Also available as Adobe PDF (1 MB)
PDF files can be viewed with the Acrobat® Reader®
The Federal Highway Administration's FHWA)'s Climate Resilience Pilot Program seeks to assist state Departments of Transportation (DOTs), Metropolitan Planning Organizations (MPOs), and Federal Land Management Agencies (FLMAs) in enhancing resilience of transportation systems to extreme weather and climate change. In 2013-2015, nineteen pilot teams from across the country partnered with FHWA to assess transportation vulnerability to extreme weather events and climate change and evaluate options for improving resilience. For more information about the pilots, visit: http://www.fhwa.dot.gov/environment/climate_change/adaptation/
Washington State Department of Transportation (WSDOT) examined adaptation options in the Skagit River Basin (Basin), a highly vulnerable area of the state. The Basin was the focus of a major flood risk reduction study by the U.S. Army Corps of Engineers (Corps). WSDOT worked with the Seattle District of the Corps and the Skagit County Public Works Department to identify vulnerabilities and opportunities for flood risk reduction. This pilot demonstrated the importance of coordinating transportation adaptation planning with other ongoing flood risk reduction efforts like the Skagit River Flood Risk Management General Investigation Study (GI study).
WSDOT identified the project area as highly vulnerable in its 2011 statewide climate vulnerability assessment. The area encompassed the lower Skagit River Basin, located in northwestern Washington State, including the cities of Burlington, Mount Vernon, and Sedro-Woolley, as well as sections of Interstate 5 and State Routes (SR) 9, 20, 11, 534, 536, and 538 (see Figure 4). The project focused on adaptation strategies that would increase resilience of major transportation infrastructure to flood risk.
Compile climate and flooding data. The WSDOT pilot team began by reviewing results from the 2011 Climate Impacts Vulnerability Assessment (CIVA) and then conducted a series of interviews and workshops to gather additional information about the study area. Data collection efforts included:
Review Corps' GI Study. In June 2014, the Corps released their GI study and draft Environmental Impact Statement (EIS), which provided detailed information on existing conditions and conceptual information about the action alternatives and the Future without Corps' Project. WSDOT reviewed these resources and found a wealth of information on water movement in the Basin, including output from the Corps' FLO-2D floodplain model that included water surface elevation and depth grids for flood scenarios of various return interval floods and levee failures. The Corps was not able to provide model output data for the "no action" or TSP alternative, but plans to provide them once complete.
Analyze Corps' Flood Model data. WSDOT Geographic Information System (GIS) and hydraulics experts worked together to process the data into information that would be useful in determining impacts to transportation infrastructure. The pilot team identified 35 data sets in the GIS database and overlaid them on the 23 areas of concern from the interviews. This analysis revealed that there were many individual areas of concern that were impacted by similar events. In addition, the areas of concern were connected by a highway segment, and when one area of concern was affected on that segment, the same event affected other areas of concern as well. The team refined the list to 11 highway segments for further consideration. By calculating the inundation of the assets, they found that most of the areas of concern identified during the interview process were consistent with the flood analysis results. For each of the 11 segments, the pilot team created a site-specific vulnerability profile. Each profile describes the key features of the segment in terms of highway location and functions, drainage issues, updated vulnerability assessment given Corps' hydraulic data; and discussion of the team's brainstorm of adaptation strategies. Figure 4 shows the results of the flood analysis.
Develop adaptation strategies. The team developed structural and non-structural strategies to address the issues identified through analysis of the flood model data. The strategies included general broad structural actions (design and construction) and nonstructural solutions (planning, detour routes, and partnerships). A hydrologist and stormwater engineer analyzed the structural strategies to assess their feasibility. The team then refined the strategies based on their feedback.
Flooding Impacts. The project allowed WSDOT planners and hydraulic engineers to delve deeply into the Corps' new data on existing conditions. WSDOT estimated the impacts associated with the Corps' action alternative (which is designed to reduce urban flood hazard by improving and raising existing levees and adding new levees). The team's analysis found that 90 percent of I-5 in Skagit County, as well as the rest of the highway system, is estimated to be at risk of flooding without the TSP. The TSP could eliminate issues seen during the existing 1% ACE flood on the southern and central portions of I-5. The TSP is anticipated to direct floodwaters to some sections that were not identified as highly vulnerable in the qualitative assessment and to maintain or worsen conditions in some areas.
