Design/Build Contracts and Right of Way -2001 This report summarizes the characteristics of a DB Project, recommendations and best practices for DB contracting and essential considerations.
TCRP Document 41 : Evaluation of Project Delivery Methods (2008) This report documents the benefits and disadvantages of various project delivery methods such as Design-Bid-Build and Design-Build and provides guidelines for selecting the most appropriate delivery method.