U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000
Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations
Project Information | ||
Project ID: | FHWA-PROJ-14-0020 | |
Project Name: | Identification of Effective Next Generation Pavement Performance Measures and Asset Management Methodologies to Support MAP-21 Performance Management Requirements | |
Project Status: | Active | |
Start Date: | October 1, 2014 | |
End Date: | December 31, 2015 | |
Contact Information | ||
Last Name: | Sivaneswaran | |
First Name: | Nadarajah (Siva) | |
Telephone: | 202-493-3147 | |
E-mail: | nadarajah.sivaneswaran@dot.gov | |
Office: | Office of Infrastructure Research and Development | |
Team: | Infrastructure Analysis and Construction Team [HRDI-20] | |
Program: | Innovative Pavement Research and Deployment | |
Project detail | ||
Roadmap/Focus area(s): | Infrastructure Research and Technology Strategic Plan and Roadmap | |
Project Description: | The study involves: (1) The identification or conceptual development of a more strategic pavement performance measure that can be used to effectively and timely assess that investments are made to maintain the highway infrastructure asset system in a state of good repair as it relates to pavement assets. USDOT TIGER II Guidance issued in 2010 by the Department of Transportation, Office of the Secretary, under Docket No. DOTOST20100076 defined the State of Good Repair (SGR) as improving the condition of existing transportation facilities and systems, with particular emphasis on projects that minimize life-cycle costs. (2) The identification or conceptual development methodologies to guide full implementation of comprehensive asset management, including trade-off analysis from a common ground among disparate assets that are traditionally individually assessed and managed. Section 1106 of MAP-21 defines asset management a strategic and systematic process of operating, maintaining, and improving physical assets, with a focus on both engineering and economic analysis based upon quality information, to identify a structured sequence of maintenance, preservation, repair, rehabilitation, and replacement actions that will achieve and sustain a desired state of good repair over the lifecycle of the assets at minimum practicable cost. The scope of this effort is limited to identification or conceptual development only. Development, validation, and pilot implementation of promising concept(s), if any, will be pursued in a follow on effort. It is also anticipated that there may be multiple approaches that may merit consideration and that some may draw from approaches in use outside transportation and from international experience. | |
Goals: |
The primary objectives of this contract are to:
(1) Identify or conceptually develop more strategic pavement performance measures, and their means of collection, in order to strengthen performance management and better link investments to long-term performance. Consideration shall include how the data supporting the next generation method would be collected, analyzed, and presented and the advantages of using this type of performance measure.
(2) Identify or conceptually develop methodologies to guide full implementation of a comprehensive asset management plan, including trade-off analysis from a common ground among disparate assets that are traditionally individually assessed and managed.
|
|
Product Type: | Research report | |
Test Methodology: | Conceptual development | |
Expected Benefits: | Conceptual strategic pavement performance measures, and their means of collection, in order to strengthen performance management and better link investments to long-term performance. Conceptual methodologies for full implementation of a comprehensive asset management plan, including trade-off analysis from a common ground among disparate assets that are traditionally individually assessed and managed. | |
Deliverables: | Name: Final report. Product Type(s): Research report Description: The deliverable is a final report documenting the entire research effort, findings, and conceptual ideas for strategic pavement performance measures, and their means of collection, in order to strengthen performance management and better link investments to long-term performance and methodologies to guide full implementation of a comprehensive asset management plan, including trade-off analysis from a common ground among disparate assets that are traditionally individually assessed and managed. | |
FHWA Topics: | Research/Technologies--FHWA Research and Technology | |
TRT Terms: | Pavements Performance Management Pavement Management Systems Construction Infrastructure Research |
|
FHWA Disciplines: | Pavement and Materials |
|
Subject Areas: | Pavements |
|