Adaptation strategies. The pilot team concluded that the right adaptation strategies for WSDOT may change depending on whether the Corps builds or doesn't build the TSP. With that in mind, WSDOT identified "no regrets" strategies that would improve transportation infrastructure resilience regardless of future work by the Corps. WSDOT identified five strategies categorized as "no regrets" by the end of the study. Examples of some of the brainstormed strategies are shown in Table 1.
Highway Segments — The Project Team Brainstormed the Following Options | Strategies | ||
---|---|---|---|
Future without Corps' Project | Tentatively Selected Plan | No Regrets | |
Segment 1: Central I-5 Anderson Road to George Hopper Road |
|||
|
x | x | x |
|
x | x | |
|
x | ||
Segment 2: SR 20 East of Burlington to Sedro-Woolley |
|||
|
?[1] | x | x |
|
x | x | ? |
|
x | ||
Segment 3: SR 538 Nookachamps Basin — SR 9 to I-5 |
|||
|
x | x | x |
Collaborate with and leverage local and federal flood hazard mitigation planning efforts. WSDOT found that collaboration with flood risk managers is critical for transportation agencies as they develop adaptation strategies. During adaptation strategy development, specific examples were uncovered where WSDOT could have invested in the wrong place if the team had been unaware of the Corps' TSP or local flood improvements. Similarly, WSDOT flood adaptation strategies could affect assumptions in the Corps' study. Partners can also provide useful data to share. For example, flood modeling data from the Corps served as a tool for WSDOT to analyze flood impacts and levee breech scenarios under existing and changing climate conditions.
Knowing what data are available and what is still unknown can help streamline the timeline for the analysis. It can also eliminate the dependence on others' timelines. It is preferable and simpler if existing studies are complete and all data are available before beginning analysis. Transportation agencies do not need to wait for a new flood study to be undertaken, however; they can look at past studies and augment the prior work with climate change data from other sources.
The FHWA Climate Change and Extreme Weather Vulnerability Assessment Framework was useful for navigating the process. It helped tie the first vulnerability assessment to the more detailed Skagit River Basin study.
Workshops and interviews with stakeholders were effective. The analysis validated the workshop and interview process. Through a GIS and hydraulic analysis, the pilot team found that most of the areas of concern identified during the 2011 qualitative vulnerability assessment and the interview process for this pilot were consistent with the flood analysis results. The analysis also identified additional vulnerable locations that the interviews did not. Both processes complement each other and should be used together for watershed-level adaptation strategy development.
Project teams should provide local knowledge and the right technical skills. Having staff on the team who knew the local area and the people involved in climate adaptation work was critical for the success of this project. WSDOT also learned the importance of having staff available with the right technical skills (e.g., flood data analysis and GIS) as well as capacity to dedicate to the project. During hydraulics analyses, WSDOT used staff with resource-specific understanding and local familiarity to better understand data gaps.
Continue working to integrate climate into decisions. WSDOT will work with the community on integrated long-range transportation/land use and emergency planning in Skagit County. At a state level, WSDOT will integrate what they have learned from this project into corridor planning and transportation studies (particularly in other vulnerable basins with ongoing flood hazard reduction efforts).
Lead by example in fostering greater integration of related local, state, and federal planning efforts.
"Transportation agencies must collaborate with flood risk managers during adaptation strategy development. We uncovered specific examples where WSDOT — if we had been unaware of the Corps' tentatively selected plan or local flood improvements — could have invested in the wrong place." – WSDOT Pilot Team
www.fhwa.dot.gov/environment/climate/adaptation/2015pilots/
Carol Lee Roalkvam
Environmental Policy Branch Manager
Washington State Department of Transportation
roalkvc@wsdot.wa.gov, 360-705-7126
Becky Lupes
Sustainable Transport & Climate Change Team
Federal Highway Administration
Rebecca.Lupes@dot.gov, 202-366-7808
[1] A "?" indicates that more information or analysis of potential benefits is needed.