U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations

Overview | Projects

 

 

All Laboratory Projects

 

Status:  All Projects Status   No. of Projects:  158

Dates from: 1/1/2003 to 12/31/2020

Key Words Search:  

Select Laboratory Name
Search by Key Words.
Type in Key Words up to 200 characters
(including spaces).
Search by Start Date, End Date or both.
Start Date: End Date:  
Search by Project Status
Select Projects Status

[FHWA-PROJ-03-0001] : Development of Performance-Based Specification for Asphalt Binders: Fatigue Characterization

Project ID   FHWA-PROJ-03-0001 Click to view document
Contact   Gibson, Nelson H
Project Start   1/1/03
Project End   6/30/10
Project Status   Completed

[FHWA-PROJ-03-0004] : Traffic Control Devices Transportation Pooled Fund Study

Project ID   FHWA-PROJ-03-0004 Click to view document
Contact   Shurbutt, Jim
Project Start   11/1/03
Project End   2/1/15
Project Status   Active

[FHWA-PROJ-03-0005] : Curved Steel Bridge Research Project

Project ID   FHWA-PROJ-03-0005 Click to view document
Contact   Beshah, Fassil B
Project Start   1/1/03
Project End   5/30/14
Project Status   Completed

[FHWA-PROJ-05-0004] : Full Scale Bridge Cable Tests

Project ID   FHWA-PROJ-05-0004 Click to view document
Contact   Bosch, Harold R
Project Start   10/1/05
Project End   9/30/14
Project Status   Active

[FHWA-PROJ-06-0014] : Technical Assistance for Cooperative Intersection Collision Avoidance Systems Program

Project ID   FHWA-PROJ-06-0014 Click to view document
Contact   Huang, Peter
Project Start   8/18/06
Project End   9/18/11
Project Status   Completed

[FHWA-PROJ-06-0017] : Monitoring of Wind Conditions and Bridge Behavior at Select Bridge Sites

Project ID   FHWA-PROJ-06-0017 Click to view document
Contact   Bosch, Harold R
Project Start   9/1/06
Project End   9/30/15
Project Status   Active

[FHWA-PROJ-06-0018] : Parametric Studies of Bridge Geometric Details and Their Aerodynamic Significance

Project ID   FHWA-PROJ-06-0018 Click to view document
Contact   Bosch, Harold R
Project Start   9/1/06
Project End   12/31/15
Project Status   Active

[FHWA-PROJ-06-0024] : Shear Behavior of Lightweight High-Performance Concrete Girders

Project ID   FHWA-PROJ-06-0024 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/06
Project End   12/31/15
Project Status   Active

[FHWA-PROJ-06-0025] : Transfer Length and Development Length Behaviors of Lightweight High-Performance Concrete Girders

Project ID   FHWA-PROJ-06-0025 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/06
Project End   3/31/15
Project Status   Active

[FHWA-PROJ-06-0026] : Mild Steel Reinforcement Splice Behavior of Lightweight High-Performance Concrete

Project ID   FHWA-PROJ-06-0026 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/06
Project End   9/30/13
Project Status   Completed

[FHWA-PROJ-06-0028] : Asphalt Modification with Phosphoric Acid

Project ID   FHWA-PROJ-06-0028 Click to view document
Contact   Arnold, Terry
Project Start   12/6/06
Project End   2/20/14
Project Status   Completed

[FHWA-PROJ-06-0036] : Mechanical Properties of Lightweight High-Performance Concrete

Project ID   FHWA-PROJ-06-0036 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/06
Project End   7/31/13
Project Status   Completed

[FHWA-PROJ-06-0037] : Federal Highway Administration Design Manual: Deep Mixing for Embankment and Foundation Support

Project ID   FHWA-PROJ-06-0037 Click to view document
Contact   Adams, Michael
Project Start   9/15/06
Project End   9/30/13
Project Status   Active

[FHWA-PROJ-07-0001] : Development of an Ultra-High Performance Concrete Precast Bridge Deck Element

Project ID   FHWA-PROJ-07-0001 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/07
Project End   9/30/07
Project Status   Completed

[FHWA-PROJ-07-0002] : Flexural Behavior of Minimally Reinforced Ultra-High Performance Concrete Beams

Project ID   FHWA-PROJ-07-0002 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/07
Project End   12/31/14
Project Status   Terminated

[FHWA-PROJ-07-0003] : Flexural Fatigue Performance of Ultra-High Performance Concrete

Project ID   FHWA-PROJ-07-0003 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/07
Project End   12/31/13
Project Status   Terminated

[FHWA-PROJ-07-0013] : Fatigue Performance of Rib-to-Deck Welds for Steel Orthotropic Bridge Decks

Project ID   FHWA-PROJ-07-0013 Click to view document
Contact   Ocel, Justin
Project Start   7/1/07
Project End   8/1/14
Project Status   Active

[FHWA-PROJ-07-0014] : Galvanizing Effect on the Fatigue Performance of Sign and Signal Socket Connection Details

Project ID   FHWA-PROJ-07-0014 Click to view document
Contact   Ocel, Justin
Project Start   7/1/07
Project End   8/1/14
Project Status   Active

[FHWA-PROJ-07-0015] : Completion Of 67-80 Accelerated Pavement Testing Facility Mixture Fatigue And Rutting Characterization

Project ID   FHWA-PROJ-07-0015 Click to view document
Contact   Gibson, Nelson H
Project Start   8/1/07
Project End   12/31/08
Project Status   Completed

