Required Approvals:
Projects and Statewide Planning Requirements
Required Approvals:
Cost-Effectiveness Determinations and Public-Interest Findings
Required Approvals:
Selecting the Method of Construction: Contract or Force Account
Required Approvals:
Project Advertisement, Bid Review, and Request for Concurrence in Award
Design:
Project Geometric Design Requirements
Preparing the PS&E:
Environmental Requirements
Design:
Value Engineering Requirements for Federal-aid Projects
Design:
Bike and Pedestrian Accommodation
Design:
Pedestrian Accessible Design Requirements
Contract Specifications:
Form FHWA-1273
Contract Specifications:
Patented or Proprietary Products
Contract Specifications:
Buy America Contract Requirements
Preparing the PS&E:
Utility Coordination and Certification Requirements
Preparing the PS&E:
Railroad Coordination and Certification Requirements
Preparing the PS&E:
Right-of-Way Coordination and Certification Requirements
Operations:
Purchasing Intelligent Traffic Systems (ITS) and Traffic Technology
Operations:
Scoping and Conducting a Traffic Study to Meet Community Needs
Manual on Uniform Traffic Control Devices (MUTCD):
Applying the MUTCD to Aid Safety and Reliability
The authorization to advertise a Federal-aid project for construction is conditional on meeting all environmental obligations
Companion Resource (PDF, 186 KB) : Includes the printable script for this video
Web Resources: Includes Web links to related Code of Federal Regulations and other links appropriate to this video module.
Federal regulation covering PS&Es needed to be authorized for construction
Link to FHWA policies, guidance, best practices, training and other updates
Feedback | Disclaimer | Contact Us
To view PDF files, you can use the Acrobat® Reader®.