutment bridges, high performance concrete |
VT |
Stockbridge-Bethel Roadway Reclamation Project |
Construction:3D Modeling Design, Intelligent Compaction |
VT |
Warm-Mix Asphalt and Rehabilitation of U.S. 4A and VT 30 |
Pavement: Warm Mix Asphalt |
VA |
I-66 Concrete Pavement Replacement Using Precast Concrete Pavement Systems |
Pavement: Precast Concrete Pavement System (PCPS) |
VA |
Pavement Rehabilitation Using Roller Compacted Concrete Pavement along a Section of Staffordboro Boulevard, Stafford, Virginia |
Pavement: Roller Compacted Concrete (RCC) |
VA |
Rapid Removal and Replacement of U.S. 15/29 Bridge Over Broad Run Near Gainesville, VA |
Bridge: Accelerated Bridge Construction (ABC)/ Prefabricated Bridge Element Systems (PBES), Construction Management General Contractor (CM/GC), self-consolidating concrete |
WA |
LED Lane Delineation and High Visibility Barrier Delineation for I-90 through Snoqualmie Pass in King and Kittitas Counties, WA |
Safety: Barrier delineator system, lane delineator installation |
WI |
Multiple Bridge Reconstruction on WIS 25 Across the Mississippi River |
Bridge: Open pile bents, High Performance Concrete, Precast Bridge Elements, and specially designed approach aprons |
WY |
Diverging Diamond Interchange Project at College Drive |
Pavement: Warm Mix Asphalt, Safety EdgeSM |
WY |
Wyoming Hwy 196 – Buffalo South/WMA Overlay Project |
Pavement: Warm Mix Asphalt, Safety EdgeSM |