[FHWA-PROJ-07-0027] : Scour Evaluation Studies: Scour in Cohesive Soils and Ex Situ Scour Testing Device

Project ID   FHWA-PROJ-07-0027 Click to view document
Contact   Kerenyi, Kornel
Project Start   10/1/07
Project End   7/30/14
Project Status   Active

[FHWA-PROJ-08-0002] : Development of Performance-Based Specifications for Asphalt Mixtures

Project ID   FHWA-PROJ-08-0002 Click to view document
Contact   Petros, Katherine A
Project Start   2/6/08
Project End   7/31/14
Project Status   Active

[FHWA-PROJ-08-0003] : High-Performance, Stress-Relaxing Cementitious Composites for Crack-Free Pavements and Transportation Structures

Project ID   FHWA-PROJ-08-0003 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   2/20/08
Project End   3/31/12
Project Status   Completed

[FHWA-PROJ-08-0008] : Development of an Ultra-High Performance Concrete Bridge Superstructure System

Project ID   FHWA-PROJ-08-0008 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   7/1/08
Project End   12/31/09
Project Status   Completed

[FHWA-PROJ-08-0014] : Step Frequency Ground Penetrating Radar for Location and Evaluation of In-Roadway Sensors (06-FH2_SBIR) Phase IIb

Project ID   FHWA-PROJ-08-0014 Click to view document
Contact   Gibson, David P
Project Start   9/14/11
Project End   10/30/12
Project Status   Completed

[FHWA-PROJ-08-0045] : Guidelines for the Load and Resistance Factor Design and Rating of Riveted and Bolted Gusset-Plate Connections for Steel Bridges

Project ID   FHWA-PROJ-08-0045 Click to view document
Contact   Ocel, Justin
Project Start   10/1/08
Project End   4/30/13
Project Status   Completed

[FHWA-PROJ-08-0059] : Advanced Crash Analysis Program (ACAP) for Transportation Safety and Security

Project ID   FHWA-PROJ-08-0059 Click to view document
Contact   Arispe, Eduardo
Project Start   12/23/08
Project End   5/31/14
Project Status   Active

[FHWA-PROJ-09-0001] : Ultra-High Performance Concrete Material Model

Project ID   FHWA-PROJ-09-0001 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/09
Project End   9/30/10
Project Status   Completed

[FHWA-PROJ-09-0002] : Simultaneous Structural and Environmental Loading of an Ultra-High Performance Concrete Component

Project ID   FHWA-PROJ-09-0002 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/09
Project End   6/30/10
Project Status   Completed

[FHWA-PROJ-09-0003] : Structural Performance of Field-Cast, Ultra-High Performance Concrete Deck Level Connections

Project ID   FHWA-PROJ-09-0003 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/09
Project End   11/1/10
Project Status   Completed

[FHWA-PROJ-09-0004] : Reevaluation of the Adjustment Factor for Coarse Bed Material Under Clear-Water Scour Condition

Project ID   FHWA-PROJ-09-0004 Click to view document
Contact   Kerenyi, Kornel
Project Start   2/1/09
Project End   9/30/11
Project Status   Completed

[FHWA-PROJ-09-0014] : Establishment of the Saxton Transportation Operations Laboratory (TOL)

Project ID   FHWA-PROJ-09-0014 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   6/1/09
Project End   11/30/12
Project Status   Completed

[FHWA-PROJ-09-0020] : Greatly Increased Use of Fly Ash in Hydraulic Cement Concrete for Pavement Layers and Transportation Structures

Project ID   FHWA-PROJ-09-0020 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   7/9/09
Project End   12/31/12
Project Status   Completed

[FHWA-PROJ-09-0021] : Nondestructive Evaluation Web Manual

Project ID   FHWA-PROJ-09-0021 Click to view document
Contact   Rivers, Benjamin
Project Start   7/13/09
Project End   6/30/14
Project Status   Active

[FHWA-PROJ-09-0022] : Integrated Texture-Noise Model Development

Project ID   FHWA-PROJ-09-0022 Click to view document
Contact   Wiser, Larry J
Project Start   7/21/09
Project End   2/20/13
Project Status   Completed

[FHWA-PROJ-09-0027] : Student Research in Transportation Data

Project ID   FHWA-PROJ-09-0027 Click to view document
Contact   McHale, Gene M
Project Start   8/17/09
Project End   8/16/10
Project Status   Completed

[FHWA-PROJ-09-0033] : Detailed Exploration of the Locking Point Concept in Mix Design

Project ID   FHWA-PROJ-09-0033 Click to view document
Contact   Gibson, Nelson H
Project Start   9/1/09
Project End   2/27/13
Project Status   Active

[FHWA-PROJ-09-0035] : Asphalt Pavement Embrittlement: Evaluating the Relationship Between Field and Lab Aging

Project ID   FHWA-PROJ-09-0035 Click to view document
Contact   Gibson, Nelson H
Project Start   9/1/09
Project End   8/31/12
Project Status   Terminated

[FHWA-PROJ-09-0036] : Synthesis of Aerodynamic Results from Prior Wind Tunnel Bridge Investigations Conducted in North America

Project ID   FHWA-PROJ-09-0036 Click to view document
Contact   Bosch, Harold R
Project Start   9/1/09
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-09-0040] : Quick Incident Detection and Warning

Project ID   FHWA-PROJ-09-0040 Click to view document
Contact   Huang, Peter
Project Start   9/1/09
Project End   9/30/13
Project Status   Active

