Gerald Yakowenko, Gerald.Yakowenko@dot.gov,
202-366-1562 |
General inquiries regarding Federal-aid Construction Contract Administration |
|
Jennifer Balis, Jennifer.Balis@dot.gov,
202-493-7302 |
Contract Administration Core Curriculum Manual |
|
Specifications |
HIAP-30 (Cawley) |
Standard specifications and standard plans |
|
Basis of contract award (method of construction) |
|
Alternative contracting methods |
|
Contract time |
|
Life cycle cost analysis |
HIPM-10 (Coley) |
Road user cost analysis |
|
Time-related incentive/disincentives |
|
Quality price adjustment clauses |
HIAP-10 (Withee)
HIAP-30 (Cawley) |
Commodity price escalation clauses |
|
Constructability reviews |
HIAP-30 (Cawley) |
Value engineering |
HIPA-20 (Leuderalbert) |
Bonding Requirements |
|
Prequalification |
|
Advertising for bids |
|
Bid opening |
|
Bid analysis |
|
Contract award |
|
Contract changes |
|
Time extensions |
|
Equipment rental rates |
|
Project documentation |
|
Progress payments |
|
Standardized changed condition clauses |
|
Claims |
|
Contract termination |
|
Construction engineering |
|
Alternate dispute resolution |
HIAP-30 (Cawley) |
Liquidated damages |
|
Project close-out |
HIAP-30 (Cawley) |
Emergency Relief Contracting |
HIPA-10 (Wolf) |
ITS project procurement |
HOTM-1 (Clinger) |
Transportation Alternatives Program (TAP) |
HEPH-10 (Douwes) |
Recreational Trails Program |
HEPH-10 (Douwes) |
Safe Routes to Schools |
HEPH-10 (Blount) |
Scenic Byways |
HEPH-10 (Blount) |
Major project requirements |
HIPD-1 (Sinnette) |
Owner Controlled Insurance (aka wrap-up insurance) |
|
Julie Trunk, Julie.Trunk@dot.gov,
202-366-4639 |
Required Contract Provisions (FHWA Form 1273) |
|
Nondiscrimination |
HCR-20 (McWhorter) |
Non-segregated facilities |
|
EEO |
HCR-20 (McWhorter) |
Prevailing wage rates |
|
Statements and payrolls |
|
Convict labor |
|
State/local hiring preferences |
|
Job site safety (OSHA) |
|
Project labor agreements |
|
On-the-job training |
|
Subletting or assigning the contract |
|
Prime contractor self-performance |
|
Subcontracting |
|
Disadvantaged Business Enterprise |
HCR-30 (Kenley) |
Retainage |
|
Prompt payment |
|
Implementation of Clean Air Act and Federal Water Pollution Control Act |
|
Certification regarding the use of contract funds for lobbying |
|
Appalachian Development Highway Contract employment preference |
HIPA-10 (Kleskovic) |
Indian preference on FA projects |
|
Veterans employment provision |
|
False statements concerning highway projects |
|
Project Supervision and Staffing |
|
Drug-free workplace |
|
Jobsite poster requirements |
|
Debarment, suspension, ineligibility, and voluntary exclusion |
HCC-30 (MacPhee) |
Edwin Okonkwo, Edwin.Okonkwo@dot.gov,
202-366-1558 |
Buy America |
|
Metrication |
|
Foreign contractor and supplier restriction |
|
Engineer’s Estimates |
|
John Huyer, John.Huyer@dot.gov,
651-291-6111 |
Public agencies in competition with the private sector |
|
Public interest findings/ certifications/cost effectiveness findings |
|
Publicly owned equipment |
|
Contractor purchased equipment for state ownership |
|
Convict produced materials |
|
Patented/proprietary materials |
|
State preference |
|
State owned/furnished/designated materials |
|
Salvaged materials |
|
Pipe material selection |
|
Replacement parts |
|
Recycled materials |
HIAP-10 (Bukowski) |
Construction inspection |
HIAP-30 (Cawley) |
Quality assurance |
HRDI-20 (Petros)
HIAP-20 (Withee) |
Electronic contracting |
|
Innovative Contracting Special Experimental Project No. 14 (SEP-14) |
|
Product Selection Processes (NTPEP) |
HIAP-20 (Withee) |
Other related areas |
Suspension / Debarment Program |
HCC-30 (MacPhee) |
Engineering Services / Consultant Procurement |
HIPA-20 (McAvoy) |
Stewardship and Oversight of Federal-aid Construction Projects |
HIPA-40 (Ibrahim) |
SEP-14 Techniques (Yakowenko/Balis/Huyer) |
|
Cost plus Time Bidding |
|
Lane Rental |
|
Warranties |
|
Alternate Contracting Methods Library |
RC - Elliott, Lewis |
Design Build Project Delivery |
RC - Lewis |
CMGC Project Delivery |
RC - Haynes, Atkins |
Alternate Technical Concepts |
RC - Unkefer |
Alternate Pavement Type Bidding |
HIAP-20 (Ahlstrom) |
Best Value Project Delivery |
|
Indefinite delivery/indefinite quantity (ID/IQ) |
|