Home
DAG Tutorial
Search
Available Downloads
Feedback
The DAG does not reflect the changes in the DoDI5000.02. Work is in progress to update the content and will be completed as soon as possible.
Jump to Content
Jump to Navigation and Tools
Help
.
ACC Practice Center
>
AT&L Knowledge Management...
>
Welcome to the Defense...
Welcome to the Defense Acquisition Guidebook Home Page
Community
JavaScript is currently disabled. Some advanced features may not be supported.
Welcome
Welcome to the Defense Acquisition Guidebook Home Page
List of All Contributions at this location
Rss Link
Show All
|
Filtered By
Helpful
|
Popular
|
New
24 Hrs
|
7 Days
|
30 Days
|
All Time
No items found.
Popular Tags
dapwg
Browse
ACC Home
Up one level
Welcome to the Defense Acquisition...
Foreword
Chapter 1 -- Department of Defense...
1.0. Overview
1.1. Integration of the DoD Decision...
1.2. Planning Programming Budgeting and...
1.3. Joint Capabilities Integration and...
1.4. Defense Acquisition System
Chapter 2 -- Program Strategies
Chapter 3 -- Affordability and...
3.0. Overview
3.1. Life-Cycle Costs/Total Ownership...
3.2. Affordability
3.3. Analysis of Alternatives
3.4. Cost Estimation for Major Defense...
3.5. Manpower Estimates
3.6. Major Automated Information Systems...
3.7. Principles for Life-Cycle Cost...
Chapter 4 -- Systems Engineering
Chapter 5 -- Life-Cycle Logistics
5.0. Overview
5.1. Life-Cycle Sustainment in the...
5.2. Applying Systems Engineering to...
5.3. Supportability Design...
5.4. Sustainment in the Life-Cycle...
5.5. References
Chapter 6 -- Human Systems Integration...
6.0. Overview
6.1. Total System Approach
6.2 HSI - Integration Focus
6.3. Human Systems Integration Domains
6.4. Human Systems Integration (HSI)...
6.5. Manpower Estimates
6.6. Additional References
Chapter 7 -- Acquiring Information...
Chapter 8 -- Intelligence Analysis...
Chapter 9 -- Test and Evaluation (T&E)
Chapter 10 -- Decisions Assessments and...
10.0. Overview
10.1. Decision Points
10.2. Executive Review Forums
10.3. Integrated Product and Process...
10.4. Role of Exit Criteria
10.5. Role of Independent Assessments
10.5.3. Preliminary Design Review (PDR)...
10.6. Information Sharing and DoD...
10.7. Management Control
10.8. Program Plans
10.9. Acquisition Program Baseline (APB)
10.10. Periodic Reports
10.11. Major Automated Information...
10.12. Defense Acquisition Executive...
10.13. Acquisition Visibility
10.14. Special Interest Programs
10.15. Relationship of Affordability and...
10.16. Acquisition Program Transition...
Chapter 11 -- Program Management...
Chapter 12 - Defense Business System...
Chapter 13 -- Program Protection
Chapter 14 -- Acquisition of Services
14.0. Overview
14.1. Introduction to the Acquisition of...
14.2. The Planning Phase
14.3. The Development Phase
14.4. The Execution Phase
Appendix A -- REQUIREMENTS ROADMAP...
Appendix B -- SERVICE ACQUISITION...
Appendix C -- SERVICE ACQUISITION MALL...
Appendix D -- MARKET RESEARCH RESOURCES
Appendix E -- GLOSSARY
DoD Directive 5000.01
DoD Instruction 5000.02
TABLE OF CONTENTS
Enclosure 1 -- References
Enclosure 2 -- Procedures
Enclosure 3 -- Acquisition Category...
Enclosure 4 -- Statutory and Regulatory...
Enclosure 5 -- IT Considerations
Enclosure 6 -- Integrated T&E
Enclosure 7 -- Resource Estimation
Enclosure 8 -- Human Systems Integration...
Enclosure 9 -- Acquisition of Services
Enclosure 10 -- Program Management
Enclosure 11 -- Management of Defense...
Enclosure 12 -- Systems Engineering
Recent Policy and Guidance
Download the Defense Acquisition...
Weapon Systems Acquisition Reform Act of...
Current JCIDS Manual and CJCSI 3170.01 I
Defense Acquisition Guidebook Key...
Tags
09-027
acat
"acat i"
"acat ia"
"acat ii"
"acat iii"
acquisition
"alternate lft&e plan"
aoa
apb
"beyond-lrip report"
card
cca
cdd
"certification of spectrum support"
contracting
cpd
dbsmc
"dd form 1494"
"defense acquisition management system"
"dtm 10-017"
"engineering and manufacturing development phase"
"evolutionary acquisition"
hsi
icd
iot&e
isp
iuid
lcce
lft&e
lrip
mais
mda
mdap
"milestone requirements"
"operations and support phase"
peshe
"production and deployment phase"
"review procedures"
se
sep
service
sustainment
"systems engineering"
tds
"technology development"
"technology development phase"
"technology opportunities"
tra
"user needs"
View All
ACC Practice Center Version
3.2
Application Build 3.2.9
Database Version 3.2.9