[FHWA-PROJ-09-0048] : Asphalt Sustainability Issues: Evaluation of Long-Term Performance of Recycled Additives, Including Recycled Motor Oil, Reclaimed Asphalt Pavements, Reclaimed Asphalt Shingles, and Bioasphalts

Project ID   FHWA-PROJ-09-0048 Click to view document
Contact   Youtcheff, Jack
Project Start   9/15/09
Project End   12/31/12
Project Status   Active

[FHWA-PROJ-09-0056] : Geotextile Separation Layer for Aggregate Base Courses

Project ID   FHWA-PROJ-09-0056 Click to view document
Contact   Gibson, Nelson H
Project Start   10/1/09
Project End   12/31/12
Project Status   Temporarily Suspended

[FHWA-PROJ-09-0057] : Optimal Binder Selection for High-Level Reclaimed Asphalt Pavement Mixes

Project ID   FHWA-PROJ-09-0057 Click to view document
Contact   Gibson, Nelson H
Project Start   10/1/09
Project End   12/30/11
Project Status   Completed

[FHWA-PROJ-09-0067] : Making Driving Simulators More Useful for Behavioral Research

Project ID   FHWA-PROJ-09-0067 Click to view document
Contact   Philips, Brian
Project Start   11/12/09
Project End   6/30/13
Project Status   Completed

[FHWA-PROJ-10-0001] : Nonlinear Fracture Mechanics Approach to Fatigue Grading of Asphalt Mixtures and Binders

Project ID   FHWA-PROJ-10-0001 Click to view document
Contact   Gibson, Nelson H
Project Start   1/1/10
Project End   6/1/10
Project Status   Completed

[FHWA-PROJ-10-0003] : Connections for Modular Concrete Bridge Components

Project ID   FHWA-PROJ-10-0003 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/10
Project End   12/31/16
Project Status   Active

[FHWA-PROJ-10-0005] : Asphalt with Improved Physical Properties

Project ID   FHWA-PROJ-10-0005 Click to view document
Contact   Arnold, Terry
Project Start   2/1/10
Project End   12/31/11
Project Status   Terminated

[FHWA-PROJ-10-0007] : Active Traffic Management Study

Project ID   FHWA-PROJ-10-0007 Click to view document
Contact   Philips, Brian
Project Start   9/27/11
Project End   10/30/13
Project Status   Active

[FHWA-PROJ-10-0008] : Gusset-Plate Testing Program

Project ID   FHWA-PROJ-10-0008 Click to view document
Contact   Rivers, Benjamin
Project Start   2/8/10
Project End   2/7/14
Project Status   Active

[FHWA-PROJ-10-0009] : Advanced Traffic Signal Control Algorithms

Project ID   FHWA-PROJ-10-0009 Click to view document
Contact   Yang, Peter
Project Start   2/16/10
Project End   5/31/13
Project Status   Completed

[FHWA-PROJ-10-0011] : Full-Scale Aggregate Base Design and Construction

Project ID   FHWA-PROJ-10-0011 Click to view document
Contact   Gibson, Nelson H
Project Start   3/1/10
Project End   12/31/12
Project Status   Active

[FHWA-PROJ-10-0018] : Expert System Signal Operation Analysis Tool, Phase I

Project ID   FHWA-PROJ-10-0018 Click to view document
Contact   Huang, Peter
Project Start   10/24/11
Project End   11/1/13
Project Status   Completed

[FHWA-PROJ-10-0022] : Every Day Counts Activities

Project ID   FHWA-PROJ-10-0022 Click to view document
Contact   Adams, Michael
Project Start   4/5/10
Project End   12/31/17
Project Status   Active

[FHWA-PROJ-10-0026] : Assessment of Prestressing Strand and Lightweight Concrete via the Standard Test for Strand Bond (STSB)

Project ID   FHWA-PROJ-10-0026 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   6/1/10
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-10-0027] : Performance of Conventional Hot-Mix Asphalt Overlays and High Reclaimed Asphalt Pavement Content Overlays

Project ID   FHWA-PROJ-10-0027 Click to view document
Contact   Gibson, Nelson H
Project Start   6/16/10
Project End   3/14/12
Project Status   Terminated

[FHWA-PROJ-10-0030] : Direct Tension Test Method for Ultra-High Performance Concrete

Project ID   FHWA-PROJ-10-0030 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   7/1/10
Project End   12/31/15
Project Status   Active

[FHWA-PROJ-10-0031] : Material Properties of Prebagged Grouts for Prefabricated Bridge Element and System Connections

Project ID   FHWA-PROJ-10-0031 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   7/1/10
Project End   2/28/13
Project Status   Completed

[FHWA-PROJ-10-0032] : Steel Suspension Bridge Vulnerability and Countermeasures

Project ID   FHWA-PROJ-10-0032 Click to view document
Contact   Munley, Eric P
Project Start   7/12/10
Project End   7/12/15
Project Status   Active

[FHWA-PROJ-10-0033] : Dilemma Zone Intelligent Transportation Systems for High-Speed Intersections

Project ID   FHWA-PROJ-10-0033 Click to view document
Contact   Huang, Peter
Project Start   5/1/14
Project End   6/10/14
Project Status   Active

[FHWA-PROJ-10-0046] : Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Engaging the International Community

Project ID   FHWA-PROJ-10-0046 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   9/30/11
Project Status   Completed

[FHWA-PROJ-10-0047] : Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Evaluating Intelligent Eco-Drive Applications

Project ID   FHWA-PROJ-10-0047 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   1/30/12
Project Status   Completed

