You are here

Bus Rapid Transit

  • 2008 Bus Rapid Transit Vehicle Demand & Systems Analysis Update (PDF)
  • BRT Network Planning Study - Final Report (PDF) - Advanced Network Planning for Bus Rapid Transit The “Quickway” Model as a Modal Alternative to “Light Rail Lite”
  • Bus Rapid Transit and the American Community
  • Bus Rapid Transit Developments in China, April 2006 - Report of National Bus Rapid Transit Institute's 2006 mission to China to better understand the urban transportation problems and solutions.
  • Bus Rapid Transit Vehicle Characteristics (PDF) - Vehicle issues related to BRT.
  • Bus Rapid Transit: A Handbook for Partners - Improve state, regional, local communications to implement BRT
  • Bus Rapid Transit: Report on South American BRT Field Visits - Tracking the Evolution of the TransMilenio Model (PDF)
  • The Characteristics of Accessible Bus Rapid Transit (MS Word) - Examines Bus Rapid Transit and highlights major elements that affect accessibility.
  • Characteristics of Bus Rapid Transit for Decision-Making (2004) - Comprehensive guide to BRT components and performance
  • Characteristics of Bus Rapid Transit for Decision-Making (2009) - Comprehensive guide to BRT components and performance, and an update of the 2004 document.
  • FTA report 0004 - Metro Orange Line BRT Project Evaluation (October 2011) (PDF) - This report contains a comprehensive overview of the Orange Line, including a historical narrative; a profile of project elements, project costs, issues in planning, design, and implementation; technology applications; and a “lessons learned” summary.
  • The EmX Franklin Corridor BRT Project Evaluation - Project evaluation of the EmX Franklin Corridor BRT, a Bus Rapid Transit project funded by the Federal Transit Administration in the Eugene-Springfield metropolitan area in Oregon.
  • Las Vegas MAX Evaluation (MS Word) - Second evaluation of the Las Vegas MAX BRT project to determine the full effects of its implementation as the system matured.
  • Miami UPA Phase 1 Transit Evaluation Report (January 2011) (PDF) -- Evaluation of the Miami Urban Partnership Agreement (UPA) Phase 1 improvements on transit. Miami is one of the United States Department of Transportation’s (USDOT) UPA sites. Phase 1 involved the conversion of a single high occupancy vehicle (HOV) lane in both directions to two high occupancy toll (HOT) lanes, employing dynamic pricing, in both directions on Interstate 95 between downtown Miami and Golden Glades Interchange, along with additional 95 Express Bus service, and Travel Demand Management (TDM) and Intelligent Transportation Systems (ITS) enhancements. The report discusses the impacts of Phase 1 improvements on transit performance, ridership, mode shift to transit, and congestion mitigation.
  • Miami Urban Partnership Agreement (UPA) Project Phase 1A (PDF)– Transit Evaluation Report - Evaluation of the transit elements of Phase 1A of the Miami UPA project. Miami is one of the United States Department of Transportation (USDOT)’s Urban Partnership Agreement (UPA) program sites. The project involved replacing the existing High Occupancy Vehicle (HOV) lanes with ‘95 Express Lanes’ which are based on the High Occupancy Toll (HOT) concept, supported by transit, Travel Demand Management (TDM), and Intelligent Transportation Systems enhancements. Report discusses the impacts of Phase 1A improvements on transit performance, mode shift to transit, and congestion mitigation. Phase 1A was implemented in December 2008 providing new ’95 Express Lanes’ on the northbound direction of I-95 between downtown Miami and Golden Glades Interchange.
  • Pittsburgh West Busway BRT Evaluation - April 2003 (PDF) - Evaluation of one of FTA's BRT demonstration projects, Pittsburgh, PA's West Busway.
Updated: Wednesday, March 16, 2016
Submit Feedback >