Required Approvals:
Projects and Statewide Planning Requirements
Required Approvals:
Cost-Effectiveness Determinations and Public-Interest Findings
Required Approvals:
Selecting the Method of Construction: Contract or Force Account
Required Approvals:
Project Advertisement, Bid Review, and Request for Concurrence in Award
Design:
Project Geometric Design Requirements
Preparing the PS&E:
Environmental Requirements
Design:
Value Engineering Requirements for Federal-aid Projects
Design:
Bike and Pedestrian Accommodation
Design:
Pedestrian Accessible Design Requirements
Contract Specifications:
Form FHWA-1273
Contract Specifications:
Patented or Proprietary Products
Contract Specifications:
Buy America Contract Requirements
Preparing the PS&E:
Utility Coordination and Certification Requirements
Preparing the PS&E:
Railroad Coordination and Certification Requirements
Preparing the PS&E:
Right-of-Way Coordination and Certification Requirements
Operations:
Purchasing Intelligent Traffic Systems (ITS) and Traffic Technology
Operations:
Scoping and Conducting a Traffic Study to Meet Community Needs
Manual on Uniform Traffic Control Devices (MUTCD):
Applying the MUTCD to Aid Safety and Reliability
Certain requirements must be met when sole-sourcing a patented or proprietary product on Federal-aid projects
Companion Resource (PDF, 168 KB) : Includes the printable script for this video
Web Resources: Includes Web links to related Code of Federal Regulations and other links appropriate to this video module.
FHWA guidance on patented and proprietary products in question-and-answer format
Link to 23 CFR 635.411 covering material or product selection
FHWAs searchable database of examples of approved patented or proprietary items
FHWA's 2006 guidelines on evaluating public-interest findings for sign sheeting.