[FHWA-PROJ-10-0048] : Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Eco-Adaptive Signalized Intersection Algorithm

Project ID   FHWA-PROJ-10-0048 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   1/30/12
Project Status   Completed

[FHWA-PROJ-10-0049] : Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Assessment of Data and Modeling Opportunities for Heavy Trucks

Project ID   FHWA-PROJ-10-0049 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   9/30/11
Project Status   Completed

[FHWA-PROJ-10-0050] : Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Design for Environmental Data Capture System

Project ID   FHWA-PROJ-10-0050 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   5/18/11
Project Status   Completed

[FHWA-PROJ-10-0051] : Applications for the Environment Real-Time Synthesis Broad Agency Announcement Project: Environmental Models and Applications

Project ID   FHWA-PROJ-10-0051 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   9/30/11
Project Status   Completed

[FHWA-PROJ-10-0052] : Applications for the Environment: Real-Time Synthesis Broad Agency Announcement Project: Evaluate Fuel Efficient Route Guidance

Project ID   FHWA-PROJ-10-0052 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   2/7/12
Project Status   Completed

[FHWA-PROJ-10-0053] : Applications for the Environment Real-Time Synthesis State-of-the-Practice Support

Project ID   FHWA-PROJ-10-0053 Click to view document
Contact   Ferlis, Robert A (Bob)
Project Start   9/23/10
Project End   7/6/11
Project Status   Completed

[FHWA-PROJ-10-0059] : Wind Effects on Bridge Stay Cables

Project ID   FHWA-PROJ-10-0059 Click to view document
Contact   Bosch, Harold R
Project Start   9/30/10
Project End   9/30/14
Project Status   Active

[FHWA-PROJ-10-0061] : Develop/Improve American Association of State Highway and Transportation Officials Concrete Coefficient of Thermal Expansion Test

Project ID   FHWA-PROJ-10-0061 Click to view document
Contact   Meininger, Ahmad
Project Start   10/1/10
Project End   9/30/14
Project Status   Active

[FHWA-PROJ-10-0062] : Deleterious Aggregates—Identification, Testing, Mitigation, and Use of Local Materials

Project ID   FHWA-PROJ-10-0062 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   10/1/10
Project End   9/30/14
Project Status   Active

[FHWA-PROJ-10-0063] : Grout Performance in Staged Construction Connections

Project ID   FHWA-PROJ-10-0063 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/10
Project End   5/31/12
Project Status   Completed

[FHWA-PROJ-10-0064] : Structural Performance of a Novel Ultra-High Performance Concrete Composite Connection

Project ID   FHWA-PROJ-10-0064 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/10
Project End   3/31/12
Project Status   Completed

[FHWA-PROJ-10-0065] : High-Performance Computational Fluid Dynamics Modeling at Argonne National Laboratory Transportation Research and Analysis Computer Center

Project ID   FHWA-PROJ-10-0065 Click to view document
Contact   Kerenyi, Kornel
Project Start   10/17/10
Project End   9/17/15
Project Status   Active

[FHWA-PROJ-10-0066] : Field and Safety Evaluation of Mini-Roundabouts

Project ID   FHWA-PROJ-10-0066 Click to view document
Contact   Zhang, Wei
Project Start   10/1/10
Project End   10/1/15
Project Status   Active

[FHWA-PROJ-10-0071] : Documentation of Highway Driving Simulator Software

Project ID   FHWA-PROJ-10-0071 Click to view document
Contact   Philips, Brian
Project Start   12/1/10
Project End   12/31/12
Project Status   Completed

[FHWA-PROJ-10-0083] : Use of Nanoporous Thin Films (NPTF) to Improve Aggregate-Cement Interface

Project ID   FHWA-PROJ-10-0083 Click to view document
Contact   Youtcheff, Jack
Project Start   4/1/10
Project End   4/1/13
Project Status   Active

[FHWA-PROJ-10-0084] : Improved Performance of Concrete in Rigid Pavements and Other Transportation Structures Through Modeling of Cement Hydration

Project ID   FHWA-PROJ-10-0084 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   10/1/10
Project End   3/26/16
Project Status   Active

[FHWA-PROJ-10-0085] : Extension of Flexible Pavement Life With Preservation to Resist Aging and Embrittlement

Project ID   FHWA-PROJ-10-0085 Click to view document
Contact   Gibson, Nelson H
Project Start   5/5/10
Project End   12/31/12
Project Status   Active

[FHWA-PROJ-11-0001] : Rapid Characterization of Alkali-Silica Reactivity (ASR) in Concrete

Project ID   FHWA-PROJ-11-0001 Click to view document
Contact   Arnold, Terry
Project Start   1/1/11
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-11-0003] : Development of a Family of Ultra-High Performance Concrete Pi-Girders

Project ID   FHWA-PROJ-11-0003 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/11
Project End   9/30/13
Project Status   Completed

[FHWA-PROJ-11-0009] : Signal Phase and Timing and Related Messages for Connected Vehicle Applications

Project ID   FHWA-PROJ-11-0009 Click to view document
Contact   Curtis, Deborah M
Project Start   1/28/11
Project End   6/30/13
Project Status   Completed

[FHWA-PROJ-11-0010] : Fatigue Characterization of Plant Produced High Reclaimed Asphalt Pavement Mixtures

Project ID   FHWA-PROJ-11-0010 Click to view document
Contact   Gibson, Nelson H
Project Start   2/1/11
Project End   6/1/11
Project Status   Completed

