Campaign: Risk MAP Challenges

Procurement Efficiency

Perhaps FEMA should be more flexible on subcontracting goals. Let the contractor add subcontractors regardless of their size without impacting the goals as long as the first level of goal is met.

Submitted by

Tags

Voting

5 votes
9 up votes
4 down votes
Idea No. 1348