Campaign: Risk MAP Challenges

MOBIS

For simplicity sake, FEMA should use GSA Mission Oriented Business Integrated Services (MOBIS) Schedule to choose the contracts for the next PTS procurement.

Submitted by

Voting

-23 votes
1 up votes
24 down votes

Campaign: Risk MAP Challenges

Non A&E Contracts for Risk MAP Support

Should FEMA seek contract vehicles separate from Architect&Engineering (A&E) to deliver non-A&E work, what should FEMA consider to be non-A&E that is currently under the PTS? Examples: conducting Risk MAP Discovery and Resiliency meetings or Post Preliminary Processing.

Submitted by

Voting

-32 votes
3 up votes
35 down votes

Campaign: Process Administration & Letters of Map Change

LOMC processing as a single, non A&E contract

The current LOMC process is inefficient, full of cost redundancy, creates operational inconsistencies and is not cost effective for the program. LOMC processing is more fundamentally aligned with proven commercial practices in GIS technology, flood zone determination and application batch processing than A&E centric DFIRM production. The majority of LOMC cases require an out of the box analysis that needs no advanced ...more »

Submitted by

Voting

-28 votes
10 up votes
38 down votes

Campaign: Process Administration & Letters of Map Change

Non-AE Contractor for Process Administration

FEMA should consider using a non-AE contractor for regulatory and other process administration tasks to gain efficiencies and decrease costs, as these tasks don't require engineering credentials or expertise to complete (such as product distribution, meetings prep and execution, correspondence, tracking, coordination, etc).

Submitted by

Voting

-34 votes
5 up votes
39 down votes