[FHWA-PROJ-11-0014] : Characterization of Open-Graded Aggregates

Project ID   FHWA-PROJ-11-0014 Click to view document
Contact   Nicks, Jennifer E
Project Start   3/1/11
Project End   8/19/13
Project Status   Completed

[FHWA-PROJ-11-0017] : Development of the Capacity Analysis for Planning of Junctions Tool (CAP-X)

Project ID   FHWA-PROJ-11-0017 Click to view document
Contact   Lochrane, Taylor
Project Start   3/7/11
Project End   3/30/12
Project Status   Completed

[FHWA-PROJ-11-0022] : Characterization of Fresh and Hardened Cementitious Mixtures for Sustainable Pavements

Project ID   FHWA-PROJ-11-0022 Click to view document
Contact   Ardani, Ahmad
Project Start   2/1/11
Project End   12/31/17
Project Status   Active

[FHWA-PROJ-11-0025] : Calibration of Driver Behavior Parameters for Optimization of Work Zone Throughput

Project ID   FHWA-PROJ-11-0025 Click to view document
Contact   Lochrane, Taylor
Project Start   4/1/11
Project End   1/31/14
Project Status   Active

[FHWA-PROJ-11-0030] : Response-Based Load Rating of Steel Bridges

Project ID   FHWA-PROJ-11-0030 Click to view document
Contact   Boone, Shane
Project Start   4/11/11
Project End   6/4/13
Project Status   Active

[FHWA-PROJ-11-0036] : Field Pavement Remaining Structural Life Assessment Tests

Project ID   FHWA-PROJ-11-0036 Click to view document
Contact   Gibson, Nelson H
Project Start   5/1/11
Project End   11/30/12
Project Status   Terminated

[FHWA-PROJ-11-0039] : Radiographic Inspection of Gusset-Plate Connections

Project ID   FHWA-PROJ-11-0039 Click to view document
Contact   Ocel, Justin
Project Start   5/9/11
Project End   11/1/12
Project Status   Completed

[FHWA-PROJ-11-0041] : Modified Flexural Strength Test

Project ID   FHWA-PROJ-11-0041 Click to view document
Contact   Ardani, Ahmad
Project Start   5/15/11
Project End   8/31/14
Project Status   Active

[FHWA-PROJ-11-0045] : Develop Traffic Capacity Models for Mini-Roundabouts from Simulation

Project ID   FHWA-PROJ-11-0045 Click to view document
Contact   Lochrane, Taylor
Project Start   5/30/11
Project End   3/30/12
Project Status   Completed

[FHWA-PROJ-11-0050] : Mapping Assessment for Connected Vehicle Highway Network

Project ID   FHWA-PROJ-11-0050 Click to view document
Contact   Persaud, Deborah M
Project Start   6/24/11
Project End   12/31/12
Project Status   Completed

[FHWA-PROJ-11-0057] : Evaluation and Removal of Surface Contaminants From Steel Prior to Coating

Project ID   FHWA-PROJ-11-0057 Click to view document
Contact   Ocel, Justin
Project Start   8/1/11
Project End   11/18/12
Project Status   Terminated

[FHWA-PROJ-11-0061] : Performance Tests for Geosynthetic Reinforced Soil (GRS)

Project ID   FHWA-PROJ-11-0061 Click to view document
Contact   Nicks, Jennifer E
Project Start   8/15/11
Project End   9/2/13
Project Status   Completed

[FHWA-PROJ-11-0067] : Vehicle Positioning and Communications Test Implementation for Initial Capability—Telecommunications and Positioning: Phase II

Project ID   FHWA-PROJ-11-0067 Click to view document
Contact   Arnold, James A
Project Start   9/30/11
Project End   8/31/13
Project Status   Active

[FHWA-PROJ-11-0069] : Determining an Aggregate's Potential for Forming Alkali-Silica Reactivity (ASR) Gels in Concrete

Project ID   FHWA-PROJ-11-0069 Click to view document
Contact   Arnold, Terry
Project Start   10/1/11
Project End   12/31/16
Project Status   Active

[FHWA-PROJ-11-0070] : Advance Use of Recycled Asphalt in Flexible Pavement Infrastructure: Develop and Deploy Framework for Proper Use and Evaluation of Recycled Asphalt in Asphalt Mixtures

Project ID   FHWA-PROJ-11-0070 Click to view document
Contact   Gibson, Nelson H
Project Start   10/1/11
Project End   12/30/15
Project Status   Active

[FHWA-PROJ-11-0101] : Applications for the Environment: Real-Time Information Synthesis (AERIS) Evaluation Project

Project ID   FHWA-PROJ-11-0101 Click to view document
Contact   Huang, Peter
Project Start   10/24/11
Project End   10/31/14
Project Status   Active

[FHWA-PROJ-11-0103] : Smart Scour Countermeasures

Project ID   FHWA-PROJ-11-0103 Click to view document
Contact   Jalinoos, Frank
Project Start   11/15/11
Project End   6/30/14
Project Status   Active

[FHWA-PROJ-11-0104] : Development of a Field Prototype for the Inspection of Culverts

Project ID   FHWA-PROJ-11-0104 Click to view document
Contact   Jalinoos, Frank
Project Start   7/29/10
Project End   4/30/13
Project Status   Completed

[FHWA-PROJ-11-0106] : Driver Behavior on Horizontal Curves Pilot Study

Project ID   FHWA-PROJ-11-0106 Click to view document
Contact   Shurbutt, Jim
Project Start   12/1/11
Project End   6/30/12
Project Status   Completed

