Construction Cycle 5

Construction Cycle 5 (CC5) Flexible Test Items

Construction Cycle Data

This construction cycle has the following sub-pages:

 

1. Test Objective 7. Material Testing Reports 
2. Test Plan 8. Painting Plan 

2a. Gear Configuration

9. Profiler Data/Rut Depths (HMA)

2b. Wheel Load/Tire Pressure

10. Post Traffic Testing

2c. Wander Pattern

10a. Trenching

3. Pavement Construction/Cross Section

10b. CBR

4. Instrumentation Plan

10c. HWD

5. NDT Plan & Data 11. Search CC5 Database
6. Material Characterization Plan & Data