[FHWA-PROJ-11-0107] : Geosynthetic Reinforced Soil (GRS) – Timber Bridge: A Sustainable Bridge Construction for Low-Volume Roads

Project ID   FHWA-PROJ-11-0107 Click to view document
Contact   Jalinoos, Frank
Project Start   4/2/12
Project End   12/31/14
Project Status   Programmed

[FHWA-PROJ-11-0108] : Characterizing Unknown Foundations to Improve Bridge Safety

Project ID   FHWA-PROJ-11-0108 Click to view document
Contact   Jalinoos, Frank
Project Start   4/2/12
Project End   1/31/14
Project Status   Active

[FHWA-PROJ-11-0160] : Ultra-High Performance Concrete (UHPC) – State of the Art 2012

Project ID   FHWA-PROJ-11-0160 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   8/1/11
Project End   8/30/13
Project Status   Completed

[FHWA-PROJ-11-0161] : Development of Nonproprietary Ultra-High Performance Concrete (UHPC)

Project ID   FHWA-PROJ-11-0161 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   8/15/11
Project End   10/31/13
Project Status   Completed

[FHWA-PROJ-11-0170] : Expert System Signal Operation Analysis Tool, Phase II

Project ID   FHWA-PROJ-11-0170 Click to view document
Contact   Huang, Peter
Project Start   10/24/11
Project End   11/1/13
Project Status   Active

[FHWA-PROJ-11-0171] : Exploration of Integrated Vehicle-Based Safety Systems Naturalistic Driving Data

Project ID   FHWA-PROJ-11-0171 Click to view document
Contact   Lochrane, Taylor
Project Start   2/25/11
Project End   2/8/13
Project Status   Completed

[FHWA-PROJ-11-0173] : Geosynthetic Reinforced Soil Design

Project ID   FHWA-PROJ-11-0173 Click to view document
Contact   Adams, Michael
Project Start   10/1/11
Project End   12/31/15
Project Status   Active

[FHWA-PROJ-11-0175] : Forensic Tool Box

Project ID   FHWA-PROJ-11-0175 Click to view document
Contact   Arnold, Terry
Project Start   11/1/11
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-11-0177] : In Situ (Field) Scour and Erosion Testing Device

Project ID   FHWA-PROJ-11-0177 Click to view document
Contact   Kerenyi, Kornel
Project Start   7/1/11
Project End   3/31/16
Project Status   Active

[FHWA-PROJ-11-0178] : Influence of Large-Scale Turbulence Structures on Scour

Project ID   FHWA-PROJ-11-0178 Click to view document
Contact   Kerenyi, Kornel
Project Start   3/8/12
Project End   1/31/16
Project Status   Active

[FHWA-PROJ-11-0180] : Imaging of Aggregates Using Aggregate Imaging System (AIMS) II

Project ID   FHWA-PROJ-11-0180 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   10/1/11
Project End   9/30/13
Project Status   Active

[FHWA-PROJ-11-0188] : Optimized Shear Stud Spacing for Precast Deck Panel Construction

Project ID   FHWA-PROJ-11-0188 Click to view document
Contact   Ocel, Justin
Project Start   6/1/11
Project End   1/1/15
Project Status   Active

[FHWA-PROJ-11-0189] : Compression Response of a Rapid-Strengthening Ultra-High Performance Concrete Formulation

Project ID   FHWA-PROJ-11-0189 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   8/1/11
Project End   9/30/12
Project Status   Completed

[FHWA-PROJ-12-0001] : Development of Concrete Paving Mixture Design for Long-Term Performance

Project ID   FHWA-PROJ-12-0001 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   1/1/12
Project End   9/30/13
Project Status   Proposed

[FHWA-PROJ-12-0004] : Abutment Interface Experiments for Integrated Approaches

Project ID   FHWA-PROJ-12-0004 Click to view document
Contact   Nicks, Jennifer E
Project Start   1/7/13
Project End   9/30/16
Project Status   Active

[FHWA-PROJ-12-0005] : Feasibility of Using Surface Resistivity of Concrete for Measuring Permeability

Project ID   FHWA-PROJ-12-0005 Click to view document
Contact   Ardani, Ahmad
Project Start   1/5/12
Project End   12/28/13
Project Status   Active

[FHWA-PROJ-12-0006] : Application of Laser Shearography to Asphalt Issues

Project ID   FHWA-PROJ-12-0006 Click to view document
Contact   Youtcheff, Jack
Project Start   10/1/12
Project End   5/31/15
Project Status   Active

[FHWA-PROJ-12-0014] : Develop Concept of Operations and High-Level Requirements for the Dynamic Mobility Application (DMA) Freeway Bundle Integrated Network Flow Optimization (INFLO)

Project ID   FHWA-PROJ-12-0014 Click to view document
Contact   Yousuf, Mohammed
Project Start   9/14/11
Project End   12/31/12
Project Status   Completed

[FHWA-PROJ-12-0025] : Performance Evaluation of Prestressing Strands for Concrete Bridges With Chloride Contaminated Grout

Project ID   FHWA-PROJ-12-0025 Click to view document
Contact   Ghasemi, Hamid
Project Start   2/1/12
Project End   12/31/13
Project Status   Completed

[FHWA-PROJ-12-0038] : Service Limit State Design and Analysis of Engineered Fills for Bridge Support

Project ID   FHWA-PROJ-12-0038 Click to view document
Contact   Nicks, Jennifer E
Project Start   1/1/13
Project End   4/23/17
Project Status   Active

[FHWA-PROJ-12-0039] : Laboratory Testing of Aggregates for Road and Bridge Construction

Project ID   FHWA-PROJ-12-0039 Click to view document
Contact   Nicks, Jennifer E
Project Start   3/25/13
Project End   12/31/15
Project Status   Active

[FHWA-PROJ-12-0040] : Small-Scale Viscoelastic Continuum Damage (VECD) Protocol

Project ID   FHWA-PROJ-12-0040 Click to view document
Contact   Gibson, Nelson H
Project Start   6/4/12
Project End   6/4/14
Project Status   Active

[FHWA-PROJ-12-0041] : Asphalt Mix Compaction Modeling

Project ID   FHWA-PROJ-12-0041 Click to view document
Contact   Gibson, Nelson H
Project Start   6/4/12
Project End   6/4/15
Project Status   Terminated

[FHWA-PROJ-12-0052] : Collection of Data for Performance-Management of Walls, Slopes, and Nonbridge, Nonpavement Assets

Project ID   FHWA-PROJ-12-0052 Click to view document
Contact   Adams, Michael
Project Start   10/1/11
Project End   12/31/16
Project Status   Active

[FHWA-PROJ-12-0053] : Fatigue of Plasma and Laser Cut Holes

Project ID   FHWA-PROJ-12-0053 Click to view document
Contact   Ocel, Justin
Project Start   6/1/12
Project End   1/1/15
Project Status   Active

[FHWA-PROJ-12-0055] : Covered Bridge Preservation Research, Development, and Technology: Interagency Agreement II with the Forest Service, Forest Products Laboratory

Project ID   FHWA-PROJ-12-0055 Click to view document
Contact   Duwadi, Sheila R
Project Start   7/2/12
Project End   9/30/19
Project Status   Active

[FHWA-PROJ-12-0065] : Development of a Rapid Method for Quality Assurance of Entrained Air-Void Properties in Hardened Concrete

Project ID   FHWA-PROJ-12-0065 Click to view document
Contact   Meininger, Richard C (Rick)
Project Start   7/1/12
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-12-0066] : Asphalt Component and Additive Compatibility

Project ID   FHWA-PROJ-12-0066 Click to view document
Contact   Youtcheff, Jack
Project Start   10/1/12
Project End   12/31/13
Project Status   Active

[FHWA-PROJ-12-0069] : Cooperative Adaptive Cruise Control

Project ID   FHWA-PROJ-12-0069 Click to view document
Contact   Philips, Brian
Project Start   3/16/12
Project End   9/14/12
Project Status   Completed

[FHWA-PROJ-12-0097] : Development of Advanced Connection Systems for Adjacent Concrete Box Beams

Project ID   FHWA-PROJ-12-0097 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   10/1/12
Project End   10/31/14
Project Status   Active

[FHWA-PROJ-12-0098] : Saxton Transportation Operations Laboratory TO-13003: Improved Data Collection for Work Zone Gap Acceptance Field Test

Project ID   FHWA-PROJ-12-0098 Click to view document
Contact   Lochrane, Taylor
Project Start   4/1/12
Project End   9/20/13
Project Status   Completed

[FHWA-PROJ-12-0102] : Rapid Load Rating of Concrete Bridges

Project ID   FHWA-PROJ-12-0102 Click to view document
Contact   Rivers, Benjamin
Project Start   6/1/12
Project End   6/18/13
Project Status   Active

[FHWA-PROJ-12-0103] : Condition Assessment of a Mechanically Stabilized Earth (MSE) Wall

Project ID   FHWA-PROJ-12-0103 Click to view document
Contact   Nicks, Jennifer E
Project Start   7/2/12
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-12-0106] : Splice Length of Prestressing Strand in Field-Cast Ultra-High Performance Concrete Connections

Project ID   FHWA-PROJ-12-0106 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   2/1/12
Project End   1/31/14
Project Status   Completed

[FHWA-PROJ-13-0004] : Wrap-up of Various Corrosion Studies

Project ID   FHWA-PROJ-13-0004 Click to view document
Contact   Virmani, Paul
Project Start   12/31/13
Project End   12/31/15
Project Status   Proposed

[FHWA-PROJ-13-0009] : General Laboratory Support for Coating and Corrosion

Project ID   FHWA-PROJ-13-0009 Click to view document
Contact   Virmani, Paul
Project Start   12/31/12
Project End   12/31/15
Project Status   Active

[FHWA-PROJ-13-0014] : Fiber-Reinforced Polymer (FRP) Applications in Hazard Mitigations (Seismic, Blast, Impact, etc.)

Project ID   FHWA-PROJ-13-0014 Click to view document
Contact   Munley, Eric P
Project Start   1/31/13
Project End   7/12/15
Project Status   Active

[FHWA-PROJ-13-0017] : Pavement Research Database

Project ID   FHWA-PROJ-13-0017 Click to view document
Contact   Weaver, Eric J
Project Start   4/7/14
Project End   12/30/16
Project Status   Active

[FHWA-PROJ-13-0029] : Saxton Transportation Operations Laboratory TO-13005: Development of a Platform Technology for Automated Vehicle Research

Project ID   FHWA-PROJ-13-0029 Click to view document
Contact   Lochrane, Taylor
Project Start   6/13/13
Project End   4/2/15
Project Status   Active

[FHWA-PROJ-13-0030] : Saxton Transportation Operations Laboratory TO-13004: Simulation for Research on Automated Longitudinal Vehicle Control

Project ID   FHWA-PROJ-13-0030 Click to view document
Contact   Lochrane, Taylor
Project Start   7/1/13
Project End   9/14/15
Project Status   Active

[FHWA-PROJ-13-0031] : Dimensional Stability of Prebagged Grouts for Prefabricated Bridge Element and System Connections

Project ID   FHWA-PROJ-13-0031 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   1/1/13
Project End   11/30/14
Project Status   Active

[FHWA-PROJ-13-0032] : Protocols for Evaluating the Properties and Performance of Alternative Cementitious Materials (ACMs) for Use in Highway Applications

Project ID   FHWA-PROJ-13-0032 Click to view document
Contact   Ardani, Ahmad
Project Start   1/15/13
Project End   12/31/17
Project Status   Active

[FHWA-PROJ-13-0034] : Integrated Vehicle-to-Infrastructure Prototype Development

Project ID   FHWA-PROJ-13-0034 Click to view document
Contact   Curtis, Deborah M
Project Start   9/9/13
Project End   9/9/14
Project Status   Programmed

[FHWA-PROJ-13-0038] : Fracture Resistance of Cold Bent Steel

Project ID   FHWA-PROJ-13-0038 Click to view document
Contact   Ocel, Justin
Project Start   3/1/13
Project End   8/30/15
Project Status   Active

[FHWA-PROJ-13-0039] : Field Data Collection of Truck Spray

Project ID   FHWA-PROJ-13-0039 Click to view document
Contact   Ocel, Justin
Project Start   9/1/13
Project End   8/1/14
Project Status   Active

[FHWA-PROJ-13-0040] : Steel Bridge Coatings Topics

Project ID   FHWA-PROJ-13-0040 Click to view document
Contact   Ocel, Justin
Project Start   8/1/13
Project End   11/28/14
Project Status   Active

[FHWA-PROJ-13-0048] : Saxton Transportation Operations Laboratory TO-13010: Workshop on Analysis of Network and Nonnetwork Impacts Upon Traveler Choice

Project ID   FHWA-PROJ-13-0048 Click to view document
Contact   Lochrane, Taylor
Project Start   6/10/13
Project End   10/9/13
Project Status   Completed

[FHWA-PROJ-13-0073] : Traffic Bottleneck Identification and Diagnosis, Countermeasure Prioritization, and Innovative Solutions to Local/Systemic Problems

Project ID   FHWA-PROJ-13-0073 Click to view document
Contact   Bared, Joe
Project Start   5/23/13
Project End   2/27/16
Project Status   Active

[FHWA-PROJ-13-0074] : Saxton Transportation Operations Laboratory TO-13011: User Friendly Traffic Incident Management (TIM) Program Benefit-Cost Estimation Tool

Project ID   FHWA-PROJ-13-0074 Click to view document
Contact   Lochrane, Taylor
Project Start   9/23/13
Project End   9/22/15
Project Status   Active

[FHWA-PROJ-13-0075] : Saxton Transportation Operations Laboratory TO-13002: Highway Capacity Manual (HCM) Guidance for Alternative Intersections

Project ID   FHWA-PROJ-13-0075 Click to view document
Contact   VanGorder, Randy
Project Start   4/4/13
Project End   10/3/15
Project Status   Active

[FHWA-PROJ-13-0085] : Development Length of Reinforcing Bars in Field-Cast Grouts

Project ID   FHWA-PROJ-13-0085 Click to view document
Contact   Graybeal, Benjamin A (Ben)
Project Start   6/1/13
Project End   12/31/14
Project Status   Active

[FHWA-PROJ-13-0099] : TO-14020: Lane Change/Merge Fundamental Research: Phase 1

Project ID   FHWA-PROJ-13-0099 Click to view document
Contact   Dailey, Daniel
Project Start   7/1/13
Project End   10/1/15
Project Status   Programmed

[FHWA-PROJ-13-0100] : TO – 14022: Speed Harmonization Fundamental Research

Project ID   FHWA-PROJ-13-0100 Click to view document
Contact   Dailey, Daniel
Project Start   7/30/14
Project End   9/30/15
Project Status   Proposed

[FHWA-PROJ-14-0004] : Pavement Safety Performance (PSP) Data Analysis Program

Project ID   FHWA-PROJ-14-0004 Click to view document
Contact   Sherwood, James A
Project Start   3/5/14
Project End   1/6/17
Project Status   Active

[FHWA-PROJ-14-0005] : Hydration Kinetics of High-Volume Fly Ash Mixtures for Concrete Paving Applications

Project ID   FHWA-PROJ-14-0005 Click to view document
Contact   Arnold, Terry
Project Start   3/3/14
Project End   12/31/20
Project Status   Proposed

[FHWA-PROJ-14-0027] : New Approaches for Testing Connected Highway and Vehicle Systems

Project ID   FHWA-PROJ-14-0027 Click to view document
Contact   Huang, Peter
Project Start   1/2/14
Project End   12/30/16
Project Status   Active

[FHWA-PROJ-14-0058] : Interactive Highway Safety Design Model 2

Project ID   FHWA-PROJ-14-0058 Click to view document
Contact   Chen, Shyuan-Ren (Clayton)
Project Start   9/23/14
Project End   9/22/17
Project Status   Active

[FHWA-PROJ-14-0115] : Scour Evaluation Studies: Scour in Cohesive Soils and Ex Situ Scour Testing Device - Phase II

Project ID   FHWA-PROJ-14-0115 Click to view document
Contact   Kerenyi, Kornel
Project Start   2/26/14
Project End   9/30/17
Project Status   Active